Davis-Bacon wage rates · California
San Diego County residential construction wage rates
Federal prevailing wage rates for residential construction in San Diego County, California, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- CA20260001
- Modification
- 3
- Published
- May 18, 2026
- Classifications
- 144
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See California prevailing wage for how the two fit together.
WD CA20260001, Mod 3
Make a WH-347 with these ratesScope as published: Building Construction Projects · Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) · Heavy Construction Projects (excludes water well drilling) · Highway Construction Projects · Residential Construction Projects (Consisting of single family homes and apartments up to and including 4 stories).
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AND TOXIC WASTE, ENCAPSULATION, ENCLOSURE AND DISPOS...ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AND TOXIC WASTE, ENCAPSULATION, ENCLOSURE AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND TOXIC WASTE BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING, FABRICATION OF TEMPORARY WOODEN BARRIERS AND ASSEMBLY OF DECONTAMINATION STATIONS | LABO0300-005 07/01/2025 | $46.48 | $25.93 | $72.41 |
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, ...ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | ASBE0005-004 07/04/2022 | $23.52 | $13.37 | $36.89 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | ASBE0005-002 09/01/2024 | $56.32 | $26.52 | $82.84 |
| BOILERMAKER | BOIL0092-003 01/01/2024 | $51.98 | $42.11 | $94.09 |
| BRICKLAYER; MARBLE SETTER | BRCA0004-008 11/01/2023 | $46.73 | $19.02 | $65.75 |
| CARPENTER: (1) BRIDGE | CARP0619-003 07/01/2025 | $52.37 | $26.18 | $78.55 |
| CARPENTER: (2) COMMERCIAL BUILDING | CARP0619-003 07/01/2025 | $48.94 | $26.18 | $75.12 |
| CARPENTER: (3) HEAVY & HIGHWAY | CARP0619-003 07/01/2025 | $51.40 | $16.28 | $67.68 |
| CARPENTER: (4) RESIDENTIAL CARPENTER | CARP0619-003 07/01/2025 | $39.15 | $26.18 | $65.33 |
| CARPENTER: (5) RESIDENTIAL INSULATION INSTALLER | CARP0619-003 07/01/2025 | $24.16 | $15.76 | $39.92 |
CEMENT MASON/CONCRETE FINISHER GROUP 1: Residential wood frame project of any size; work classified as Type III, IV or Type V construction; interior tenant improvement work regardless the size of the ...CEMENT MASON/CONCRETE FINISHER GROUP 1: Residential wood frame project of any size; work classified as Type III, IV or Type V construction; interior tenant improvement work regardless the size of the project; any wood frame project of four stories or less | PLAS0500-001 07/01/2018 | $26.34 | $19.77 | $46.11 |
| CEMENT MASON/CONCRETE FINISHER GROUP 2: Work classified as type I and II construction | PLAS0500-001 07/01/2018 | $27.99 | $19.77 | $47.76 |
| CEMENT MASON/CONCRETE FINISHER GROUP 3: ALL OTHER WORK | PLAS0500-001 07/01/2018 | $30.07 | $21.12 | $51.19 |
| DIVER: (1) WET AMOUNTS IN "RATES' COLUMN ARE PER DAY per day: amounts are shown as printed | CARP0619-004 07/01/2025 | $901.92 per day | $26.18 | see note |
| DIVER: (2) STANDBY AMOUNTS IN "RATES' COLUMN ARE PER DAY per day: amounts are shown as printed | CARP0619-004 07/01/2025 | $450.96 per day | $26.18 | see note |
| DIVER: (3) TENDER AMOUNTS IN "RATES' COLUMN ARE PER DAY per day: amounts are shown as printed | CARP0619-004 07/01/2025 | $442.96 per day | $26.18 | see note |
| DIVER: (4) ASSISTANT TENDER AMOUNTS IN "RATES' COLUMN ARE PER DAY per day: amounts are shown as printed | CARP0619-004 07/01/2025 | $418.96 per day | $26.18 | see note |
| DRYWALL FINISHER/TAPER (1) BUILDING & HEAVY CONSTRUCTION | PAIN0036-010 09/01/2024 | $43.59 | $24.80 | $68.39 |
| DRYWALL FINISHER/TAPER (2) Residential Construction (Wood frame apartments, single family homes and multi-duplexes up to and including four stories) | PAIN0036-010 09/01/2024 | $32.27 | $14.70 | $46.97 |
| DRYWALL: DRYWALL INSTALLER/LATHER ((1) WORK ON WOOD FRAMED CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS OR CONDOMINIUMS UNDER FOUR STORIES) | CARP0213-003 07/01/2021 | $32.14 | $16.28 | $48.42 |
| DRYWALL: DRYWALL INSTALLER/LATHER (2) ALL OTHER WORK | CARP0619-002 07/01/2025 | $44.53 | $27.09 | $71.62 |
| DRYWALL: DRYWALL STOCKER/SCRAPPER ((1) WORK ON WOOD FRAMED CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS OR CONDOMINIUMS UNDER FOUR STORIES) | CARP0213-003 07/01/2021 | $22.16 | $8.62 | $30.78 |
| DRYWALL: DRYWALL STOCKER/SCRAPPER (2) ALL OTHER WORK | CARP0619-002 07/01/2025 | $21.45 | $12.18 | $33.63 |
| ELECTRICIAN (RESIDENTIAL, 1-3 STORIES) | ELEC0569-008 06/01/2024 | $40.50 | $8.18 | $48.68 |
| ELECTRICIAN: (ALL OTHER WORK, INCLUDING 4 STORIES RESIDENTIAL) | ELEC0569-001 06/02/2025 | $58.95 | $18.85 | $77.80 |
| ELECTRICIAN: (ALL OTHER WORK, INCLUDING 4 STORIES RESIDENTIAL) CABLE SPLICER | ELEC0569-001 06/02/2025 | $59.70 | $18.87 | $78.57 |
| ELECTRICIAN: (TUNNEL WORK) | ELEC0569-001 06/02/2025 | $66.32 | $19.07 | $85.39 |
| ELECTRICIAN: (TUNNEL WORK) CABLE SPLICER | ELEC0569-001 06/02/2025 | $67.16 | $19.09 | $86.25 |
ELECTRICIAN: SOUND & COMMUNICATIONS SOUND TECHNICIAN SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEMS AS USED IN CLOSED CIRCUIT TELEVISION, AMPLIFIED ...ELECTRICIAN: SOUND & COMMUNICATIONS SOUND TECHNICIAN SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEMS AS USED IN CLOSED CIRCUIT TELEVISION, AMPLIFIED MASTER TELEVISION DISTRIBUTION, CATV ON PRIVATE PROPERTY, INTERCOMMUNICATION, BURGLAR ALARM, FIRE ALARM, LIFE SUPPORT AND ALL SECURITY ALARMS, PRIVATE AND PUBLIC TELEPHONE AND RELATED TELEPHONE INTERCONNECT, PUBLIC ADDRESS, PAGING, AUDIO, LANGUAGE, ELECTRONIC, BACKGROUND MUSIC SYSTEM LESS THAN LINE VOLTAGE OR ANY SYSTEM ACCEPTABLE FOR CLASS TWO WIRING FOR PRIVATE, COMMERCIAL, OR INDUSTRIAL USE FURNISHED BY LEASED WIRE, FREUENCY MODULATION OR OTHER RECORDING DEVICES, ELECTRICAL APPARATUS BY MEANS OF WHICH ELECTRICITY IS APPLIED TO THE AMPLIFICATION, TRANSMISSION, TRANSFERENCE, RECORDING OR REPRODUCTION OF VOICE, MUSIC, SOUND, IMPULSES AND VIDEO. EXCLUDED FROM THIS SCOPE OF WORK - TRANSMISSION, SERVICE AND MAINTENANCE OF BACKGROUND MUSIC. ALL OF THE ABOVE SHALL INCLUDE THE INSTALLATION AND TRANSMISSION OVER FIBER OPTICS | ELEC0569-004 06/03/2024 | $43.78 | $15.39 | $59.17 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0018-001 01/01/2025 | $69.43 | $38.44 | $107.87 |
| FIRE STOP TECHNICIAN (APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS) | ASBE0005-002 09/01/2024 | $39.94 | $20.65 | $60.59 |
| GLAZIER | PAIN0036-012 10/01/2024 | $52.90 | $22.16 | $75.06 |
IRONWORKER (FENCE PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, F...IRONWORKER (FENCE PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | IRON0229-001 01/01/2025 | $45.78 | $26.51 | $72.29 |
IRONWORKER (ORNAMENTAL, REINFORCING AND PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irw...IRONWORKER (ORNAMENTAL, REINFORCING AND PREMIUM PAY: $6.00 additional per hour at the following locations:China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | IRON0229-001 01/01/2025 | $50.70 | $35.15 | $85.85 |
LABORER (RESIDENTIAL CONSTRUCTION) (1) LABORER RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING (A) PROJECTS THAT EXCEED THR...LABORER (RESIDENTIAL CONSTRUCTION) (1) LABORER RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING (A) PROJECTS THAT EXCEED THREE STORIES OVER A GARAGE LEVEL, (B) ANY UTILITY WORK SUCH AS TELEPHONE, GAS, WATER, SEWER AND OTHER UTILITIES AND (C) ANY FINE GRADING WORK, UTILITY WORK OR PAVING WORK IN THE FUTURE STREET AND PUBLIC RIGHT-OF-WAY; BUT INCLUDING ALL ROUGH GRADING WORK AT THE JOB SITE BEHIND THE EXISTING RIGHT OF WAY | LABO0089-001 07/01/2025 | $42.15 | $23.42 | $65.57 |
LABORER (RESIDENTIAL CONSTRUCTION): (2) CLEANUP, LANDSCAPE, FENCING (CHAIN LINK & WOOD) RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS...LABORER (RESIDENTIAL CONSTRUCTION): (2) CLEANUP, LANDSCAPE, FENCING (CHAIN LINK & WOOD) RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING (A) PROJECTS THAT EXCEED THREE STORIES OVER A GARAGE LEVEL, (B) ANY UTILITY WORK SUCH AS TELEPHONE, GAS, WATER, SEWER AND OTHER UTILITIES AND (C) ANY FINE GRADING WORK, UTILITY WORK OR PAVING WORK IN THE FUTURE STREET AND PUBLIC RIGHT-OF-WAY; BUT INCLUDING ALL ROUGH GRADING WORK AT THE JOB SITE BEHIND THE EXISTING RIGHT OF WAY | LABO0089-001 07/01/2025 | $43.44 | $23.42 | $66.86 |
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGHT STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER; FLAGMAN; G...LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGHT STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER; FLAGMAN; GAS, OIL AND/OR WATER PIPELINE LABORER; GENERAL LABORER; GENERAL CLEAN-UP LABORER; LANDSCAPE LABORER; JETTING LABORER; TEMPORARY WATER AND AIR LINES LABORER; MATERIAL HOSEMAN (WALLS, SLABS, FLOORS AND DECKS); PLUGGING, FILLING OF SHEE-BOLT HOLES; DRY PACKING OF CONCRETE; RAILROAD MAINTENANCE, REPAIR TRACKMAN AND ROAD BEDS, STREETCAR AND RAILROAD CONSTRUCTION TRAC LABORERS; SLIP FORM RAISERS; SLURRY SEAL CREWS (MIXER OPERATOR, APPLICATOR OPERATOR, SQUEEGEE MAN, SHUTTLE MAN, TOP MAN), FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE; TARMAN AND MORTAR MAN; TOOL CRIB OR TOOL HOUSE LABORER; WINDOW CLEANER; WIRE MESH PULING-ALL CONCRETE POURING OPERATIONS | LABO0089-001 07/01/2025 | $45.54 | $25.09 | $70.63 |
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YARD OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUT...LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YARD OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE MAN, POURING CONCRETE, THE HANDLING OF THE CUTE FROM READY MIX TRUCKS, SUCH AS WALLS, SLABS, DECKS, FLOORS, FOUNDATIONS, FOOTINGS, CURBS, GUTTERS AND SIDEWALKS; CONCRETE CURER-IMPERVIOUS MEMBRANE AND FORM OILER; CUTTING TORCH OPERATOR (DEMOLITON); GUINEA CHASER; HEADBOARD MAN-ASPHLT; LABORER, PACKING ROD STEEL AND PANS; MEMBRANE VAPOR BARRIER INSTALLER; POWER BROOM SWEEPERS (SMALL); RIIPRAP, STONEPAVER, PLACING STONE OR WET SACKED CONCRETE; ROTO SCRAPER AND TILLER; TANK SEALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; UNDERGROUND LABORERS, INCLUDING CAISSON BELLOWER | LABO0089-001 07/01/2025 | $46.30 | $25.09 | $71.39 |
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 3 BUGGYMOBILE; CONCRETE CUTTING TORCH; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2 1/2 FEET DRILL STEEL OR LONG...LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 3 BUGGYMOBILE; CONCRETE CUTTING TORCH; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2 1/2 FEET DRILL STEEL OR LONGER; DRI PAK-IT MACHINE; HIGH SEALER (INCLUDING DRILLING OF SAME); HYDRO SEEDER AND SIMILAR TYPE; IMPACT WRENCH, MULT-PLATE; KETTLEMEN, POTMEN AND MEAN APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LINE CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING, BRUSHING OR HANDLING OF SUCH MATERIALS FOR PIPE WRAPPING AND WATERPROOFING); OPERATORS OF PNEUMATIC, GAS, ELECTRIC TOOLS, VIBRATRING MACHINES, PAVEMENT BREAKERS, AIR BLASTING, COME-ALONG, AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN; PIPELAYERS BACK UP MAN COATING, GROUTING, MAKING OF JOINTS, SEALING, CAULKING, DIAPERING AND INCLDUING RUBBER GASKET JOINTS, POINTING AND ANY AND ALL OTHER SERVICES; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCAARIFIER; STEEL HEADER BOARD MAN AND GUIDELINE SETTER; TAMPERS, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HANDPROPELLED | LABO0089-001 07/01/2025 | $47.16 | $25.09 | $72.25 |
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 4 ASPHALT RAKER, LUTERMAN, IRONER, APSHALT DUMPMAN AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILIN...LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 4 ASPHALT RAKER, LUTERMAN, IRONER, APSHALT DUMPMAN AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW MAN; CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETING AND TRENCH BRACING, HAND-GUIDED LAGGING HAMMER; LASER BEAM IN CONNECTION WITH LABORER'S WORK; OVERSIZE CONCRETE VIBRATOR OPERATOR 70 POUNDS AND OVER; PIPELAYER PERFORMING ALL SERVICES IN THE LAYING, INSTALLATION AND ALL FORMS OF CONNECTION OF PIPE FROM THE POINT OF RECEIVING PIPE IN THE DITCH UNTIL COMPLETION OF OEPRATION, INCLUDING ANY AND ALL FORMS OF TUBULAR MATERIAL, WHETHER PIPE, METALLIC OR NON-METALLIC, CONDUIT, AND ANY OTHER STATIONARY TYPE OF TUBULAR DEVICE USED FOR THE CONVEYING OF ANY SUBSTANCE OR ELEMENT, WHETHER WATER, SEWAGE, SOLID, GAS, AIR OR OTHER PRODUCT WHATSOEVER AND WITHOUT REGARD TO THE NATURE OF MATERIAL FROM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLEMAN), PORTA SHOT-BLAST, WATER BLASTING | LABO0089-001 07/01/2025 | $48.64 | $25.09 | $73.73 |
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 5 BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL PWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD ...LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 5 BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL PWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; DRILLER-ALL POWER DRILLS, EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER | LABO0089-001 07/01/2025 | $48.16 | $25.09 | $73.25 |
| LABORER, GUNITE: GROUP 1 RODMEN, NOZZLEMEN Footnote NOTE below | LABO0345-001 07/01/2025 | $55.88 | $23.77 | $79.65 |
| LABORER, GUNITE: GROUP 2 GUNMEN Footnote NOTE below | LABO0345-001 07/01/2025 | $54.93 | $23.77 | $78.70 |
| LABORER, GUNITE: GROUP 3 REBOUNDMEN Footnote NOTE below | LABO0345-001 07/01/2025 | $51.39 | $23.77 | $75.16 |
| LABORER: MASON TENDER | LABO0089-002 11/01/2025 | $42.60 | $22.13 | $64.73 |
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE CORP...LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB | LABO1414-003 08/06/2025 | $46.17 | $25.97 | $72.14 |
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE CORPS AIR STAT...LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB | LABO1414-003 08/06/2025 | $48.72 | $25.97 | $74.69 |
LABORERS: GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) LABORER: GENERAL OR CONSTRUCTION LABORER, LANDSCAPE LABORER. ASPHALT RUBBER MATERIAL LOADER. BORING MACHINE TENDER (OUTSIDE), CARPENTER LABORER (CLEA...LABORERS: GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) LABORER: GENERAL OR CONSTRUCTION LABORER, LANDSCAPE LABORER. ASPHALT RUBBER MATERIAL LOADER. BORING MACHINE TENDER (OUTSIDE), CARPENTER LABORER (CLEANING, HANDLING, OILING & BLOWING OF PANEL FORMS AND LUMBER), CONCRETE LABORER, CONCRETE SCREEDING FOR ROUGH STRIKE-OFF, CONCRETE WATER CURING. CONCRETE CURB & GUTTER LABORER, CERTIFIED CONFINED SPACE LABORER, DEMOLITION LABORER & CLEANING OF BRICK AND LUMBER,EXPANSION JOINT CAULKING; ENVIRONMENTAL REMEDIATION, MONITORING WELL, TOXIC WASTE AND GEOTECHNICAL DRILL TENDER, FINE GRADER, FIRE WATCHER, LIMBERS, BRUSH LOADER, PILERS AND DEBRIS HANDLERS. FLAGMAN. GAS OIL AND WATER PIPELINE LABORER. MATERIAL HOSEMAN (SLABS, WALLS, FLOORS, DECKS); PLUGGING, FILLING OF SHEE BOLT HOLES; DRY PACKING OF CONCRETE AND PATCHING; POST HOLER DIGGER (MANUAL); RAILROAD MAINTENANCE, REPAIR TRACKMAN, ROAD BEDS; RIGGING & SIGNALING; SCALER, SLIP-FORM RAISERS, FILLING CRACKS ON ANY SURFACE, TOOL CRIB OR TOOL HOUSE LABORER, TRAFFIC CONTROL (SIGNS, BARRIERS, BARRICADES, DELINEATOR, CONES ETC.), WINDOW CLEANER | LABO0089-004 07/01/2025 | $46.66 | $25.09 | $71.75 |
LABORERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT ABATEMENT; BUGGYMOBILE; CEMENT DUMPER (ON 1 YD. OR LARGER MIXERS AND HANDLING BULK CEMENT); CONCRETE CURER, IMPERVIOUS MEMBRANE AND FORM OILE...LABORERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT ABATEMENT; BUGGYMOBILE; CEMENT DUMPER (ON 1 YD. OR LARGER MIXERS AND HANDLING BULK CEMENT); CONCRETE CURER, IMPERVIOUS MEMBRANE AND FORM OILER; CHUTE MAN, POURING CONCRETE; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER/JACKHAMMER, WITH DRILL STEEL 2 1/'2 FEET OR LONGER; DRY PAK-IT MACHINE; FENCE ERECTOR; PIPELINE WRAPPER, GAS, OIL, WATER, POT TENDER & FORM MAN; GROUT MAN; INSTALLATION OF ALL ASPHALT OVERLAY FABRIC AND MATERIALS USED FOR REINFORCING ASPHALT; IRRIGATION LABORER; KETTLEMAN-POTMAN HOT MOP, INCLUDES APPLYING ASPHALT, LAY-KLOLD, CREOSOTE, LIME CAUSTIC AND SIMILAR TYHPES OF MATERIALS (DIPPING, BRUSHING, HANDLING) AND WATERPROOFING; MEMBRANE VAPOR BARRIER INSTALLER; PIPELAYER BACKUP MAN (COATING, GROUTING, MAKING OF JOINTS, SEALING CAULKIING, DIAPERING INCLUDING RUBBER BASKET JOINTS, POINTING); ROTARY SCARIFIER, MULTIPLE HEAD CONCRETE CHIPPER; ROCK SLINGER; ROTO SCRAPER & TILLER; SANDBLASTER POT TENDER; SEPTIC TANK DIGGER/INSTALLER; TAMPER/WACKER OPERATOR; TANK SCALER & CLEANER; TAR MAN & MORTAR MAN; TREE CLIMBER/FALLER, CHAINB SAW OPERATOR, PITTSBURGH CHIPPER & SIMILAR TYPE BRUSH SHREDDERS | LABO0089-004 07/01/2025 | $47.20 | $25.09 | $72.29 |
LABORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT, INSTALLATION OF ALL FRABRICS; BUGGY MOBILE MAN, BUSHING HAMMER; COMPACTOR (ALL TYPES), CONCRETE CURER - IMPERVIOUS MEMBRANE, FORM OILER, CON...LABORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT, INSTALLATION OF ALL FRABRICS; BUGGY MOBILE MAN, BUSHING HAMMER; COMPACTOR (ALL TYPES), CONCRETE CURER - IMPERVIOUS MEMBRANE, FORM OILER, CONCRETE CUTTING TORCH, CONCRETE PILE CUTTER,DRILLER/JACKHAMMER WITH DRILL STEEL 2 1/2 FT OR LONGER, DRY PAK-IT MACHINE, FENCE ERECTOR INCLUDING MANUAL POST HOLE DIGGING, GAS OIL OR WATER PIPELINE WRAPPER - 6 FT PIPE AND OVER, GURADRAIL ERECTOR, HYDRO SEEDER, IMPACT WRENCH MAN (MULTI PLATE), KETTLEMAN-POTMAN HOT MOP INCLUDES APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME CAUSTIC AND SIMILAR TYPES OF MATERIALS (DIPPING, BRUSHING OR HANDLING) AND WATERPROOFING. LASER BEAM IN CONNECTION WITH LABORER WORK. HIGH SCALER, OPERATORS OF PNEUMATIC GAS OR ELECTRIC TOOLS, VIBRATING MACHINES, PAVEMENT BREAKERS, AIR BLASTING, COME-ALONGS AND SIMILAR MECHANICAL TOOLS, REMOTE-CONTROLLED ROBOTIC TOOLS IN CONNECTION WITH LABORERS WORK. PIPELAYER BACKUP MAN (COATING, GROUTING,M MAKEING OF JOINTS, SEALING, CAULKING, DIAPERING INCLUDING RUBBER GASKET JOINTS, POINTING AND OTHER SERVICES). POWER POST HOLE DIGGER, ROTARY SCARIFIER (MULTIPLE HEAD CONCRETE CHIPPER SCARIFIER), ROCK SLINGER, SHOT BLAST EQUIPMENT (8 TO 48 INCHES), STEEL HEADERBOARD MAN AND GUIDELINE SETTER, TAMPER/WACKER OPERATOR AND SIMILAR TYPES, TRENCHING MACHINE HAND PROPELLED | LABO0089-004 07/01/2025 | $47.76 | $25.09 | $72.85 |
LABORERS: GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) ANY WORKER EXPOSED TO RAW SEWAGE. ASPHALT RAKER, LUTEMAN, ASPHALT DUMPMAN, ASPHALT SPREADER BOXES, CONCRETE CORE CUTTER, CONCRETE SAW MAN, CRIBBER, S...LABORERS: GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) ANY WORKER EXPOSED TO RAW SEWAGE. ASPHALT RAKER, LUTEMAN, ASPHALT DUMPMAN, ASPHALT SPREADER BOXES, CONCRETE CORE CUTTER, CONCRETE SAW MAN, CRIBBER, SHORER, HEAD ROCK SLINGER. INSTALLATION OF SUBSURFACE INSTRUMENTATION, MONITORING WELLS OR POINTS, REMEDIATION SYSTEM INSTALLER; LABORER, ASPHALT-RUBBER DISTRIBUTOR BOOTMAN; OVERSIZE CONCRETE VIBRATOR OPERATORS, 70 POUNDS OR OVER. PIPELAYER, PRFEFABRICATED MANHOLE INSTALLER, SANDBLAST NOZZLEMAN (WATER BALSTING-PORTA SHOT BLAST), TRAFFIC LANE CLOSURE | LABO0089-004 07/01/2025 | $49.28 | $25.09 | $74.37 |
LABORERS: GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH ...LABORERS: GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HORIZONTAL DIRECTIONAL DRILLER, BORING SYSTEM, ELECTRONIC TRAKING, DRILLER: ALL POWER DRILLS EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO FORM OF MOTIVE POWER. ENVIRONMENTAL REMEDIATION, MONITORING WELL, TOXIC WASTE AND GEOTECHNICAL DRILLER, TOXIC WASTE REMOVAL. WELDING IN CONNECTION WITH LABORER'S WORK | LABO0089-004 07/01/2025 | $50.14 | $25.09 | $75.23 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER | LABO1184-001 07/01/2025 | $47.94 | $20.86 | $68.80 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER | LABO1184-001 07/01/2025 | $48.11 | $20.86 | $68.97 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR | LABO1184-001 07/01/2025 | $49.96 | $20.86 | $70.82 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR | LABO1184-001 07/01/2025 | $51.96 | $20.86 | $72.82 |
LABORERS: STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND PLAYGROUNDS; CARSTOPS...LABORERS: STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND PLAYGROUNDS; CARSTOPS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; EQUIPMENT REPAIR TECHNICIAN | LABO1184-001 07/01/2025 | $49.30 | $23.97 | $73.27 |
LABORERS: STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDING, ETC.) AND PREPARA...LABORERS: STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDING, ETC.) AND PREPARATION OF SURFACE FOR COATINGS. TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT | LABO1184-001 07/01/2025 | $50.60 | $23.97 | $74.57 |
LABORERS: STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, GUIDE MARKERS, OTHER T...LABORERS: STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, GUIDE MARKERS, OTHER TRAFFIC DELINEATING DEVICES INCLUDING TRAFFIC CONTROL. THIS CATEGORY INCLUDES ALL TRAFFIC RELATED SURFACE PREPARATION (SANDBLASTING, WATERBLASTING, GRINDING) AS PART OF THE APPLICATION PROCESS. TRAFFIC PROTECTIVE DELINEATING SYSTEM INSTALLER: REMOVES, RELOCATES, INSTALLS, PERMANENTLY AFFIXED ROADSIDE AND PARKING DELINEATION BARRICADES, FENCING, CABLE ANCHOR, GUARD RAIL, REFERENCE SIGNS, MONUMENT MARKERS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; POWER BROOM SWEEPER | LABO1184-001 07/01/2025 | $52.61 | $23.97 | $76.58 |
LABORERS: STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION OF ...LABORERS: STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT | LABO1184-001 07/01/2025 | $54.35 | $23.97 | $78.32 |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER Footnote NOTE below | ELEC1245-001 01/01/2025 | $70.16 | $24.71 | $94.87 |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) Footnote NOTE below | ELEC1245-001 01/01/2025 | $53.30 | $22.26 | $75.56 |
| LINE CONSTRUCTION: (3) GROUNDMAN Footnote NOTE below | ELEC1245-001 01/01/2025 | $40.76 | $21.76 | $62.52 |
| LINE CONSTRUCTION: (4) POWDERMAN Footnote NOTE below | ELEC1245-001 01/01/2025 | $51.87 | $18.79 | $70.66 |
| MARBLE FINISHER | BRCA0018-004 06/01/2024 | $43.38 | $15.36 | $58.74 |
| MILLWRIGHT | CARP1607-004 07/01/2025 | $52.24 | $26.68 | $78.92 |
| MODULAR FURNITURE INSTALLER | CARP0721-001 07/01/2025 | $25.00 | $13.06 | $38.06 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; ELEVATOR OPERATOR-INSIDE; ENGINEER OILER; FORKLIFT OPERAT...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; ELEVATOR OPERATOR-INSIDE; ENGINEER OILER; FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES UNDER 5 TONS; GENERATOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $63.40 | $33.20 | $96.60 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 3000 OR 5000 AUGER OR SIMILAR TYPES-TEXOMA 900 AUGER...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 3000 OR 5000 AUGER OR SIMILAR TYPES-TEXOMA 900 AUGER OR SIMILAR TYPES-DRILLING DEPTH OF 105' MAXIMUM); DUAL DRUM MIXER, DYNAMIC COMPACTOR LDC350 (OR SIMILAR TYPES); MONORAIL LOCOMOTIVE OPERATOR (DIESEL, GAS OR ELECTRIC); MOTOR PATROL-BLADE OPERATOR (SINGLE ENGINE); MULTIPLE ENGINE TRACTOR OPERATOR (EUCLID AND SIMILAR TYPE-EXCEPT QUAD 9 CAT.); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, OVER 50 YDS. STRUCK); PNEUMATIC PIPE RAMMING TOOL AND SIMILAR TYPES; PRESTRESSED WRAPPING MACHINE OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER TIRED EARTH MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR OVER 25 YDS. AND UP TO 50 YDS. STRUCK), TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR (CRAWLER AND WHEEL TYPE OVER 6-1/2 YDS.); WOODS MIXER OPERATOR (AND SIMILAR PUGMILL EQUIPMENT) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.41 | $33.20 | $99.61 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD, AUGER 200 CA OR SIMILAR TYPES - WATS...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD, AUGER 200 CA OR SIMILAR TYPES - WATSON, AUGER 6000 OR SIMILAR TYPES - HUGHES SUPER DUTY, AUGER 200 OR SIMILAR TYPES - DRILLING DEPTH OF 175' MAXIMUM); HOE RAM OR SIMILAR WITH COMPRESSOR; MASS EXCAVATOR OPERATOR LESS THA 750 CU. YARDS; MECHANICAL FINISHING MACHINE OPERATOR; MOBILE FORM TRAVELER OPERATOR; MOTOR PATROL OPERATOR (MULTI-ENGINE); PIPE MOBILE MACHINE OPERATOR; RUBBER-TIRED EARTH- MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); RUBBER-TIRED SELF- LOADING SCRAPER OPERATOR (PADDLE-WHEEL-AUGER TYPE SELF-LOADING - TWO (2) OR MORE UNITS) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.58 | $33.20 | $99.78 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM ...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.68 | $33.20 | $99.88 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR (OPERATING A SECOND PIECE OF EQUIPMENT: $1.00 PER HOU...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR (OPERATING A SECOND PIECE OF EQUIPMENT: $1.00 PER HOUR ADDITIONAL); WHEEL EXCAVATOR OPERATOR (OVER 750 CU. YDS.) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.71 | $33.20 | $99.91 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILA...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE-UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.79 | $33.20 | $99.99 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MO...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.91 | $33.20 | $100.11 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 50 ...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 50 CU. YDS. STRUCK); TANDEM TRACTOR OPERATOR (OPERATING CRAWLER TYPE TRACTORS IN TANDEM - QUAD 9 AND SIMILAR TYPE) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.08 | $33.20 | $100.28 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.18 | $33.20 | $100.38 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMIL...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS.AND UP TO AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.29 | $33.20 | $100.49 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOR OPERATOR; FIREMAN; FORKLIF...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOR OPERATOR; FIREMAN; FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES OVER 5 TONS; HYDROSTATIC PUMP OPERATOR; OILER CRUSHER (ASPHALT OR CONCRETE PLANT); PETROMAT LAYDOWN MACHINE; PJU SIDE DUM JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPES); SKIPLOADER (WHEEL TYPE UP TO 3/4 YD. WITHOUT ATTACHMENT); TAR POT FIREMAN; TEMPORARY HEATING PLANT OPERATOR; TRENCHING MACHINE OILER PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $64.18 | $33.20 | $97.38 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 20- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 20- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS, AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.41 | $33.20 | $100.61 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.58 | $33.20 | $100.78 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRU...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.68 | $33.20 | $100.88 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.79 | $33.20 | $100.99 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIR...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.91 | $33.20 | $101.11 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); SPYDER EXCAVATOR OPERATOR, WITH ALL ATTACHMENTS PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $68.08 | $33.20 | $101.28 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD FERGUSON (WITH DRAGTYPE ATTACHMENTS); HELICOPTER ...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD FERGUSON (WITH DRAGTYPE ATTACHMENTS); HELICOPTER RADIOMAN (GROUND); STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $64.67 | $33.20 | $97.87 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR (MINI-MAX OR SIMILAR TYPE); BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONCRETE); CHIP SPREADIN...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR (MINI-MAX OR SIMILAR TYPE); BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONCRETE); CHIP SPREADING MACHINE OPERATOR; CONCRETE CLEANING DECONTAMINATION MACHINE OPERATOR; CONCRETE PUMP OPERATOR (SMALL PORTABLE);DIRECT PUSH OPERATOR (GEOPROBE OR SIMILAR TYPES) DRILLING MACHINE OPERATOR, SMALL AUGER TYPES (TEXOMA SUPER ECONOMATIC OR SIMILAR TYPES - HUGHES 100 OR 200 OR SIMILAR TYPES - DRILLING DEPTH OF 30' MAXIMUM); EQUIPMENT GREASER (GREASE TRUCK); GUARD RAIL POST DRIVER OPERATOR; HIGHLINE CABLEWAY SIGNALMAN; HYDRA-HAMMER-AERO STOMPER; MICRO TUNNELING (ABOVE GROUND TUNNEL); POWER CONCRETE CURING MACHINE OPERATOR; POWER CONCRETE SAW OPERATOR; POWER-DRIVEN JUMBO FORM SETTER OPERATOR; POWER SWEEPER OPERATOR; ROCK WHEEL SAW/TRENCHER; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR (ASPHALT OR CONCRETE); TRENCHING MACHINE OPERATOR (UP TO 6 FT.); VACUUM OR MUCH TRUCK PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $65.96 | $33.20 | $99.16 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRETE JOINT MACHINE OPERATOR (CANAL AND SIMILAR TYPE);...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRETE JOINT MACHINE OPERATOR (CANAL AND SIMILAR TYPE); CONCRETE PLANER OPERATOR; DANDY DIGGER; DECK ENGINE OPERATOR; DERRICKMAN (OILFIELD TYPE); DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 100 BUCKET OR SIMILAR TYPES - WATSON 1000 AUGER OR SIMILAR TYPES - TEXOMA 330, 500 OR 600 AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 45' MAXIMUM); DRILLING MACHINE OPERATOR; HYDROGRAPHIC SEEDER MACHINE OPERATOR (STRAW, PULP OR SEED), JACKSON TRACK MAINTAINER, OR SIMILAR TYPE; KALAMAZOO SWITCH TAMPER, OR SIMILAR TYPE; MACHINE TOOL OPERATOR; MAGINNIS INTERNAL FULL SLAB VIBRATOR, MECHANICAL BERM, CURB OR GUTTER(CONCRETE OR ASPHALT); MECHANICAL FINISHER OPERATOR (CONCRETE, CLARY-JOHNSON-BIDWELL OR SIMILAR); MICRO TUNNEL SYSTEM (BELOW GROUND); PAVEMENT BREAKER OPERATOR (TRUCK MOUNTED); ROAD OIL MIXING MACHINE OPERATOR; ROLLER OPERATOR (ASPHALT OR FINISH), RUBBER-TIRED EARTH MOVING EQUIPMENT (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; SKIPLOADER OPERATOR (CRAWLER AND WHEEL TYPE, OVER 3/4 YD. AND UP TO AND INCLUDING 1-1/2 YDS.); SLIP FORM PUMP OPERATOR (POWER DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS); TRACTOR OPERATOR-BULLDOZER, TAMPER-SCRAPER (SINGLE ENGINE, UP TO 100 H.P. FLYWHEEL AND SIMILAR TYPES, UP TO AND INCLUDING D-5 AND SIMILAR TYPES); TUGGER HOIST OPERATOR (1 DRUM); ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.18 | $33.20 | $99.38 |
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING OR FINISHING); ASPHALT PAVING MACHINE OPERATOR (BARBER GREENE OR SIMILAR TYPE); ASPHALT-RUBBER DISTR...OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING OR FINISHING); ASPHALT PAVING MACHINE OPERATOR (BARBER GREENE OR SIMILAR TYPE); ASPHALT-RUBBER DISTRIBUTION OPERATOR; BACKHOE OPERATOR (UP TO AND INCLUDING 3/4 YD.), SMALL FORD, CASE OR SIMILAR TYPES; CABLE BUNDLING MACHINE OPERATOR (EXCLUDING HANDHELD); CABLE TRENCHING MACHINE OPERATOR (SPIDER PLOW OR SIMILAR TYPES) CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR OPERATOR (GUNITE WORK); COMPACTOR OPERATOR (SELF-PROPELLED); CONCRETE MIXER OPERATOR (PAVING); CRUSHING PLANT OPERATOR; DRILL DOCTOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 150 BUCKET OR SIMILAR TYPES - WATSON 1500, 2000 2500 AUGER OR SIMILAR TYPES - TEXOMA 700, 800 AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 60' MAXIMUM); ELEVATING GRADER OPERATOR; GRADE CHECKER; GRADALL OPERATOR; GROUTING MACHINE OPERATOR; HEAVY-DUTY REPAIRMAN; HEAVY EQUIPMENT ROBOTICS OPERATOR; KALAMAZOO BALLISTE REGULATOR OR SIMILAR TYPE; KOLMAN BELT LOADER AND SIMILAR TYPE; LE TOURNEAU BLOB COMPACTOR OR SIMILAR TYPE; LOADER OPERATOR (ATHEY, EUCLID, SIERRA AND SIMILAR TYPES); MOBARK CHIPPER OR SIMILAR; OZZIE PADDER OR SIMILAR TYPES; P.C. SLOT SAW; PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (HACKLEY-PRESSWELL OR SIMILAR TYPE); PUMPCRETE GUN OPERATOR; RCM CEMENTING UNIT OPERATOR, RAIL/SWITCH GRINDER OPERATOR (HARSCO OR SIMILAR TYPES) ROCK DRILL OR SIMILAR TYPES; ROTARY DRILL OPERATOR (EXCLUDING CAISSON TYPE); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 YDS. UP TO AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (MULTIPLE ENGINE UP TO AND INCLUDING 25 YDS. STRUCK); RUBBER-TIRED SCRAPER OPERATOR (SELF-LOADING PADDLE WHEEL TYPE-JOHN DEERE, 1040 AND SIMILAR SINGLE UNIT); SELF- PROPELLED CURB AND GUTTER MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER OPERATOR (CRAWLER AND WHEEL TYPE OVER 1-1/2 YDS. UP TO AND INCLUDING 6-1/2 YDS.); SOIL REMEDIATION PLANT OPERATOR; SURFACE HEATERS AND PLANER OPERATOR; TRACTOR COMPRESSOR DRILL COMBINATION OPERATOR; TRACTOR OPERATOR (ANY TYPE LARGER THAN D-5 - 100 FLYWHEEL H.P. AND OVER, OR SIMILAR-BULLDOZER, TAMPER, SCRAPER AND PUSH TRACTOR SINGLE ENGINE); TRACTOR OPERATOR (BOOM ATTACHMENTS), TRAVELING PIPE WRAPPING, CLEANING AND BENDNG MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6 FT. DEPTH CAPACITY, MANUFACTURER'S RATING); TRENCHING MACHINE WITH ROAD MINER ATTACHMENT (OVER 6 FT DEPTH CAPACITY): ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM MECHANIC; WATER PULL (COMPACTION) OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.29 | $33.20 | $99.49 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator (includes loed, lull or similar types) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQ...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator (includes loed, lull or similar types) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. | ENGI0012-024 07/01/2025 | $64.75 | $33.20 | $97.95 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 to...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $67.75 | $33.20 | $100.95 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 ...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc); Tower crane operator and tower gantry PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $68.75 | $33.20 | $101.95 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $69.75 | $33.20 | $102.95 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13- Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick o...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13- Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) | ENGI0012-024 07/01/2025 | $70.75 | $33.20 | $103.95 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CH...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $65.53 | $33.20 | $98.73 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator (jobsite) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT O...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator (jobsite) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $65.82 | $33.20 | $99.02 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIP...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $65.96 | $33.20 | $99.16 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5- HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM) PREMIUM PAY: $10.00 PER HOUR SH...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5- HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.18 | $33.20 | $99.38 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6- Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machin...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6- Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.29 | $33.20 | $99.49 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7- PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST OPERA...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7- PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST OPERATOR (3 DRUM) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.41 | $33.20 | $99.61 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8- Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 t...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8- Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.58 | $33.20 | $99.78 |
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9- Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons ...OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9- Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | ENGI0012-024 07/01/2025 | $66.75 | $33.20 | $99.95 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader (wheel type up to 3/4 yd. without attachment) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the follown...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader (wheel type up to 3/4 yd. without attachment) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $65.25 | $33.20 | $98.45 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases:...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $66.03 | $33.20 | $99.23 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson (up to and including 10 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the f...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson (up to and including 10 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $66.32 | $33.20 | $99.52 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist opera...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $66.46 | $33.20 | $99.66 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-du...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $66.68 | $33.20 | $99.88 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval R...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $66.79 | $33.20 | $99.99 |
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: Chi...OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | ENGI0012-024 07/01/2025 | $66.91 | $33.20 | $100.11 |
| OPERATOR: POWER EQUIPMENT: (1) LEVERMAN (DREDGING) | ENGI0012-004 08/01/2025 | $67.90 | $40.95 | $108.85 |
| OPERATOR: POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING) | ENGI0012-004 08/01/2025 | $61.93 | $40.95 | $102.88 |
| OPERATOR: POWER EQUIPMENT: (3) DECKMATE (DREDGING) | ENGI0012-004 08/01/2025 | $61.82 | $40.95 | $102.77 |
| OPERATOR: POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON DREDGE) (DREDGING) | ENGI0012-004 08/01/2025 | $61.27 | $40.95 | $102.22 |
| OPERATOR: POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND (DREDGING) | ENGI0012-004 08/01/2025 | $60.73 | $40.95 | $101.68 |
| OPERATOR: POWER EQUIPMENT: (6) BARGE MATE (DREDGING) | ENGI0012-004 08/01/2025 | $61.34 | $40.95 | $102.29 |
| PAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK | PAIN0036-001 07/01/2023 | $38.52 | $18.64 | $57.16 |
| PILEDRIVERMAN | CARP0619-003 07/01/2025 | $52.37 | $26.18 | $78.55 |
| PLASTERER NORTH ISLAND NAVAL AIR STATION, COLORADO NAVAL AMPHIBIOUS BASE, IMPERIAL BEACH NAVAL AIR STATION: $3.00 ADDITIONAL PER HOUR | PLAS0200-005 08/03/2022 | $47.37 | $19.64 | $67.01 |
| PLUMBER (LANDSCAPE/IRRIGATION FITTER) | PLUM0345-001 09/01/2025 | $44.75 | $26.20 | $70.95 |
| PLUMBER (SEWER & STORM DRAIN WORK) | PLUM0345-001 09/01/2025 | $48.84 | $23.58 | $72.42 |
PLUMBER, PIPEFITTER, STEAMFITTER: ALL OTHER WORK EXCEPT WORK ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, STORES AND COMMERCIAL BUILDINGS NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE AND WORK ON...PLUMBER, PIPEFITTER, STEAMFITTER: ALL OTHER WORK EXCEPT WORK ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, STORES AND COMMERCIAL BUILDINGS NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE AND WORK ON STRIP MALLS, LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK | PLUM0016-006 09/01/2025 | $61.73 | $26.81 | $88.54 |
| PLUMBER, PIPEFITTER, STEAMFITTER: CAMP PENDLETON; VANDENBERG AIR FORCE BASE | PLUM0016-006 09/01/2025 | $66.23 | $26.81 | $93.04 |
| PLUMBER, PIPEFITTER, STEAMFITTER: WORK ONLY ON NEW ADDITIONS AND REMODELING OF COMMERCIAL BUILDINGS, BARS, RESTAURANTS, AND STORES NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE | PLUM0016-006 09/01/2025 | $59.85 | $25.83 | $85.68 |
| PLUMBER, PIPEFITTER, STEAMFITTER: WORK ONLY ON STRIP MALLS, LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK | PLUM0016-006 09/01/2025 | $44.29 | $24.16 | $68.45 |
| PLUMBER/PIPEFITTER (RESIDENTIAL) | PLUM0016-011 09/01/2025 | $48.83 | $22.73 | $71.56 |
| ROOFER | ROOF0045-001 07/01/2024 | $42.80 | $12.64 | $55.44 |
| SHEET METAL WORKER (CAMP PENDLETON) | SHEE0206-001 01/01/2025 | $53.45 | $30.92 | $84.37 |
| SHEET METAL WORKER (EXCEPT CAMP PENDLETON) | SHEE0206-001 01/01/2025 | $51.45 | $30.92 | $82.37 |
SHEET METAL WORKER (SHEET METAL TECHNICIAN) SHEET METAL TECHNICIAN - SCOPE: a. Existing residential buildings, both single and multi-family, where each unit is heated and/or cooled by a separate syste...SHEET METAL WORKER (SHEET METAL TECHNICIAN) SHEET METAL TECHNICIAN - SCOPE: a. Existing residential buildings, both single and multi-family, where each unit is heated and/or cooled by a separate system b. New single family residential buildings including tracts. c. New multi-family residential buildings, not exceeding five stories of living space in height, provided each unit is heated or cooled by a separate system. Hotels and motels are excluded. d. LIGHT COMMERCIAL WORK: Any sheet metal, heating and air conditioning work performed on a project where the total construction cost, excluding land, is under $1,000,000 e. TENANT IMPROVEMENT WORK: Any work necessary to finish interior spaces to conform to the occupants of commercial buildings, after completion of the building shell | SHEE0206-001 01/01/2025 | $38.65 | $10.31 | $48.96 |
| SOFT FLOOR LAYER | PAIN0036-019 01/01/2025 | $40.77 | $19.37 | $60.14 |
SOUND & COMMUNICATIONS: SOUND TECHNICIAN TERMINATING, OPERATING AND PERFORMING FINAL CHECK-OUT SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEMS AS USE...SOUND & COMMUNICATIONS: SOUND TECHNICIAN TERMINATING, OPERATING AND PERFORMING FINAL CHECK-OUT SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF COMPONENTS OR SYSTEMS AS USED IN CLOSED CIRCUIT TELEVISION, AMPLIFIED MASTER TELEVISION DISTRIBUTION, CATV ON PRIVATE PROPERTY, INTERCOMMUNICATION, BURGLAR ALARM, FIRE ALARM, LIFE SUPPORT AND ALL SECURITY ALARMS, PRIVATE AND PUBLIC TELEPHONE AND RELATED TELEPHONE INTERCONNECT, PUBLIC ADDRESS, PAGING, AUDIO, LANGUAGE, ELECTRONIC, BACKGROUND MUSIC SYSTEM LESS THAN LINE VOLTAGE OR ANY SYSTEM ACCEPTABLE FOR CLASS TWO WIRING FOR PRIVATE, COMMERCIAL, OR INDUSTRIAL USE FURNISHED BY LEASED WIRE, FREUENCY MODULATION OR OTHER RECORDING DEVICES, ELECTRICAL APPARATUS BY MEANS OF WHICH ELECTRICITY IS APPLIED TO THE AMPLIFICATION, TRANSMISSION, TRANSFERENCE, RECORDING OR REPRODUCTION OF VOICE, MUSIC, SOUND, IMPULSES AND VIDEO. EXCLUDED FROM THIS SCOPE OF WORK - TRANSMISSION, SERVICE AND MAINTENANCE OF BACKGROUND MUSIC. ALL OF THE ABOVE SHALL INCLUDE THE INSTALLATION AND TRANSMISSION OVER FIBER OPTICS | ELEC0569-005 06/03/2024 | $43.78 | $15.39 | $59.17 |
| SPRINKLER FITTER | SFCA0669-001 01/01/2026 | $52.53 | $28.19 | $80.72 |
| TERRAZZO FINISHER | BRCA0018-010 09/01/2024 | $42.11 | $14.67 | $56.78 |
| TERRAZZO WORKER/SETTER | BRCA0018-010 09/01/2024 | $49.62 | $15.26 | $64.88 |
| TILE FINISHER | BRCA0018-004 06/01/2024 | $37.96 | $13.77 | $51.73 |
| TILE LAYER | BRCA0018-004 06/01/2024 | $51.82 | $19.32 | $71.14 |
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #1 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS STREET LIGH...TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #1 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS STREET LIGHT & TRAFFIC SIGNAL WORK: UTILITY TECHNICIAN #1: INSTALLATION OF STREET LIGHTS AND TRAFFIC SIGNALS, INCLUDING ELECTRICAL CIRCUITRY, PROGRAMMABLE CONTROLLER, PEDESTAL-MOUNTED ELECTRICAL METER ENCLOSURES AND LAYING OF PRE-ASSEMBLED CABLE IN DUCTS. THE LAYOUT OF ELECTRICAL SYSTEMS AND COMMUNICATION INSTALLATION INCLUDING PROPER POSITION OF TRENCH DEPTHS, AND RADIUS AT DUCT BANKS, LOCATION FOR MANHOLES, STREET LIGHTS AND TRAFFIC SIGNALS | ELEC0569-006 06/02/2025 | $43.62 | $14.41 | $58.03 |
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #2 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS STREET LIGH...TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #2 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS STREET LIGHT & TRAFFIC SIGNAL WORK: UTILITY TECHNICIAN #2: DISTRIBUTION OF MATERIAL AT JOBSITE, INSTALLATION OF UNDERGROUND DUCTS FOR ELECTRICAL, TELEPHONE, CABLE TV LAND COMMUNICATION SYSTEMS. THE SETTING, LEVELING, GROUNDING AND RACKING OF PRECAST MANHOLES, HANDHOLES AND TRANSFORMER PADS | ELEC0569-006 06/02/2025 | $33.10 | $14.09 | $47.19 |
| TRUCK DRIVERS: GROUP 1 FUEL MAN, SWAMPER Footnote NOTE below | TEAM0166-001 07/01/2025 | $32.12 | $27.07 | $59.19 |
| TRUCK DRIVERS: GROUP 2- 2-AXLE DUMP TRUCK, 2-AXLE FLAT BED,CONCRETE PUMPING TRUCK, INDUSTRIAL LIFT TRUCK, MOTORIZED TRAFFIC CONTROL, PICKUP TRUCK ON JOBSITE Footnote NOTE below | TEAM0166-001 07/01/2025 | $42.71 | $27.07 | $69.78 |
TRUCK DRIVERS: GROUP 3- 2-AXLE WATER TRUCK, 3-AXLE DUMP TRUCK, 3-AXLE FLAT BED, EROSION CONTROL NOZZLEMAN, DUMP CRETE TRUCK UNDER 6.5 YD, FORKLIFT 15,000 LBS AND OVER, PRELL TRUCK, PIPELINE WORK TRUCK...TRUCK DRIVERS: GROUP 3- 2-AXLE WATER TRUCK, 3-AXLE DUMP TRUCK, 3-AXLE FLAT BED, EROSION CONTROL NOZZLEMAN, DUMP CRETE TRUCK UNDER 6.5 YD, FORKLIFT 15,000 LBS AND OVER, PRELL TRUCK, PIPELINE WORK TRUCK DRIVER, ROAD OIL SPREADER, CEMENT DISTRIBUTOR OR SLURRY DRIVER, BOOTMAN, ROSS CARRIER | TEAM0166-001 07/01/2025 | $42.91 | $27.07 | $69.98 |
TRUCK DRIVERS: GROUP 4 OFF-ROAD DUMP TRUCK UNDER 35 TONS 4-AXLES BUT LESS THAN 7-AXLES, LOW-BED TRUCK & TRAILER, TRANSIT MIX TRUCKS UNDER 8 YD, 3-AXLE WATER TRUCK, EROSION CONTROL DRIVER, GROUT MIXER ...TRUCK DRIVERS: GROUP 4 OFF-ROAD DUMP TRUCK UNDER 35 TONS 4-AXLES BUT LESS THAN 7-AXLES, LOW-BED TRUCK & TRAILER, TRANSIT MIX TRUCKS UNDER 8 YD, 3-AXLE WATER TRUCK, EROSION CONTROL DRIVER, GROUT MIXER TRUCK, DUMP CRETE 6.5YD AND OVER, DUMPSTER TRUCKS, DW 10, DW 20 AND OVER, FUEL TRUCK AND DYNAMITE, TRUCK GREASER, TRUCK MOUNTED MOBILE SWEEPER 2-AXLE WINCH TRUCK | TEAM0166-001 07/01/2025 | $43.11 | $27.07 | $70.18 |
| TRUCK DRIVERS: GROUP 5 OFF-ROAD DUMP TRUCK 35 TONS AND OVER, 7-AXLES OR MORE, TRANSIT MIX TRUCKS 8 YD AND OVER, A-FRAME TRUCK, SWEDISH CRANES Footnote NOTE below | TEAM0166-001 07/01/2025 | $43.31 | $27.07 | $70.38 |
| TRUCK DRIVERS: GROUP 6 OFF-ROAD SPECIAL EQUIPMENT (INCLUDING BUT NOT LIMITED TO WATER PULL TANKERS, ATHEY WAGONS, DJB, B70 WUCLIDS OR LIKE EQUIPMENT) Footnote NOTE below | TEAM0166-001 07/01/2025 | $43.80 | $27.07 | $70.87 |
| TRUCK DRIVERS: GROUP 7 REPAIRMAN Footnote NOTE below | TEAM0166-001 07/01/2025 | $45.31 | $27.07 | $72.38 |
Footnotes in CA20260001 (5)
- ELEC1245-001 NOTE: HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY
- ELEV0018-001 A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.
- ELEV0018-001 B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY
- LABO0345-001 NOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON A PORTAL-TO-PORTAL BASIS. ANY WORK PERFORMED ON, IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH STRUCTURE IS IN EXCESS OF 75'-0" ABOVE BASE LEVEL AND WHICH WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 75'-0" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE THE 75'-0" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE
- TEAM0166-001 NOTE: HAZMAT PAY: WORK ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED, SHALL BE PAID, IN ADDITION TO THE CLASSIFICATION WORKING IN, AS FOLLOWS: LEVELS A, B AND C - +$1.00 PER HOUR. WORKERS SHALL BE PAID HAZMAT PAY IN INCREMENTS OF FOUR (4) AND EIGHT (8) HOURS
Questions about these rates
What is the Davis-Bacon rate for electricians on residential work in San Diego County?
What is the Davis-Bacon rate for plumbers on residential work in San Diego County?
What is the Davis-Bacon rate for carpenters on residential work in San Diego County?
Which wage determination applies to my project?
What counts as residential construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with CA20260001
Other counties: all California counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.