How it works

Four steps. Only one of them is yours.

You keep running payroll the way you do now. After payroll runs, upload the export. We turn it into a checked WH-347 package and your state's file, and you sign.

  1. 1

    Upload your payroll

    The QuickBooks, Gusto or ADP export you already have, or any CSV, Excel file or PDF payroll register. Weekly or bi-weekly.

  2. 2

    Confirm your crew

    Pick each worker's classification from your WD (remembered next week), J or RA, and daily hours if your file only has totals.

  3. 3

    We check every line

    Every number recomputed in cents against your WD. Anything code cannot confirm goes to a person.

  4. 4

    You sign and send

    Download the package, sign the Statement of Compliance, send it to your prime, or one-click email it to them.

Step 1: set up once

Your project, your WD, your rates.

Create a project with its state, county and construction type. We suggest the wage determination and its current modification; you confirm the one in your contract. Then pick the classifications your crew uses, and the fringe plans you pay into (or "we pay fringe in cash").

  • Federal and state projects

    Davis-Bacon WDs from SAM.gov, or state rates you enter with their source.

  • Apprentices

    Program name, OA or SAA, the period's wage percentage and the apprentice fringe.

Step 1: every week

The files we read.

SourceExportDaily hours in the file?
QuickBooks Online PayrollPayroll Details or Payroll Summary by Employee (CSV or Excel)No, you enter days in the grid
QuickBooks TimeTime Activities by Employee DetailYes
GustoPayroll Journal (CSV); Time Tracking HoursJournal no; time export yes
ADP RUN, Workforce NowPayroll register or payroll details (CSV or Excel); timecard exportRegister no; timecards yes
Anything elseAny CSV or Excel file with a header rowIf it has a date column
Paper or PDFA PDF payroll register or scanned pay stubsIf present
PDF and unfamiliar layouts are read twice, independently, and any disagreement goes to a person. Every number used is shown to you on the confirm screen.

Step-by-step export guides: QuickBooks · Gusto · ADP

Step 3

Every check, in plain words.

Money is computed in whole cents and hours in hundredths, so nothing drifts. A check either stops the report and tells you exactly what to fix, sends it to a person for a second look, or adds a note to the summary.

  • Base rate against the WD

    The straight-time rate paid is at least the WD base for the classification; for apprentices, the program percentage of the journeyworker rate. Below-WD pay is never shipped.

    Stops the report
  • Fringe met for every hour

    Rate paid above base, plus cash in lieu, plus plan credit, covers the WD fringe on every hour, overtime hours included.

    Stops the report
  • Overtime over 40

    Hours over 40 in the workweek (this project plus other work you tell us about) are on the OT line, paid at least 1.5 times the base rate.

    Stops the report
  • California daily overtime

    On California projects, hours over 8 in a day are overtime.

    Flagged
  • Hours add up

    Daily ST and OT hours add up to the weekly total, and the weekly total matches the hours on your payroll.

    Asks you
  • No impossible days

    No day over 24 hours; days over 16 hours get a second look.

    Flagged
  • Gross, deductions, net

    7A equals hours times rates plus cash fringe; 7B is at least 7A; total deductions and net pay tie out to your payroll to the cent.

    Second look
  • Fringe credit matches page 2

    Column 6B equals total hours times the plan credit listed in the Statement of Compliance.

    Second look
  • Apprentices registered

    Every RA line has a program name and its registration agency (OA or SAA). The apprentice to journeyworker ratio is shown on the summary.

    Asks you
  • Every classification is on the WD

    Each line maps to a rate row on your project's wage determination, or to a rate you entered with its source.

    Asks you
  • The right WD modification

    We warn when SAM.gov shows a newer modification than your contract (your contract's WD still governs).

    Warning
  • Pay periods split by week

    Bi-weekly and semi-monthly payrolls are split into workweeks by date; deductions are shared out by gross and noted in remarks.

    Noted
  • Unfunded plans

    Credit claimed for an unfunded plan gets a reminder that DOL approval is required first.

    Warning
  • Sanity checks

    Rates over $250 an hour, gross far off recent weeks, a name spelled differently, duplicate rows.

    Second look
  • Required fields

    Project name and location, WD number, week ending, your business and signer, worker IDs (last 4 only).

    Asks you

Underpayment is never shipped, and there is no override. If a worker is short on base rate or fringe, we tell you who, how much per hour, how many hours and the total owed. Pay the difference, upload the corrected payroll, and we finish the report.

Step 4

What lands in your inbox.

PDF package

Transmittal, WH-347, summary

A cover sheet with the project, week, payroll number, WD and checks passed; the official WH-347 (Rev. January 2025) pages 1 and 2; a deductions addendum when needed; and a review summary of every check.

California

DIR eCPR XML

For California public works, the eCPR file built to DIR's CPR schema version 1.3, ready to upload in your DIR account.

Timing

Within 8 working hours

Monday to Friday, 7am to 7pm Eastern. Most come back in minutes. Miss it on a report that was not waiting on you, and that report is free.

The signature and date on page 2 are left blank. We prepare reports for your review; you check them and sign. We never sign for you.

Questions

How it works, answered.

What does 'a specialist double-checks' mean?
If any value came from reading a PDF and you did not confirm it, or a number does not tie out, the report goes to a person on our team before it reaches you. You see the time it will be ready. You are never asked to sort out our doubts.
What do you do with my uploaded payroll file?
It is encrypted, used to build your report, and deleted after 30 days. Full Social Security numbers are cut to the last 4 digits when we read the file. More on the security page.
Can I fix something after I get the report?
Yes. Corrections are free and keep the same payroll number. The old version stays in your history.
Do you send it to my prime?
If you want. Save your prime's labor compliance email on the project and one click emails the PDF to them with you copied. Signing stays with you.

Make my first report free

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.