Davis-Bacon wage rates · Illinois
Boone County residential construction wage rates
Federal prevailing wage rates for residential construction in Boone County, Illinois, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- IL20260053
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 20
2 wage determinations cover residential work in Boone County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Illinois prevailing wage for how the two fit together.
1 of 2: WD IL20260053, Mod 1
Make a WH-347 with these ratesScope as published: RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| CARPENTER (INCLUDING SOFT FLOOR LAYER AND BATT/BLOWN INSULATION) | CARP0792-004 07/01/2025 | $37.19 | $26.60 | $63.79 |
| CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY) | PLAS0011-015 06/01/2023 | $41.03 | $36.39 | $77.42 |
| ELECTRICIAN (BOONE COUNTY) | ELEC0364-008 06/01/2025 | $30.61 | $28.17 | $58.78 |
| LABORER: COMMON, LANDSCAPE (BOONE COUNTY) | LABO0149-004 06/01/2018 | $42.72 | $28.19 | $70.91 |
| LABORERS: PLANTSMAN | SUIL1996-001 03/17/1994 | $9.00 | $0.00 | $9.00 |
OPERATOR: POWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND ...OPERATOR: POWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; FRONT ENDLOADER 2 1/4 YD. AND OVER; HYDRAULIC BACKHOES*; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES- SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | ENGI0150-027 06/01/2025 | $56.75 | $51.05 | $107.80 |
OPERATOR: POWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 P...OPERATOR: POWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); *-REQUIRES OILER PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | ENGI0150-027 06/01/2025 | $56.05 | $51.05 | $107.10 |
OPERATOR: POWER EQUIPMENT: GROUP 3 PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50...OPERATOR: POWER EQUIPMENT: GROUP 3 PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | ENGI0150-027 06/01/2025 | $53.60 | $51.05 | $104.65 |
OPERATOR: POWER EQUIPMENT: GROUP 4 OILERS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTR...OPERATOR: POWER EQUIPMENT: GROUP 4 OILERS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | ENGI0150-027 06/01/2025 | $51.60 | $51.05 | $102.65 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | PAIN0030-004 06/01/2024 | $45.15 | $29.41 | $74.56 |
| PLASTERER (BOONE COUNTY) | PLAS0011-015 06/01/2023 | $37.90 | $37.66 | $75.56 |
| PLUMBER | PLUM0023-002 06/01/2025 | $55.54 | $31.43 | $86.97 |
| ROOFER | ROOF0011-006 12/01/2024 | $50.25 | $30.43 | $80.68 |
| SHEET METAL WORKER (INCLUNDING HVAC) | SHEE0219-002 06/01/2024 | $39.47 | $31.55 | $71.02 |
| TERRAZZO WORKER/SETTER | BRIL0021-013 06/01/2017 | $44.38 | $25.84 | $70.22 |
| TILE SETTER | BRIL0021-013 06/01/2017 | $45.49 | $25.72 | $71.21 |
| TRUCK DRIVER: 2 - 3 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.47 | $26.70 | $75.17 |
| TRUCK DRIVER: 4 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.62 | $26.70 | $75.32 |
| TRUCK DRIVER: 5 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.82 | $26.70 | $75.52 |
| TRUCK DRIVER: 6 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.93 | $26.70 | $75.63 |
Footnotes in IL20260053 (1)
- TEAM0325-004 NOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
2 of 2: WD IL20260020, Mod 2
Make a WH-347 with these ratesScope as published: Landscaping work on Building, Residential, Heavy and Highway Construction Projects
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER 2 & 3 AXLES. (GRUNDY, LAKE & WILL COUNTIES) | SUIL1993-001 01/19/1993 | $11.86 | $2.81 | $14.67 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | SUIL1993-002 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DE KALB COUNTY) | SUIL1993-001 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DU PAGE COUNTY) | SUIL1993-001 01/19/1993 | $7.25 | none printed | see note |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS. (COOK COUNTY) | SUIL1993-001 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) | SUIL1993-001 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (COOK COUNTY) | SUIL1993-002 01/19/1993 | $9.80 | $1.82 | $11.62 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) | SUIL1993-001 01/19/1993 | $9.66 | $0.26 | $9.92 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DU PAGE COUNTY) | SUIL1993-002 01/19/1993 | $9.04 | $1.16 | $10.20 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (GRUNDY, LAKE & WILL COUNTIES) | SUIL1993-001 01/19/1993 | $12.00 | $3.32 | $15.32 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) | SUIL1993-002 01/19/1993 | $11.94 | $2.42 | $14.36 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (COOK COUNTY) | SUIL1993-002 01/19/1993 | $9.93 | $1.89 | $11.82 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (DU PAGE COUNTY) | SUIL1993-002 01/19/1993 | $8.32 | $1.02 | $9.34 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) | SUIL1993-002 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (COOK COUNTY) | SUIL1993-001 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DE KALB COUNTY) | SUIL1993-001 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DU PAGE COUNTY) | SUIL1993-002 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) | SUIL1993-002 01/19/1993 | $13.11 | $3.01 | $16.12 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (COOK COUNTY) | SUIL1993-002 01/19/1993 | $10.98 | $2.12 | $13.10 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) | SUIL1993-002 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DU PAGE COUNTY) | SUIL1993-001 01/19/1993 | $10.75 | $0.00 | $10.75 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) | SUIL1993-001 01/19/1993 | $9.73 | $2.05 | $11.78 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (COOK COUNTY) | SUIL1993-003 01/19/1993 | $10.08 | $2.06 | $12.14 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) | SUIL1993-002 01/19/1993 | $9.66 | $0.26 | $9.92 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DU PAGE COUNTY) | SUIL1993-003 01/19/1993 | $10.65 | $0.00 | $10.65 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER (KANKAKEE COUNTY) | SUIL1993-002 01/19/1993 | $8.75 | $0.17 | $8.92 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORER (DE KALB COUNTY) | SUIL1993-002 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATOR (KANKAKEE COUNTY) | SUIL1993-003 01/19/1993 | $16.57 | $3.56 | $20.13 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) | SUIL1993-002 01/19/1993 | $7.25 | $0.00 | $7.25 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) | SUIL1993-001 01/19/1993 | $9.66 | $0.26 | $9.92 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- TRUCK DRIVERS, 2 & 3 AXLES (PEORIA, TAZEWELL, & WOODFORD COUNTIES) | SUIL1993-003 01/19/1993 | $17.58 | $5.88 | $23.46 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (MCLEAN COUNTY) | LABO0362-003 05/01/2018 | $31.08 | $24.43 | $55.51 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | LABO0996-004 05/01/2018 | $32.73 | $23.74 | $56.47 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (ROCK ISLAND COUNTY) | LABO0309-006 01/01/2024 | $33.77 | $23.60 | $57.37 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (WINNEBAGO COUNTY) | LABO0032-004 05/01/2025 | $47.04 | $36.31 | $83.35 |
| LANDSCAPE LABORER-HIGHWAY CONSTRUCTION (HENRY COUNTY) | LABO0538-011 05/01/2024 | $35.23 | $28.10 | $63.33 |
| LANDSCAPE LABORER-HIGHWAY CONSTRUCTION (KANKAKEE COUNTY) | LABO0751-004 05/01/2021 | $39.44 | $32.54 | $71.98 |
OPERATORS- BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MA...OPERATORS- BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. INCLUDES ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | ENGI0150-013 06/01/2024 | $37.55 | $9.50 | $47.05 |
OPERATORS- HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR ECLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND TH...OPERATORS- HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR ECLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. INCLUDES THE FOLLOWING: ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES) | ENGI0150-023 06/01/2024 | $37.55 | $9.50 | $47.05 |
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (HENRY AND ROCK ISLAND COUNTIES) | TEAM0371-004 05/01/2025 | $45.35 | $25.72 | $71.07 |
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | TEAM0026-005 05/01/2025 | $45.29 | $25.42 | $70.71 |
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | TEAM0722-005 05/01/2025 | $45.29 | $25.42 | $70.71 |
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | TEAM0627-004 05/01/2024 | $43.24 | $24.27 | $67.51 |
TRUCK DRIVER, GROUP 2 - 2 OR 3 AXLES HAULING LESS THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PUR...TRUCK DRIVER, GROUP 2 - 2 OR 3 AXLES HAULING LESS THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | TEAM0026-005 05/01/2025 | $45.88 | $25.42 | $71.30 |
TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURP...TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (HENRY AND ROCK ISLAND COUNTIES) | TEAM0371-004 05/01/2025 | $45.93 | $25.72 | $71.65 |
TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURP...TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | TEAM0627-004 05/01/2024 | $43.83 | $24.27 | $68.10 |
TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYUDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PUR...TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYUDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | TEAM0722-005 05/01/2025 | $45.88 | $25.42 | $71.30 |
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTCULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (MCLEAN (SOUTH OF...TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTCULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | TEAM0026-005 05/01/2025 | $46.15 | $25.42 | $71.57 |
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (PEORIA, TAZEWEL...TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | TEAM0627-004 05/01/2024 | $44.10 | $24.27 | $68.37 |
| TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (HENRY AND ROCK ISLAND COUNTIES) | TEAM0371-004 05/01/2025 | $46.25 | $25.72 | $71.97 |
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (OGLE (NORTH OF ...TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | TEAM0722-005 05/01/2025 | $46.15 | $25.42 | $71.57 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (HENRY AND ROCK ISLAND COUNTIES) | TEAM0371-004 05/01/2025 | $46.60 | $25.72 | $72.32 |
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF...TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | TEAM0026-005 05/01/2025 | $46.54 | $25.42 | $71.96 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | TEAM0722-005 05/01/2025 | $46.54 | $25.42 | $71.96 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | TEAM0627-004 05/01/2024 | $44.49 | $24.27 | $68.76 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) | TEAM0371-004 05/01/2025 | $47.71 | $25.72 | $73.43 |
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE...TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | TEAM0026-005 05/01/2025 | $47.64 | $25.42 | $73.06 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | TEAM0722-005 05/01/2025 | $47.64 | $25.42 | $73.06 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | TEAM0627-004 05/01/2024 | $45.59 | $24.27 | $69.86 |
| TRUCK DRIVER: 2 - 3 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.47 | $26.70 | $75.17 |
| TRUCK DRIVER: 2 & 3 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below | TEAM0786-001 06/01/2025 | $53.95 | $0.30 | $54.25 |
| TRUCK DRIVER: 2 OR 3 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below | TEAM0731-001 06/01/2025 | $45.55 | $30.27 | $75.82 |
| TRUCK DRIVER: 2 OR 3 AXLES (KANKAKEE COUNTY) Footnote A below | TEAM0179-008 06/01/2024 | $44.82 | $0.25 | $45.07 |
| TRUCK DRIVER: 2-3 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below | TEAM0330-004 06/01/2025 | $44.83 | $0.30 | see note |
| TRUCK DRIVER: 2-3 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below | TEAM0673-003 06/01/2025 | $45.31 | $0.30 | $45.61 |
TRUCK DRIVER: 2-3 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST C...TRUCK DRIVER: 2-3 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | TEAM0179-004 06/01/2025 | $46.12 | $0.30 | see note |
| TRUCK DRIVER: 2-3 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below | TEAM0301-001 06/01/2024 | $44.54 | $13.40 | $57.94 |
| TRUCK DRIVER: 4 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.62 | $26.70 | $75.32 |
| TRUCK DRIVER: 4 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below | TEAM0330-004 06/01/2025 | $44.98 | $0.30 | see note |
| TRUCK DRIVER: 4 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below | TEAM0673-003 06/01/2025 | $45.46 | $0.30 | $45.76 |
TRUCK DRIVER: 4 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST COR...TRUCK DRIVER: 4 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | TEAM0179-004 06/01/2025 | $46.27 | $0.30 | see note |
| TRUCK DRIVER: 4 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below | TEAM0731-001 06/01/2025 | $45.80 | $30.27 | $76.07 |
| TRUCK DRIVER: 4 AXLES (KANKAKEE COUNTY) Footnote A below | TEAM0179-008 06/01/2024 | $44.97 | $0.25 | $45.22 |
| TRUCK DRIVER: 4 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below | TEAM0301-001 06/01/2024 | $44.69 | $13.40 | $58.09 |
| TRUCK DRIVER: 4 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below | TEAM0786-001 06/01/2025 | $54.21 | $0.30 | $54.51 |
| TRUCK DRIVER: 5 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.82 | $26.70 | $75.52 |
| TRUCK DRIVER: 5 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below | TEAM0330-004 06/01/2025 | $45.18 | $0.30 | see note |
| TRUCK DRIVER: 5 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below | TEAM0673-003 06/01/2025 | $45.66 | $0.30 | $45.96 |
TRUCK DRIVER: 5 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST COR...TRUCK DRIVER: 5 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | TEAM0179-004 06/01/2025 | $46.47 | $0.30 | see note |
| TRUCK DRIVER: 5 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below | TEAM0731-001 06/01/2025 | $46.00 | $30.27 | $76.27 |
| TRUCK DRIVER: 5 AXLES (KANKAKEE COUNTY) Footnote A below | TEAM0179-008 06/01/2024 | $45.17 | $0.25 | $45.42 |
| TRUCK DRIVER: 5 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below | TEAM0301-001 06/01/2024 | $44.89 | $13.40 | $58.29 |
| TRUCK DRIVER: 5 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below | TEAM0786-001 06/01/2025 | $54.43 | $0.30 | $54.73 |
| TRUCK DRIVER: 6 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below | TEAM0325-004 06/01/2025 | $48.93 | $26.70 | $75.63 |
| TRUCK DRIVER: 6 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below | TEAM0330-004 06/01/2025 | $45.38 | $0.30 | see note |
| TRUCK DRIVER: 6 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below | TEAM0673-003 06/01/2025 | $45.86 | $0.30 | $46.16 |
TRUCK DRIVER: 6 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST COR...TRUCK DRIVER: 6 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | TEAM0179-004 06/01/2025 | $46.67 | $0.30 | see note |
| TRUCK DRIVER: 6 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below | TEAM0731-001 06/01/2025 | $46.20 | $30.27 | $76.47 |
| TRUCK DRIVER: 6 AXLES (KANKAKEE COUNTY) Footnote A below | TEAM0179-008 06/01/2024 | $45.37 | $0.25 | $45.62 |
| TRUCK DRIVER: 6 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below | TEAM0301-001 06/01/2024 | $45.09 | $13.40 | $58.49 |
| TRUCK DRIVER: 6 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below | TEAM0786-001 06/01/2025 | $54.64 | $0.30 | $54.94 |
Footnotes in IL20260020 (17)
- ENGI0150-013 A: HEALTH AND WELFARE CONTRIBUTION IS $1,780.00 PER MONTH.
- ENGI0150-013 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY.
- ENGI0150-023 A: HEALTH AND WELFARE CONTRIBUTION IS $1,780.00 PER MONTH.
- ENGI0150-023 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY.
- TEAM0179-004 A: HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK
- TEAM0179-004 B: LOWBOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
- TEAM0179-008 A: $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
- TEAM0301-001 A: $500.00 PER WEEK PENSION.
- TEAM0301-001 B: LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
- TEAM0325-004 NOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
- TEAM0330-004 A: HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK. LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
- TEAM0673-003 A: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK. PENSON: $589.90 PER WEEK. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
- TEAM0731-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.
- TEAM0731-001 B: 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
- TEAM0731-001 C: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $448.80 PER WEEK. PENSION: $562.80 PER WEEK.
- TEAM0786-001 A: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK. PENSION: $408 PER WEEK.
- TEAM0786-001 B: 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.
Questions about these rates
What is the Davis-Bacon rate for electricians on residential work in Boone County?
What is the Davis-Bacon rate for plumbers on residential work in Boone County?
What is the Davis-Bacon rate for carpenters on residential work in Boone County?
Which wage determination applies to my project?
What counts as residential construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with IL20260053
Other counties: all Illinois counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.