Davis-Bacon wage rates · Illinois

Calhoun County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Calhoun County, Illinois, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20263 wage determinations
Wage determination
IL20260017
Modification
5
Published
July 30, 2026
Classifications
147
Other types here
Building, Residential, Highway

3 wage determinations cover heavy work in Calhoun County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Illinois prevailing wage for how the two fit together.

1 of 3: WD IL20260017, Mod 5

Make a WH-347 with these rates
Published July 30, 2026 147 classifications Covers 11 counties Types: Heavy, Highway Source: SAM.gov

Scope as published: Heavy Construction · Highway Construction

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in IL20260017 Mod 5, published 07/30/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER (BOND, CALHOUN, AND JERSEY COUNTIES) CARP0664-006
05/01/2021
$41.36 $18.90 $60.26
CARPENTER (GREENE COUNTY) CARP0270-023
05/15/2020
$35.05 $28.57 $63.62
CARPENTER & PILEDRIVERMEN (CLINTON, MONROE, AND WASHINGTON COUNTIES) CARP0500-001
05/01/2021
$41.36 $18.90 $60.26
CARPENTER AND PILEDRIVER (MADISON COUNTY) CARP0664-003
05/01/2021
$41.36 $18.90 $60.26
CARPENTER AND PILEDRIVER (ST. CLAIR COUNTY) CARP0500-003
05/01/2021
$41.36 $18.90 $60.26
CARPENTER:MACOUPIN and MONTGOMERY COUNTIES CARP0270-015
05/01/2017
$32.15 $25.97 $58.12
CEMENT MASON/CONCRETE FINISHER (BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, AND ST. CLAIR COUNTIES) PLAS0090-001
08/01/2024
$39.00 $30.60 $69.60
CEMENT MASON/CONCRETE FINISHER (CLINTON COUNTY) PLAS0090-005
08/01/2024
$39.00 $30.60 $69.60
CEMENT MASON/CONCRETE FINISHER (WASHINGTON COUNTY) PLAS0143-007
04/01/2016
$36.43 $20.87 $57.30
ELECTRICIAN (BOND (EASTERN HALF), CLINTON (HUEY, HOFFMAN, & VICINITY), AND WASHINGTON (EXCEPT VENEDY TWP) COUNTIES) ELEC0702-017
01/01/2025
$52.14 $29.14 $81.28
ELECTRICIAN (BOND (WESTERN HALF), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HART...ELECTRICIAN (BOND (WESTERN HALF), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HARTFORD & WOOD RIVER), MONROE, MONTGOMERY (WEST OF BUTLER GROVE, GRISHAM, HILLSBOROUGH & RAYMOND TWPS), ST. CLAIR AND WASHINGTON (VENEDY TWP) COUNTIES)
ELEC0309-003
09/01/2025
$52.41 $30.27 $82.68
ELECTRICIAN (CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (ALTON, E. ALTON, HARTFORD & WOOD RIVER) COUNTIES) ELEC0649-008
12/28/2025
$54.53 $29.46 $83.99
ELECTRICIAN (MACOUPIN (BARR, GIRARD, NILWOOD, NORTH & SOUTH OTTER, NORTH & SOUTH PALMYRA AAND VIRDEN TWPS), AND MONTGOMERY (BOIS D' ARC, HARVEL AND PITMAN TWPS) COUNTIES) ELEC0193-003
06/03/2024
$39.80 $23.08 $62.88
ELECTRICIAN (MONTGGOMERY COUNTY (EAST OF BUTLER GROVE, GRISHAM, HILLSBORO & RAYMOND TWPS)) ELEC0146-012
06/01/2022
$41.00 $20.68 $61.68
HOD CARRIER (ST. CLAIR COUNTY (BELLEVILLE)) LABO0459-004
08/01/2024
$34.14 $30.59 $64.73
IRONWORKER (BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY, MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE, MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR, AND WASHINGTON COUNTIES) IRON0392-003
08/01/2024
$41.65 $31.18 $72.83
IRONWORKER (BRIDGES, LOCKS, AND DAMS ON THE MISSISSIPPI RIVER) IRON0396-006
08/06/2025
$44.27 $31.65 $75.92
IRONWORKER (GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES) IRON0046-006
05/01/2024
$37.60 $32.94 $70.54
LABORER GROUP 1 GENERAL LABORER (MADISON COUNTY (SOUTHWEST)) LABO0044-001
08/01/2024
$32.35 $32.38 $64.73
LABORER GROUP 1 GENERAL LABORERS. (CALHOUN COUNTY (HARDIN)) LABO0218-006
08/01/2022
$32.84 $27.89 $60.73
LABORER GROUP 1 GENERAL LABORERS. (GREENE COUNTY (ROADHOUSE)) LABO0218-005
08/01/2022
$32.84 $27.89 $60.73
LABORER GROUP 1 GENERAL LABORERS. (JERSEY COUNTY (JERSEYVILLE)) LABO0218-004
08/01/2022
$32.84 $27.89 $60.73
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON)) LABO0397-003
08/01/2022
$33.58 $27.30 $60.88
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (GLEN CARBON)) LABO0044-002
08/01/2024
$32.35 $32.38 $64.73
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (ST. JACOB)) LABO0100-005
08/01/2024
$35.38 $29.35 $64.73
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; MASON AND PLASTERER TENDER (MADISON COUNTY (SOUTHWEST)) LABO0044-001
08/01/2024
$32.85 $32.38 $65.23
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS; ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER (MADISON COUNTY (GLEN CARBON)) LABO0044-002
08/01/2024
$32.85 $32.38 $65.23
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (CALHOUN COUNTY (HARDIN)) LABO0218-006
08/01/2022
$33.34 $27.89 $61.23
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (GREENE COUNTY (ROADHOUSE)) LABO0218-005
08/01/2022
$33.34 $27.89 $61.23
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (JERSEY COUNTY (JERSEYVILLE)) LABO0218-004
08/01/2022
$33.34 $27.89 $61.23
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY (ST. JACOB)) LABO0100-005
08/01/2024
$35.88 $29.35 $65.23
LABORER GROUP 3 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON)) LABO0397-003
08/01/2022
$35.08 $27.30 $62.38
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (CALHOUN COUNTY (HARDIN)) LABO0218-006
08/01/2022
$34.34 $27.89 $62.23
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (GREENE COUNTY (ROADHOUSE)) LABO0218-005
08/01/2022
$34.34 $27.89 $62.23
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (JERSEY COUNTY (JERSEYVILLE)) LABO0218-004
08/01/2022
$34.34 $27.89 $62.23
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY (GLEN CARBON)) LABO0044-002
08/01/2024
$33.85 $32.38 $66.23
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY (ST. JACOB)) LABO0100-005
08/01/2024
$36.88 $29.35 $66.23
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY (SOUTHWEST)) LABO0044-001
08/01/2024
$33.85 $32.38 $66.23
LABORER: GROUP 1:: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men LABO0218-007
08/01/2022
$32.84 $27.89 $60.73
LABORER: GROUP 2:: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men LABO0218-007
08/01/2022
$33.34 $27.89 $61.23
LABORER: GROUP 2 BRICK MASON AND PLASTERER TENDERS. MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON) LABO0397-003
08/01/2022
$34.08 $27.30 $61.38
LABORER: GROUP 3:: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men LABO0218-007
08/01/2022
$34.34 $27.89 $62.23
LABORERS, GROUP 1 GENERAL LABORER (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) LABO0218-001
08/01/2022
$32.84 $27.89 $60.73
LABORERS, GROUP 1 GENERAL LABORER (BOND (SORENTO) AND MONTGOMERY COUNTIES) LABO1084-001
08/01/2024
$32.41 $32.32 $64.73
LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY (EXCEPT THE NORTHSIDE)) LABO0622-003
08/01/2024
$29.65 $35.08 $64.73
LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY (GREENVILLE)) LABO0622-002
08/01/2024
$29.65 $35.08 $64.73
LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY (CARLYLE)) LABO0581-002
08/01/2024
$31.00 $33.73 $64.73
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (GRANITE CITY AND VICINITY)) LABO0397-002
08/01/2022
$33.58 $27.30 $60.88
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (SOUTHEAST)) LABO0397-001
08/01/2022
$33.43 $27.30 $60.73
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (WOOD RIVER)) LABO0338-002
08/01/2024
$34.14 $30.59 $64.73
LABORERS, GROUP 1 GENERAL LABORER (MONROE COUNTY) LABO0196-001
08/01/2024
$32.81 $31.92 $64.73
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) LABO0100-002
08/01/2024
$35.38 $29.35 $64.73
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) LABO0100-001
08/01/2024
$35.38 $29.35 $64.73
LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) LABO0742-001
08/01/2022
$29.26 $31.47 $60.73
LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY (SOUTH)) LABO0459-001
08/01/2024
$34.14 $30.59 $64.73
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND (SORENTO) AND MONTGOMERY COUNTIES) LABO1084-001
08/01/2024
$32.91 $32.32 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY (EXCEPT THE NORTHSIDE)) LABO0622-003
08/01/2024
$30.15 $35.08 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY (GREENVILLE)) LABO0622-002
08/01/2024
$30.15 $35.08 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY (CARLYLE)) LABO0581-002
08/01/2024
$31.50 $33.73 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (GRANITE CITY AND VICINITY)) LABO0397-002
08/01/2022
$34.08 $27.30 $61.38
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (SOUTHEAST)) LABO0397-001
08/01/2022
$33.93 $27.30 $61.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (WOOD RIVER)) LABO0338-002
08/01/2024
$34.64 $30.59 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MONROE COUNTY) LABO0196-001
08/01/2024
$33.31 $31.92 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AN...LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES)
LABO0100-002
08/01/2024
$35.88 $29.35 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) LABO0742-001
08/01/2022
$29.76 $31.47 $61.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY (SOUTH)) LABO0459-001
08/01/2024
$34.64 $30.59 $65.23
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIR...LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY))
LABO0100-001
08/01/2024
$35.88 $29.35 $65.23
LABORERS, GROUP 2ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) LABO0218-001
08/01/2022
$33.34 $27.89 $61.23
LABORERS, GROUP 3 DYNAMITE AND POWDER MAN (CLINTON COUNTY (CARLYLE)) LABO0581-002
08/01/2024
$32.50 $33.73 $66.23
LABORERS, GROUP 3 DYNAMITE MAN (BOND (SORENTO) AND MONTGOMERY COUNTIES) LABO1084-001
08/01/2024
$33.91 $32.32 $66.23
LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY (EXCEPT THE NORTHSIDE)) LABO0622-003
08/01/2024
$31.15 $35.08 $66.23
LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY (GREENVILLE)) LABO0622-002
08/01/2024
$31.15 $35.08 $66.23
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY (GRANITE CITY AND VICINITY)) LABO0397-002
08/01/2022
$35.08 $27.30 $62.38
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY (SOUTHEAST)) LABO0397-001
08/01/2022
$34.93 $27.30 $62.23
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) LABO0100-002
08/01/2024
$36.88 $29.35 $66.23
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) LABO0100-001
08/01/2024
$36.88 $29.35 $66.23
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) LABO0742-001
08/01/2022
$30.76 $31.47 $62.23
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY (SOUTH)) LABO0459-001
08/01/2024
$35.64 $30.59 $66.23
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) LABO0218-001
08/01/2022
$34.34 $27.89 $62.23
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY (WOOD RIVER)) LABO0338-002
08/01/2024
$35.64 $30.59 $66.23
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MONROE COUNTY) LABO0196-001
08/01/2024
$34.31 $31.92 $66.23
LINE CONSTRUCTION: BLASTER (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) ELEC0649-002
01/05/2026
$66.70 $30.84 $97.54
LINE CONSTRUCTION: EQUIPMENT OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) ELEC0649-002
01/05/2026
$57.12 $28.06 $85.18
LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON...LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU
ELEC0702-002
01/06/2025
$38.18 $19.92 $58.10
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CLASS I, ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, ...LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CLASS I, ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES)
ELEC0193-011
01/01/2025
$56.61 $24.20 $80.81
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, H...LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND,
ELEC0702-002
01/06/2025
$46.49 $22.33 $68.82
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITH WINCH, MAY OPERATE DIGGERS, 5TH WHEEL TYPE TRUCKS, CRAWLER-TYPE EQUIPMENT, D-4 AND SMALLER, BACKHOE 3/4 YARD AND UNDER, RUBBER TIRE AND CRAWLER W/END ...LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITH WINCH, MAY OPERATE DIGGERS, 5TH WHEEL TYPE TRUCKS, CRAWLER-TYPE EQUIPMENT, D-4 AND SMALLER, BACKHOE 3/4 YARD AND UNDER, RUBBER TIRE AND CRAWLER W/END LOADER, AND MAY DRIVE BUCKET TRUCK AND LIVE BOOM TYPE LINE TRUCKS) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES)
ELEC0193-011
01/01/2025
$42.85 $20.14 $62.99
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITHOUT WINCH) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMER...LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITHOUT WINCH) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES)
ELEC0193-011
01/01/2025
$40.36 $19.41 $59.77
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER W/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) ELEC0649-002
01/05/2026
$42.66 $23.87 $66.53
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER WO/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) ELEC0649-002
01/05/2026
$37.67 $22.42 $60.09
LINE CONSTRUCTION: GROUNDMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN...LINE CONSTRUCTION: GROUNDMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES)
ELEC0309-002
01/06/2025
$42.10 $18.84 $60.94
LINE CONSTRUCTION: GROUNDMAN (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) ELEC0649-002
01/05/2026
$36.67 $22.13 $58.80
LINE CONSTRUCTION: GROUNDMAN (CLASS A) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS ...LINE CONSTRUCTION: GROUNDMAN (CLASS A) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES)
ELEC0193-011
01/01/2025
$38.38 $18.82 $57.20
LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY ...LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNT
ELEC0309-002
01/06/2025
$56.38 $25.23 $81.61
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPER...LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES)
ELEC0309-002
01/06/2025
$46.03 $20.60 $66.63
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALL...LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT
ELEC0702-002
01/06/2025
$52.13 $23.97 $76.10
LINE CONSTRUCTION: LINEMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (...LINE CONSTRUCTION: LINEMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES)
ELEC0309-002
01/06/2025
$64.83 $29.01 $93.84
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF...LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES)
ELEC0193-011
01/01/2025
$62.90 $26.06 $88.96
LINE CONSTRUCTION: LINEMAN; AND LINEMAN HOLE BORING MACHINE OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) ELEC0649-002
01/05/2026
$66.70 $30.84 $97.54
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM PAIN0058-002
05/01/2017
$32.45 $17.12 $49.57
PILEDRIVERMAN (GREENE COUNTY) CARP0270-023
05/15/2020
$35.05 $28.57 $63.62
PILEDRIVERMAN:MACOUPIN and MONTGOMERY COUNTIES CARP0270-015
05/01/2017
$33.15 $25.97 $59.12
POWER EQUIPMENT OPERATOR GROUP 01 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$47.20 $39.10 $86.30
POWER EQUIPMENT OPERATOR GROUP 02 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$46.07 $39.10 $85.17
POWER EQUIPMENT OPERATOR GROUP 03 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$41.59 $39.10 $80.69
POWER EQUIPMENT OPERATOR GROUP 04 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$41.65 $39.10 $80.75
POWER EQUIPMENT OPERATOR GROUP 05 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$41.65 $39.10 $80.75
POWER EQUIPMENT OPERATOR GROUP 06 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$49.75 $39.10 $88.85
POWER EQUIPMENT OPERATOR GROUP 09 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$48.20 $39.10 $87.30
POWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER ENGI0520-005
08/01/2022
$46.75 $34.95 $81.70
POWER EQUIPMENT OPERATOR GROUP 11 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$49.20 $39.10 $88.30
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC ENGI0520-005
08/01/2022
$44.45 $34.95 $79.40
POWER EQUIPMENT OPERATOR GROUP 12 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) ENGI0520-012
08/01/2025
$50.20 $39.10 $89.30
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT ENGI0520-005
08/01/2022
$45.45 $34.95 $80.40
POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 11 MASTER MECHANIC ENGI0520-005
08/01/2022
$44.45 $34.95 $79.40
POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 12 LICENSED BOAT PILOT ENGI0520-005
08/01/2022
$45.45 $34.95 $80.40
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGE...POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICK-TYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOURNAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOB-HOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OF BIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SIGNS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAW-BLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPORTERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW). INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK
ENGI0520-005
08/01/2022
$42.45 $34.95 $77.40
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGE...POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICKTYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOUMAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOBHOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OFBIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SINGS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAWBLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPMIERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW)
ENGI0520-005
08/01/2022
$42.45 $34.95 $77.40
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS ENGI0520-005
08/01/2022
$41.32 $34.95 $76.27
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK ENGI0520-005
08/01/2022
$41.32 $34.95 $76.27
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK AIR ONE ENGI0520-005
08/01/2022
$36.84 $34.95 $71.79
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPHON OR JET (ONE), LIG...POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPHON OR JET (ONE), LIGHT PLANT (ONE), HEATER (ONE), IMMOBILE TRACK AIR (ONE), AND SELF-PROPELLED WALK BEHIND ROLLERS. INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK
ENGI0520-005
08/01/2022
$36.84 $34.95 $71.79
POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER, BLACKTOP PLANT OIL...POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER, BLACKTOP PLANT OILER AND CRETER CRANE OILER (WHEN REQUIRED), BARGE TENDERS, OILERS ON DRILL RIGS USED FOR CAISSON OR FOR PILE DRIVING. INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK
ENGI0520-005
08/01/2022
$43.45 $34.95 $78.40
POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER AND BLACK TOP PLANT OILER ENGI0520-005
08/01/2022
$43.45 $34.95 $78.40
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS ENGI0520-005
08/01/2022
$44.45 $34.95 $79.40
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK ENGI0520-005
08/01/2022
$44.45 $34.95 $79.40
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT ENGI0520-005
08/01/2022
$45.00 $34.95 $79.95
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTI...POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK
ENGI0520-005
08/01/2022
$45.00 $34.95 $79.95
POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT ENGI0520-005
08/01/2022
$45.30 $34.95 $80.25
POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES ENGI0520-005
08/01/2022
$45.60 $34.95 $80.55
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER ENGI0520-005
08/01/2022
$46.25 $34.95 $81.20
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEA...POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK
ENGI0520-005
08/01/2022
$46.25 $34.95 $81.20
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MEC...TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES)
TEAM0050-006
05/01/2025
$45.35 $25.72 $71.07
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MEC...TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES)
TEAM0525-004
05/01/2025
$45.35 $25.72 $71.07
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MEC...TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY)
TEAM0916-004
05/01/2025
$45.35 $25.72 $71.07
TRUCK DRIVER, GROUP 2 (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) TEAM0050-006
05/01/2025
$45.93 $25.72 $71.65
TRUCK DRIVER, GROUP 2 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) TEAM0525-004
05/01/2025
$45.93 $25.72 $71.65
TRUCK DRIVER, GROUP 2 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPO...TRUCK DRIVER, GROUP 2 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY)
TEAM0916-004
05/01/2025
$45.93 $25.72 $71.65
TRUCK DRIVER, GROUP 3 (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) TEAM0050-006
05/01/2025
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 3 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) TEAM0525-004
05/01/2025
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 3 (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) TEAM0916-004
05/01/2025
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) TEAM0050-006
05/01/2025
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISO...TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES)
TEAM0525-004
05/01/2025
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) TEAM0916-004
05/01/2025
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) TEAM0050-006
05/01/2025
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVI...TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES)
TEAM0525-004
05/01/2025
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEH...TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY)
TEAM0916-004
05/01/2025
$47.71 $25.72 $73.43

2 of 3: WD IL20260018, Mod 2

Make a WH-347 with these rates
Published June 17, 2026 68 classifications Covers 102 counties Types: Heavy Source: SAM.gov

Scope as published: ILLINOIS, INDIANA, MICHIGAN, MINNESOTA, NEW YORK, OHIO, PENNSYLVANIA AND WISCONSIN · DREDGING AND MARINE CONSTRUCTION Dredging and Marine Construction Projects: · Floating/land Equipment (including but not limited to all remote control, autonomous and semi-autonomous operations) engaged in clamshell, excavator, hydraulic dredging (including pipe assembly and/or disassembling for marine dredging) , and dragline dredging, assembly and disassembly of all cranes, marine construction, diving, surveying, bridges, salvage operations and cranes, loaders, dozers, or off road trucks, tugs, truck-able tugs, all boats (when performing marine work including transportation and delivery of personnel and materials), excavators, all winches, welding on equipment and its tooling, or other equipment used for disposal/handling of dredge spoils or marine construction materials on land at the slip or dock, at the project site, laydown yard, where the above material/spoils is being handled, and all equipment utilized on break wall/breakwater structures when aforementioned equipment is used on the Great Lakes, islands therein, their connecting and tributary waters, including the Illinois Waterway to the Lock at Lockport, Illinois (all work performed on Lockport Lock, to include Exciter Bay), the New York · State Barge Canal System between Tonawanda, New York and Waterford, New York and Oswego, · New York, the Duluth-Superior area to the Fond du Lac Bridge Crossing (Minnesota State Highway 23) on the St. Louis River and on the St. Lawrence River eastward to the International Boundary near St. Regis, New York. Extends to and covers all points up until where a Tug/Work Boat/Barge or similar vessel can no longer be floated up the tributary. Also includes demolition of a structure and/or dredging and diversion be performed which enables the Tug/Work Boat/Barge to further navigate the tributary.

Davis-Bacon rates in IL20260018 Mod 2, published 06/17/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DREDGING: (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOA...DREDGING: (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER)
SUIL2003-001
06/01/2025
$22.51 $7.61 $30.12
DREDGING: (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY Footnote A, B below SUIL2003-001
06/01/2025
$29.68 $7.61 $37.29
HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRIST...HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote A, B below
SUIL2003-001
06/01/2025
$25.15 $7.61 $32.76
HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY Footnote A, B below SUIL2003-001
06/01/2025
$26.49 $7.61 $34.10
HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY...HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote A, B below
SUIL2003-001
06/01/2025
$26.49 $7.61 $34.10
HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN, (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DA...HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN, (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote A, B below
SUIL2003-001
06/01/2025
$22.51 $7.61 $30.12
MECHANIC (UNDEFINED) (FLOATING EQUIPMENT: OHIO) Printed as $0.00 in the WD SUIL2003-001
06/01/2025
$0.00 $0.00 see note
MECHANIC (UNDEFINED) (FLOATING EQUIPMENT:) Printed as $0.00 in the WD SUIL2003-001
06/01/2025
$0.00 $0.00 see note
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGI...MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$73.95 $51.10 $125.05
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIV...MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$57.90 $43.80 $101.70
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGI...MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$53.00 $33.02 $86.02
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSG...MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$57.80 $29.50 $87.30
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) SUIL2003-001
06/01/2025
$67.40 $33.55 $100.95
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) SUIL2003-001
06/01/2025
$56.00 $36.81 $92.81
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) SUIL2003-001
06/01/2025
$65.75 $33.40 $99.15
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) SUIL2003-001
06/01/2025
$65.20 $35.75 $100.95
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) SUIL2003-001
06/01/2025
$55.95 $16.81 $72.76
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) SUIL2003-001
06/01/2025
$54.25 $16.81 $71.06
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) SUIL2003-001
06/01/2025
$53.00 $24.21 $77.21
MECHANIC (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) SUIL2003-001
06/01/2025
$57.15 $30.38 $87.53
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraul...MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$72.45 $51.10 $123.55
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydrauli...MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$56.40 $43.80 $100.20
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraul...MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$51.50 $33.02 $84.52
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydrau...MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$56.30 $29.50 $85.80
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) SUIL2003-001
06/01/2025
$65.90 $33.55 $99.45
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) SUIL2003-001
06/01/2025
$54.50 $36.81 $91.31
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) SUIL2003-001
06/01/2025
$64.25 $33.40 $97.65
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) SUIL2003-001
06/01/2025
$63.70 $35.75 $99.45
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) SUIL2003-001
06/01/2025
$54.45 $16.81 $71.26
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) SUIL2003-001
06/01/2025
$52.75 $16.81 $69.56
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) SUIL2003-001
06/01/2025
$51.50 $24.21 $75.71
MECHANIC (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) SUIL2003-001
06/01/2025
$55.65 $30.38 $86.03
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- IN...MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$75.45 $51.10 $126.55
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- IND...MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$59.40 $43.80 $103.20
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- IN...MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$54.50 $33.02 $87.52
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- I...MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$59.30 $29.50 $88.80
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) SUIL2003-001
06/01/2025
$68.90 $33.55 $102.45
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) SUIL2003-001
06/01/2025
$57.50 $36.81 $94.31
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) SUIL2003-001
06/01/2025
$67.25 $33.40 $100.65
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) SUIL2003-001
06/01/2025
$66.70 $35.75 $102.45
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) SUIL2003-001
06/01/2025
$57.45 $16.81 $74.26
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) SUIL2003-001
06/01/2025
$55.75 $16.81 $72.56
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) SUIL2003-001
06/01/2025
$54.50 $24.21 $78.71
MECHANIC (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) SUIL2003-001
06/01/2025
$58.65 $30.38 $89.03
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/l...MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$67.95 $51.10 $119.05
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/la...MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$51.90 $43.80 $95.70
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/l...MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$47.00 $33.02 $80.02
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/...MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$51.80 $29.50 $81.30
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) SUIL2003-001
06/01/2025
$61.40 $33.55 $94.95
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) SUIL2003-001
06/01/2025
$50.00 $36.81 $86.81
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) SUIL2003-001
06/01/2025
$59.75 $33.40 $93.15
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) SUIL2003-001
06/01/2025
$59.20 $35.75 $94.95
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) SUIL2003-001
06/01/2025
$49.95 $16.81 $66.76
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) SUIL2003-001
06/01/2025
$48.25 $16.81 $65.06
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) SUIL2003-001
06/01/2025
$47.00 $24.21 $71.21
MECHANIC (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) SUIL2003-001
06/01/2025
$51.15 $30.38 $81.53
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane...MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$63.45 $51.10 $114.55
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane ...MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$47.40 $43.80 $91.20
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane...MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$42.50 $33.02 $75.52
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Cran...MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY
Footnote NOTE below
SUIL2003-001
06/01/2025
$47.30 $29.50 $76.80
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) SUIL2003-001
06/01/2025
$56.90 $33.55 $90.45
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) SUIL2003-001
06/01/2025
$45.50 $36.81 $82.31
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) SUIL2003-001
06/01/2025
$55.25 $33.40 $88.65
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) SUIL2003-001
06/01/2025
$54.70 $35.75 $90.45
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) SUIL2003-001
06/01/2025
$45.45 $16.81 $62.26
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) SUIL2003-001
06/01/2025
$43.75 $16.81 $60.56
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) SUIL2003-001
06/01/2025
$42.50 $24.21 $66.71
MECHANIC (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) SUIL2003-001
06/01/2025
$46.65 $30.38 $77.03
Footnotes in IL20260018 (3)
  • SUIL2003-001 A: $30.10 per day per employee for medical
  • SUIL2003-001 B: Eight paid holidays: A thru H
  • SUIL2003-001 NOTE: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency

3 of 3: WD IL20260019, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 13 classifications Covers 102 counties Types: Heavy Source: SAM.gov

Scope as published: Dredging Construction Projects: Dredging the following rivers and their tributaries, the Kaskaskia River from the mouth to Fayetteville, Illinois; Illinois River; Minnesota River; Mississippi River and the Ohio River

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in IL20260019 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DREDGING: ENGINEER AND MECHANIC (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) SUIL2003-002
01/01/2025
$47.83 $31.75 $79.58
DREDGING: ENGINEER AND MECHANIC (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) SUIL2003-002
01/01/2025
$47.70 $31.75 $79.45
DREDGING: ENGINEER AND MECHANIC (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS) SUIL2003-002
01/01/2025
$47.70 $31.75 $79.45
DREDGING: ENGINEER AND MECHANIC (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS) SUIL2003-002
01/01/2025
$44.78 $34.21 $78.99
DREDGING: LEVERMEN AND BOATMAN (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) SUIL2003-002
01/01/2025
$55.69 $31.75 $87.44
DREDGING: LEVERMEN AND BOATMAN (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) SUIL2003-002
01/01/2025
$55.54 $31.75 $87.29
DREDGING: LEVERMEN AND BOATMAN (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:) SUIL2003-002
01/01/2025
$55.54 $31.75 $87.29
DREDGING: LEVERMEN AND BOATMAN (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO T...DREDGING: LEVERMEN AND BOATMAN (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.)
SUIL2003-002
01/01/2025
$47.02 $34.21 $81.23
DREDGING: LEVERMEN AND BOATMAN (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:) SUIL2003-002
01/01/2025
$44.78 $34.21 $78.99
DREDGING: OILER/DECKHAND: AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS Footnote NOTE below SUIL2003-002
01/01/2025
$38.57 $31.75 $70.32
DREDGING: OILER/DECKHAND: AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS Footnote NOTE below SUIL2003-002
01/01/2025
$36.59 $31.75 $68.34
DREDGING: OILER/DECKHAND: AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS Footnote NOTE below SUIL2003-002
01/01/2025
$36.59 $31.75 $68.34
DREDGING: OILER/DECKHAND: AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS Footnote NOTE below SUIL2003-002
01/01/2025
$37.65 $34.21 $71.86
Footnotes in IL20260019 (1)
  • SUIL2003-002 NOTE: All classifications of work performed in the Chicago District of the Army Corps of Engineers shall receive 5% above all current established wage rates, including those rates to which other premiums are applicable

Questions about these rates

What is the Davis-Bacon rate for electricians on heavy work in Calhoun County?
On WD IL20260017 Mod 5, published July 30, 2026, the row "ELECTRICIAN (MONTGGOMERY COUNTY (EAST OF BUTLER GROVE, GRISHAM, HILLSBORO & RAYMOND TWPS))" is $41.00 base plus $20.68 fringe, $61.68 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Calhoun County?
On WD IL20260017 Mod 5, published July 30, 2026, the row "CARPENTER (GREENE COUNTY)" is $35.05 base plus $28.57 fringe, $63.62 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on heavy work in Calhoun County?
On WD IL20260017 Mod 5, published July 30, 2026, the row "LABORERS, GROUP 1 GENERAL LABORER (MONROE COUNTY)" is $32.81 base plus $31.92 fringe, $64.73 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with IL20260017

Other counties: all Illinois counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.