Davis-Bacon wage rates · Illinois

McHenry County highway construction wage rates

Federal prevailing wage rates for highway construction in McHenry County, Illinois, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20262 wage determinations
Wage determination
IL20260011
Modification
2
Published
May 21, 2026
Classifications
104
Other types here
Building, Residential, Heavy

2 wage determinations cover highway work in McHenry County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Illinois prevailing wage for how the two fit together.

1 of 2: WD IL20260011, Mod 2

Make a WH-347 with these rates
Published May 21, 2026 104 classifications Covers 8 counties Types: Heavy, Highway Source: SAM.gov

Scope as published: Excludes Landscape Projects

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in IL20260011 Mod 2, published 05/21/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER (BOONE COUNTY) CARP0792-003
05/01/2025
$51.00 $36.13 $87.13
CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE (OREGON AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE COUNTIES) CARP0790-004
05/01/2025
$48.60 $38.53 $87.13
CARPENTER (DE KALB COUNTY) CARP0790-003
05/01/2025
$48.60 $38.53 $87.13
CARPENTER AND PILEDRIVER (KANE, MCHENRY (NORTH OF HWY 52), AND KENDALL COUNTIES) CARP0555-011
06/01/2022
$52.01 $38.86 $90.87
CARPENTER AND PILEDRIVER (WILL COUNTY) CARP0555-008
06/01/2020
$49.76 $38.26 $88.02
CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES) CARP0555-003
06/01/2022
$52.01 $38.85 $90.86
CARPENTER: HEAVY & HIGHWAY (DUPAGE ANE LAKE COUNTIES) CARP0555-003
06/01/2022
$52.01 $38.85 $90.86
CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY) PLAS0011-015
06/01/2023
$41.03 $36.39 $77.42
CEMENT MASON/CONCRETE FINISHER (DE KALB, KANE, KENDALL, AND MCHENRY COUNTIES) PLAS0011-008
06/01/2023
$50.70 $40.60 $91.30
CEMENT MASON/CONCRETE FINISHER (DUPAGE COUNTY) PLAS0803-001
08/01/2010
$38.00 $24.03 $62.03
CEMENT MASON/CONCRETE FINISHER (LAKE COUNTY) PLAS0011-013
06/01/2023
$48.50 $42.82 $91.32
CEMENT MASON/CONCRETE FINISHER (WILL COUNTY) PLAS0011-002
06/01/2023
$46.25 $45.10 $91.35
ELECTRICIAN (BOONE (ALL) & DEKALB (REMAINDER) COUNTIES) ELEC0364-003
06/02/2025
$62.61 $43.96 $106.57
ELECTRICIAN (DEKALB (SANDWICH TWP), KANE (SOUTHERN HALF) & KENDALL (ALL) COUNTIES) ELEC0461-006
06/02/2025
$60.17 $43.50 $103.67
ELECTRICIAN (DUPAGE COUNTY) ELEC0701-001
06/03/2019
$41.00 $43.40 $84.40
ELECTRICIAN (KANE (NORTHERN HALF) AND MCHENRY (ALL) COUNTIES) ELEC0117-001
06/02/2025
$59.11 $42.23 $101.34
ELECTRICIAN (LAKE COUNTY) ELEC0150-001
06/03/2024
$48.28 $50.46 $98.74
ELECTRICIAN (WILL COUNTY) ELEC0176-011
06/01/2023
$52.00 $45.01 $97.01
IRONWORKER (BOONE, DEKALB (EXCEPT SOUTHEAST), AND MCHENRY (NORTHWEST) COUNTIES) IRON0498-003
06/01/2021
$41.37 $44.41 $85.78
IRONWORKER (DEKALB (SOUTHEASTERN 2/3 INCLUDING SYCAMORE AND DEKALB), DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), AND MCHENRY (SOUTHEAST 1/4) COUNTIES) IRON0393-003
06/01/2021
$48.83 $39.84 $88.67
IRONWORKER (KENDALL (SOUTHERN PART) AND WILL COUNTIES) IRON0444-006
06/01/2022
$47.80 $42.50 $90.30
IRONWORKER, ORNAMENTAL (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) IRON0063-003
06/01/2025
$59.26 $44.81 $104.07
IRONWORKER: SHEETER (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) IRON0001-014
06/01/2025
$62.71 $46.58 $109.29
IRONWORKER: STRUCTURAL AND REINFORCING (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) IRON0001-014
06/01/2025
$62.46 $46.58 $109.04
LABORER GROUP 1 COMMON LABORER, ASPHALT LABORER, ASPHALT PLANT LABORER, STRIPING LABORER, CLIPPER TYPE CONCRETE SAW, SELF-PROPELLED SAWS (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.40 $36.94 $88.34
LABORER GROUP 1 GENERAL LABORERS; ASPHALT (LAKE COUNTY) LABO0152-003
06/01/2025
$51.40 $36.94 $88.34
LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK (GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND MINERA...LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK (GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS; SAND AND STONE WHEELERS TO MIXER HANDLERS); CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN; CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER; CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN & TARMEN, TANK CLEANERS; SCAFFOLD AND STAGING LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS SHALL BE TENDED BY LABORERS IF THE EMPLOYER DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING OF SLAB STEEL ROAD FORMS IN ANY MANNER, EXCEPT ROAD FORM SETTING, SETTING CENTER STRIPS, CONTRACTION AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER AND DRAIN TILE, RAILROAD TILES AND ALL OTHER CREOSOTED MATERIALS; PAVING BLOCKS AND CONCRETE FORMS; HANDLING OF INSULATION OF ANY TYPE; ALL WORK INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR AND COMPOSITION MIXERS OF SEWER WORK; TRACK LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON SWINGING SUSPENDED, OR ANY TYPE OR MAKE OF SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS (ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR CONCRETE OR MASONS EMPLOYERS; USE OF SKID STEER LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN; SNAPPING OF WALL TIES AND REMOVAL OF RODS; DRILLING OF ANCHOR BOLT HOLES; CONCRETE OR ASPHALT CLIPPER TYPE SAWS AND SELF-PROPELLED SAWS; SHOULDER AND GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING; CLEANING LUMBER, NAIL PULLING, DECK HAND; DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND FLAGMEN ON ALL CONSTRUCTION WORK; CLEANING OF DEBRIS; REMOVAL OF TREES; CONCRETE CURING, TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL; WRECKING AND DEMOLITION LABORERS (WILL COUNTY)
LABO0075-002
06/01/2025
$51.40 $36.94 $88.34
LABORER GROUP 2 AIR TAMPERS & VIBRATORS (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.68 $36.94 $88.62
LABORER GROUP 2 CEMENT GUN LABORERS (LAKE COUNTY) LABO0152-003
06/01/2025
$51.48 $36.94 $88.42
LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED, ON PUBLIC UTILITY WORK (GROUND LEVEL TO 8 FEET); PUMPCRETE PIPE HANDLERS (WILL COUNTY) LABO0075-002
06/01/2025
$51.75 $36.94 $88.69
LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS; PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT RUNAWAYS, AND RADII (ANY TYPE OF FORM) STRINGLINE MEN FOR ALL ...LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS; PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT RUNAWAYS, AND RADII (ANY TYPE OF FORM) STRINGLINE MEN FOR ALL AFOREMENTIONED WORK; WAGON AND TOWER DRILLERS ON LAND AND FLOATING PLANT USED ON DREDGING; ASPHALT GUNNERS AND PLUG MEN (UNDERCOATING ON ROAD WORK); MORTAR PUMP LABORERS; PLASTER PUMP LABORERS (WILL COUNTY)
LABO0075-002
06/01/2025
$51.40 $36.94 $88.34
LABORER GROUP 3 ASPHALT TAMPERS AND SMOOTHERS (LAKE COUNTY) LABO0152-003
06/01/2025
$51.40 $36.94 $88.34
LABORER GROUP 3 MORTAR & CONCRETE MIXERS (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.68 $36.94 $88.62
LABORER GROUP 4 RAKERS AND LUTEMEN; MACHINE SCREWMAN; KETTLEMEN; MIXERMEN, DRUM-MEN; JACKHAMMERMEN (ASPHALT); MITE BOX SPREADERS; LABORERS ON BIRCH OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON ...LABORER GROUP 4 RAKERS AND LUTEMEN; MACHINE SCREWMAN; KETTLEMEN; MIXERMEN, DRUM-MEN; JACKHAMMERMEN (ASPHALT); MITE BOX SPREADERS; LABORERS ON BIRCH OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSORS; PAVING FORM SETTERS; JACKHAMMERMAN (CONCRETE); POWER DRIVE CONCRETE SAWS (LAKE COUNTY)
LABO0152-003
06/01/2025
$51.63 $36.94 $88.57
LABORER GROUP 4 STRINGLINE & FORM SETTER; TORCHMAN (DEMOLITION), SHEETING & CRIBBING, BLACK TOP RAKERS & LUTEMEN, MACHINE SCREWMEN (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.68 $36.94 $88.62
LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN (BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL BOTTOM ME...LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN (BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH LABORERS 8 FEET OR MORE BELOW GROUND LEVEL REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND LEVEL DOWN 15 FEET; ALL AIR TOOLS 8 FEET OR MORE BELOW GROUND LEVEL; ALL LABORERS WORKING ON SWINGING-SUSPENDED OR ANY TYPE OR MAKE OF SCAFFOLDS, 48 FEET TO 100 FEET; ALL CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100 FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET; ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL (WILL COUNTY)
LABO0075-002
06/01/2025
$51.75 $36.94 $88.69
LABORER GROUP 5 CEMENT GUN NOZZLE (GUNITE) (LAKE COUNTY) LABO0152-003
06/01/2025
$51.60 $36.94 $88.54
LABORER GROUP 5 CHAIN SAW MAN, JACKHAMMER MAN, DRILLMAN, CONCRETE BREADERS & AIR SPADE (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.63 $36.94 $88.57
LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50 FEET; AND ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY ...LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50 FEET; AND ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OF TANK FOR EVERY ADDITIONAL 50 FEET OR PART THEREOF ABOVE 100 FEET IN HEIGHT (WILL COUNTY)
LABO0075-002
06/01/2025
$51.60 $36.94 $88.54
LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS (SUITING UP); BLASTING MEN (POWDERMEN) (WILL COUNTY) LABO0075-002
06/01/2025
$51.75 $36.94 $88.69
LABORER GROUP 6 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS; DOSIMETER (ANY DEVICE MONITORING NUCLEAR EXPOSURE) (LAKE COUNTY) LABO0152-003
06/01/2025
$51.60 $36.94 $88.54
LABORER GROUP 6 TUNNEL LABORERS, TILE LAYERS & BOTTOM MEN (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.75 $36.94 $88.69
LABORER GROUP 7 CAISSON DIGGERS, DYNAMITERS (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.75 $36.94 $88.69
LABORER GROUP 7 DOSIMETER (ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL 50...LABORER GROUP 7 DOSIMETER (ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL 50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH (WILL COUNTY)
LABO0075-002
06/01/2025
$51.60 $36.94 $88.54
LABORER GROUP 8 FLAGMAN (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$51.40 $36.94 $88.34
LABORER GROUP 9 ASBESTOS APATEMENT LABORERS, TOXIC & HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) LABO0149-002
06/01/2025
$52.40 $36.94 $89.34
LABORER, COMPRESSED AIR, 0-15 lbs (DU PAGE COUNTY) LABO0002-009
06/01/2025
$52.40 $36.94 $89.34
LABORER, COMPRESSED AIR, 16-20 lbs (DU PAGE COUNTY) LABO0002-009
06/01/2025
$52.90 $36.94 $89.84
LABORER, COMPRESSED AIR, 21-26 lbs (DU PAGE COUNTY) LABO0002-009
06/01/2025
$53.40 $36.94 $90.34
LABORER, COMPRESSED AIR, 27-33 lbs (DU PAGE COUNTY) LABO0002-009
06/01/2025
$54.40 $36.94 $91.34
LABORER, COMPRESSED AIR: 34 LBS AND OVER (DU PAGE COUNTY) LABO0002-009
06/01/2025
$55.40 $36.94 $92.34
LABORER, SEWER CONSTRUCTION: GROUP 1 SIGNALMEN TOP LABORERS, AND ALL OTHER LABORERS NOT MENTIONED. (DUPAGE COUNTY) LABO0002-004
06/01/2025
$51.40 $36.94 $88.34
LABORER, SEWER CONSTRUCTION: GROUP 2 CONCRETE LABORERS; STEEL SETTERS. (DUPAGE COUNTY) LABO0002-004
06/01/2025
$51.53 $36.94 $88.47
LABORER, SEWER CONSTRUCTION: GROUP 3 CEMENT CARRIERS; CEMENT MIXERS; CONCRETE REPAIRMEN; MORTAR MEN; SCAFFOLD MEN; AND SECOND BOTTOM MEN. (DUPAGE COUNTY) LABO0002-004
06/01/2025
$51.63 $36.94 $88.57
LABORER, SEWER CONSTRUCTION: GROUP 4 BOTTOM MEN; BRACERS-BRACING; BRICKLAYER'S TENDER; CATCH BASIN DIGGER; DRAINLAYER; DYNAMITER; FORM MEN; JACKHAMMERMEN; POWERPAC; PIPELAYERS; RODDERS; WELDERS & BURN...LABORER, SEWER CONSTRUCTION: GROUP 4 BOTTOM MEN; BRACERS-BRACING; BRICKLAYER'S TENDER; CATCH BASIN DIGGER; DRAINLAYER; DYNAMITER; FORM MEN; JACKHAMMERMEN; POWERPAC; PIPELAYERS; RODDERS; WELDERS & BURNERS; WELL POINT SYSTEM MEN. (DUPAGE COUNTY)
LABO0002-004
06/01/2025
$51.75 $36.94 $88.69
LABORER, SEWER CONSTRUCTION: GROUP 5 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER USE (ANY DEVICE) MONITORING NUCLEAR EXPOSURE. (DUPAGE COUNTY) LABO0002-004
06/01/2025
$51.40 $36.94 $88.34
LABORER, TUNNEL: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS (DUPAGE COUNTY) LABO0002-009
06/01/2025
$51.40 $36.94 $88.34
LABORER, TUNNEL: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER (DUPAGE COUNTY) LABO0002-009
06/01/2025
$51.53 $36.94 $88.47
LABORER, TUNNEL: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS (DUPAGE COUNTY) LABO0002-009
06/01/2025
$51.63 $36.94 $88.57
LABORER, TUNNEL: GROUP 4 AIR TRAC DRILL OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE OPERATO...LABORER, TUNNEL: GROUP 4 AIR TRAC DRILL OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE OPERATORS; MUCKING MACHINE OPERATOR; LASER BEAM OPERATOR; LINER PLATE AND RING SETTERS; SHIELD DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS; PIPE JACKING MACHINE OPERATOR; SKINNERS; MAINTENANCE TECHNICIAN (DUPAGE COUNTY)
LABO0002-009
06/01/2025
$51.75 $36.94 $88.69
LABORER, TUNNEL: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE (DUPAGE COUNTY) LABO0002-009
06/01/2025
$51.40 $36.94 $88.34
LABORER: GENERAL LABORER GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING LABORER, CLE...LABORER: GENERAL LABORER GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER, PIT MAN, MATERIAL CHECKER, LANDSCAPER, UNLOADING EXPLOSIVES, LAYING OF SOD, PLANTING OF TREES, ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING, FIRE-PROOFING, DRIVING STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW CLEANING, DEMOLITION WORKER, EXPLOSIVE HANDLING, TRIMMING & REMOVAL OF TREES, MULTI-PLATE PIPE, PILOT CARS FOR TRAFFIC CONTROL, POWER RIGGING (DE KALB COUNTY)
LABO0032-007
05/01/2025
$47.04 $36.31 $83.35
LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT HANDLER, CHL...LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT HANDLER, CHLORIDE HANDLER, UNLOADING & LABORERS WITH STEEL WORKERS & RE-BARS, WET CONCRETE WORKERS, TUNNEL TENDERS IN FREE AIR, BATCH DUMPER, MASON TENDER, KETTLE & TAR MAN, TANK CLEANER, PLASTIC INSTALLER, SCAFFOLD WORKER, MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS, LABORERS WITH DE-WATERING SYSTEMS, SEWER WORKERS PLUS DEPTH, VIBRATOR OPERATOR; CEMENT SILICA, CLAY, FLY ASH, LIME & PLASTERS HANDLERS (BULK OR BAG); COFFERDAM WORKER PLUS DEPTH, CONCRETE PAVING, PLACING, CUTTING & TYING OF REINFORCING, DECK HAND, DREDGE HAND AND SHORE LABORER, BANKMAN ON FLOATING PLANT, GRADE CHECKER, POWER TOOLS, FRONT END MAN ON CHIP SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITE NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER, BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL FORM SETTER - STREET & HIGHWAY, AIR TAMPING HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER CURB ASPHALT MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT PORTABLE OR TEMPORART PLANT, LABORER HANDLING MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING & SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE PUMP. (DE KALB COUNTY)
LABO0032-007
05/01/2025
$50.39 $36.31 $86.70
LINE CONSTRUCTION: EQUIPMENT OPERATOR (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) Footnote A below ELEC0196-001
03/06/2023
$49.22 $23.73 $72.95
LINE CONSTRUCTION: GROUNDMAN (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) Footnote A below ELEC0196-001
03/06/2023
$37.81 $19.86 $57.67
LINE CONSTRUCTION: GROUNDMAN (WILL COUNTY) ELEC0009-002
05/26/2024
$48.44 $29.09 $77.53
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) Footnote A below ELEC0196-001
03/06/2023
$39.19 $20.32 $59.51
LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR (WILL COUNTY) ELEC0009-002
05/26/2024
$62.10 $37.29 $99.39
LINE CONSTRUCTION: LINEMAN, SUBSTATION TECHNICIAN, CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) Footnote A below ELEC0196-001
03/06/2023
$59.17 $27.12 $86.29
OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO OR SIMILAR; BELT LOADER; CAISSON RIGS; CAR DUMPER, CE...OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO OR SIMILAR; BELT LOADER; CAISSON RIGS; CAR DUMPER, CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET WITH ATTACHMENTS); BACKHOE WITH SHEAR ATTACHMENT; CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT; CONCRETE PLACER; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE; CRETER CRANE; CRUSHER, STONE; DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING; DREDGES; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE; GRADALL AND MACHINES OF A LIKE NATURE; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING MACHINE; PILE DRIVERS AND SKID RIG; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM; ROCK DRILL-CRAWLER OR SKID RIG; ROCK DRILL TRUCK MOUNTED; ROTO MILL GRINDER, 36" AND OVER; ROTO MILL GRINDER, LESS THAN 36"; SLIP- FORM PAVER; SOIL TEST DRILL RIG, TRUCK MOUNTED; STRADDLE BUGGIES; GCI CRANE AND SIMILAR; HYDRAULIC TELESCOPING FORM (TUNNEL); TIE BACK MACHINE; TRACTOR DRAWN BELT LOADER: TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER; TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER CONVEYOR MACHINE; RAISED OR BLIND HOE DRILL (TUNNEL & SHAFT); TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; TRUCK MOUNTED CONCRETE CONVEYOR; UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5 FT; WHEEL EXCAVATOR & WIDENER (APSCO) (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
ENGI0150-015
06/01/2025
$56.60 $51.05 $107.65
OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON A...OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX PLANT*, COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER, STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR ($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER, (36" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND HOE DRILL, TUNNEL & SHAFT* (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES)
ENGI0150-024
06/01/2025
$63.00 $51.00 $114.00
OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOBCATS OVER.75 CU YD; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACH...OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOBCATS OVER.75 CU YD; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS; COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE, BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; LOCOMOTIVES, DINKY; PUMP CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, ETC SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR; SPREADER-CHIP- STONE ETC; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR. (BOONE AND DE KALB COUNTIES)
ENGI0150-015
06/01/2025
$56.05 $51.05 $107.10
OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU Y...OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE; BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR; SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) *REQUIRES OILER
ENGI0150-024
06/01/2025
$62.45 $51.00 $113.45
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS...OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES)
ENGI0150-024
06/01/2025
$60.40 $51.00 $111.40
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS...OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; PIPE JACKING MACHINES; POST- HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
ENGI0150-015
06/01/2025
$54.75 $51.05 $105.80
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL EQU...OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCATS UP TO AND INCLUDING.75 CU YD (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
ENGI0150-015
06/01/2025
$53.30 $51.05 $104.35
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL B...OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES)
ENGI0150-024
06/01/2025
$59.00 $51.00 $110.00
OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) ENGI0150-024
06/01/2025
$57.80 $51.00 $108.80
OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' I...OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR
ENGI0150-015
06/01/2025
$50.85 $51.05 $101.90
PAINTER: BRUSH ONLY (LAKE AND WILL COUNTIES) PAIN0014-003
06/01/2024
$53.05 $33.91 $86.96
PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) PAIN0030-001
06/01/2024
$53.05 $27.63 $80.68
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) PAIN0030-004
06/01/2024
$45.15 $29.41 $74.56
PLASTERER (BOONE COUNTY) PLAS0011-015
06/01/2023
$37.90 $37.66 $75.56
TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TR...TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT)
TEAM0731-002
04/01/2025
$43.40 $22.71 $66.11
TRUCK DRIVER: 2 - 3 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.47 $26.70 $75.17
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (KENDALL AND WILL COUNTIES) Part of the fringe is stated per week in a footnote Footnote A, B below TEAM0179-002
06/01/2025
$46.12 $0.30 see note
TRUCK DRIVER: 2-3 AXLES (DEKALB COUNTY) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-002
06/01/2025
$44.83 $0.30 see note
TRUCK DRIVER: 2-3 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.31 $0.30 $45.61
TRUCK DRIVER: 2-3 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$44.54 $13.40 $57.94
TRUCK DRIVER: 4 AXLE TRUCKS (KENDALL AND WILL COUNTIES) Part of the fringe is stated per week in a footnote Footnote A, B below TEAM0179-002
06/01/2025
$46.27 $0.30 see note
TRUCK DRIVER: 4 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.62 $26.70 $75.32
TRUCK DRIVER: 4 AXLES (DEKALB COUNTY) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-002
06/01/2025
$44.98 $0.30 see note
TRUCK DRIVER: 4 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.46 $0.30 $45.76
TRUCK DRIVER: 4 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$44.69 $13.40 $58.09
TRUCK DRIVER: 5 AXLE TRUCKS (KENDALL AND WILL COUNTIES) Part of the fringe is stated per week in a footnote Footnote A, B below TEAM0179-002
06/01/2025
$46.47 $0.30 see note
TRUCK DRIVER: 5 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.82 $26.70 $75.52
TRUCK DRIVER: 5 AXLES (DEKALB COUNTY) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-002
06/01/2025
$45.18 $0.30 see note
TRUCK DRIVER: 5 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.66 $0.30 $45.96
TRUCK DRIVER: 5 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$44.89 $13.40 $58.29
TRUCK DRIVER: 6 AXLE TRUCKS (KENDALL AND WILL COUNTIES) Part of the fringe is stated per week in a footnote Footnote A, B below TEAM0179-002
06/01/2025
$46.67 $0.30 see note
TRUCK DRIVER: 6 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.93 $26.70 $75.63
TRUCK DRIVER: 6 AXLES (DEKALB COUNTY) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-002
06/01/2025
$45.38 $0.30 see note
TRUCK DRIVER: 6 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.86 $0.30 $46.16
TRUCK DRIVER: 6 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$45.09 $13.40 $58.49
Footnotes in IL20260011 (8)
  • ELEC0196-001 A: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY
  • TEAM0179-002 A: HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK.
  • TEAM0179-002 B: LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
  • TEAM0301-001 A: $500.00 PER WEEK PENSION.
  • TEAM0301-001 B: LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
  • TEAM0325-004 NOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES
  • TEAM0330-002 A: HEALTH AND WELFARE $468.00 PER WEEK;PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION
  • TEAM0673-003 A: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: $589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION

2 of 2: WD IL20260020, Mod 2

Make a WH-347 with these rates
Published July 14, 2026 91 classifications Covers 19 counties Types: Building, Heavy, Highway, Residential Source: SAM.gov

Scope as published: Landscaping work on Building, Residential, Heavy and Highway Construction Projects

Davis-Bacon rates in IL20260020 Mod 2, published 07/14/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER 2 & 3 AXLES. (GRUNDY, LAKE & WILL COUNTIES) SUIL1993-001
01/19/1993
$11.86 $2.81 $14.67
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) SUIL1993-002
01/19/1993
$7.25 $0.00 $7.25
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DE KALB COUNTY) SUIL1993-001
01/19/1993
$7.25 $0.00 $7.25
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DU PAGE COUNTY) SUIL1993-001
01/19/1993
$7.25 none printed see note
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS. (COOK COUNTY) SUIL1993-001
01/19/1993
$7.25 $0.00 $7.25
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) SUIL1993-001
01/19/1993
$7.25 $0.00 $7.25
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (COOK COUNTY) SUIL1993-002
01/19/1993
$9.80 $1.82 $11.62
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) SUIL1993-001
01/19/1993
$9.66 $0.26 $9.92
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DU PAGE COUNTY) SUIL1993-002
01/19/1993
$9.04 $1.16 $10.20
LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (GRUNDY, LAKE & WILL COUNTIES) SUIL1993-001
01/19/1993
$12.00 $3.32 $15.32
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) SUIL1993-002
01/19/1993
$11.94 $2.42 $14.36
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (COOK COUNTY) SUIL1993-002
01/19/1993
$9.93 $1.89 $11.82
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (DU PAGE COUNTY) SUIL1993-002
01/19/1993
$8.32 $1.02 $9.34
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) SUIL1993-002
01/19/1993
$7.25 $0.00 $7.25
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (COOK COUNTY) SUIL1993-001
01/19/1993
$7.25 $0.00 $7.25
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DE KALB COUNTY) SUIL1993-001
01/19/1993
$7.25 $0.00 $7.25
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DU PAGE COUNTY) SUIL1993-002
01/19/1993
$7.25 $0.00 $7.25
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) SUIL1993-002
01/19/1993
$13.11 $3.01 $16.12
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (COOK COUNTY) SUIL1993-002
01/19/1993
$10.98 $2.12 $13.10
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) SUIL1993-002
01/19/1993
$7.25 $0.00 $7.25
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DU PAGE COUNTY) SUIL1993-001
01/19/1993
$10.75 $0.00 $10.75
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) SUIL1993-001
01/19/1993
$9.73 $2.05 $11.78
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (COOK COUNTY) SUIL1993-003
01/19/1993
$10.08 $2.06 $12.14
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) SUIL1993-002
01/19/1993
$9.66 $0.26 $9.92
LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DU PAGE COUNTY) SUIL1993-003
01/19/1993
$10.65 $0.00 $10.65
LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER (KANKAKEE COUNTY) SUIL1993-002
01/19/1993
$8.75 $0.17 $8.92
LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORER (DE KALB COUNTY) SUIL1993-002
01/19/1993
$7.25 $0.00 $7.25
LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATOR (KANKAKEE COUNTY) SUIL1993-003
01/19/1993
$16.57 $3.56 $20.13
LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) SUIL1993-002
01/19/1993
$7.25 $0.00 $7.25
LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) SUIL1993-001
01/19/1993
$9.66 $0.26 $9.92
LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- TRUCK DRIVERS, 2 & 3 AXLES (PEORIA, TAZEWELL, & WOODFORD COUNTIES) SUIL1993-003
01/19/1993
$17.58 $5.88 $23.46
LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (MCLEAN COUNTY) LABO0362-003
05/01/2018
$31.08 $24.43 $55.51
LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) LABO0996-004
05/01/2018
$32.73 $23.74 $56.47
LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (ROCK ISLAND COUNTY) LABO0309-006
01/01/2024
$33.77 $23.60 $57.37
LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (WINNEBAGO COUNTY) LABO0032-004
05/01/2025
$47.04 $36.31 $83.35
LANDSCAPE LABORER-HIGHWAY CONSTRUCTION (HENRY COUNTY) LABO0538-011
05/01/2024
$35.23 $28.10 $63.33
LANDSCAPE LABORER-HIGHWAY CONSTRUCTION (KANKAKEE COUNTY) LABO0751-004
05/01/2021
$39.44 $32.54 $71.98
OPERATORS- BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MA...OPERATORS- BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. INCLUDES ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES)
Footnote A, B below
ENGI0150-013
06/01/2024
$37.55 $9.50 $47.05
OPERATORS- HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR ECLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND TH...OPERATORS- HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR ECLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. INCLUDES THE FOLLOWING: ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES)
Footnote A, B below
ENGI0150-023
06/01/2024
$37.55 $9.50 $47.05
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (HENRY AND ROCK ISLAND COUNTIES)
TEAM0371-004
05/01/2025
$45.35 $25.72 $71.07
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
TEAM0026-005
05/01/2025
$45.29 $25.42 $70.71
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
TEAM0722-005
05/01/2025
$45.29 $25.42 $70.71
TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; ME...TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
TEAM0627-004
05/01/2024
$43.24 $24.27 $67.51
TRUCK DRIVER, GROUP 2 - 2 OR 3 AXLES HAULING LESS THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PUR...TRUCK DRIVER, GROUP 2 - 2 OR 3 AXLES HAULING LESS THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
TEAM0026-005
05/01/2025
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURP...TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (HENRY AND ROCK ISLAND COUNTIES)
TEAM0371-004
05/01/2025
$45.93 $25.72 $71.65
TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURP...TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
TEAM0627-004
05/01/2024
$43.83 $24.27 $68.10
TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYUDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PUR...TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYUDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
TEAM0722-005
05/01/2025
$45.88 $25.42 $71.30
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTCULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (MCLEAN (SOUTH OF...TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTCULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
TEAM0026-005
05/01/2025
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (PEORIA, TAZEWEL...TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES)
TEAM0627-004
05/01/2024
$44.10 $24.27 $68.37
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (HENRY AND ROCK ISLAND COUNTIES) TEAM0371-004
05/01/2025
$46.25 $25.72 $71.97
TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (OGLE (NORTH OF ...TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY)
TEAM0722-005
05/01/2025
$46.15 $25.42 $71.57
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (HENRY AND ROCK ISLAND COUNTIES) TEAM0371-004
05/01/2025
$46.60 $25.72 $72.32
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF...TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
TEAM0026-005
05/01/2025
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) TEAM0722-005
05/01/2025
$46.54 $25.42 $71.96
TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) TEAM0627-004
05/01/2024
$44.49 $24.27 $68.76
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) TEAM0371-004
05/01/2025
$47.71 $25.72 $73.43
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE...TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY)
TEAM0026-005
05/01/2025
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) TEAM0722-005
05/01/2025
$47.64 $25.42 $73.06
TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) TEAM0627-004
05/01/2024
$45.59 $24.27 $69.86
TRUCK DRIVER: 2 - 3 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.47 $26.70 $75.17
TRUCK DRIVER: 2 & 3 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below TEAM0786-001
06/01/2025
$53.95 $0.30 $54.25
TRUCK DRIVER: 2 OR 3 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below TEAM0731-001
06/01/2025
$45.55 $30.27 $75.82
TRUCK DRIVER: 2 OR 3 AXLES (KANKAKEE COUNTY) Footnote A below TEAM0179-008
06/01/2024
$44.82 $0.25 $45.07
TRUCK DRIVER: 2-3 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-004
06/01/2025
$44.83 $0.30 see note
TRUCK DRIVER: 2-3 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.31 $0.30 $45.61
TRUCK DRIVER: 2-3 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST C...TRUCK DRIVER: 2-3 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES)
Part of the fringe is stated per week in a footnote Footnote A, B below
TEAM0179-004
06/01/2025
$46.12 $0.30 see note
TRUCK DRIVER: 2-3 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$44.54 $13.40 $57.94
TRUCK DRIVER: 4 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.62 $26.70 $75.32
TRUCK DRIVER: 4 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-004
06/01/2025
$44.98 $0.30 see note
TRUCK DRIVER: 4 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.46 $0.30 $45.76
TRUCK DRIVER: 4 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST COR...TRUCK DRIVER: 4 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES)
Part of the fringe is stated per week in a footnote Footnote A, B below
TEAM0179-004
06/01/2025
$46.27 $0.30 see note
TRUCK DRIVER: 4 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below TEAM0731-001
06/01/2025
$45.80 $30.27 $76.07
TRUCK DRIVER: 4 AXLES (KANKAKEE COUNTY) Footnote A below TEAM0179-008
06/01/2024
$44.97 $0.25 $45.22
TRUCK DRIVER: 4 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$44.69 $13.40 $58.09
TRUCK DRIVER: 4 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below TEAM0786-001
06/01/2025
$54.21 $0.30 $54.51
TRUCK DRIVER: 5 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.82 $26.70 $75.52
TRUCK DRIVER: 5 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-004
06/01/2025
$45.18 $0.30 see note
TRUCK DRIVER: 5 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.66 $0.30 $45.96
TRUCK DRIVER: 5 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST COR...TRUCK DRIVER: 5 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES)
Part of the fringe is stated per week in a footnote Footnote A, B below
TEAM0179-004
06/01/2025
$46.47 $0.30 see note
TRUCK DRIVER: 5 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below TEAM0731-001
06/01/2025
$46.00 $30.27 $76.27
TRUCK DRIVER: 5 AXLES (KANKAKEE COUNTY) Footnote A below TEAM0179-008
06/01/2024
$45.17 $0.25 $45.42
TRUCK DRIVER: 5 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$44.89 $13.40 $58.29
TRUCK DRIVER: 5 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below TEAM0786-001
06/01/2025
$54.43 $0.30 $54.73
TRUCK DRIVER: 6 AXLES (BOONE AND WINNEBAGO COUNTIES) Footnote NOTE below TEAM0325-004
06/01/2025
$48.93 $26.70 $75.63
TRUCK DRIVER: 6 AXLES (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) Part of the fringe is stated per week in a footnote Footnote A below TEAM0330-004
06/01/2025
$45.38 $0.30 see note
TRUCK DRIVER: 6 AXLES (DU PAGE AND KANE COUNTIES) Footnote A below TEAM0673-003
06/01/2025
$45.86 $0.30 $46.16
TRUCK DRIVER: 6 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST COR...TRUCK DRIVER: 6 AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES)
Part of the fringe is stated per week in a footnote Footnote A, B below
TEAM0179-004
06/01/2025
$46.67 $0.30 see note
TRUCK DRIVER: 6 AXLES (HEAVY AND HIGHWAY) (COOK COUNTY) Footnote A, B, C below TEAM0731-001
06/01/2025
$46.20 $30.27 $76.47
TRUCK DRIVER: 6 AXLES (KANKAKEE COUNTY) Footnote A below TEAM0179-008
06/01/2024
$45.37 $0.25 $45.62
TRUCK DRIVER: 6 AXLES (LAKE AND MCHENRY COUNTIES) Footnote A, B below TEAM0301-001
06/01/2024
$45.09 $13.40 $58.49
TRUCK DRIVER: 6 AXLES. (BUILDING AND RESIDENTIAL) (COOK COUNTY) Footnote A, B below TEAM0786-001
06/01/2025
$54.64 $0.30 $54.94
Footnotes in IL20260020 (17)
  • ENGI0150-013 A: HEALTH AND WELFARE CONTRIBUTION IS $1,780.00 PER MONTH.
  • ENGI0150-013 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY.
  • ENGI0150-023 A: HEALTH AND WELFARE CONTRIBUTION IS $1,780.00 PER MONTH.
  • ENGI0150-023 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY.
  • TEAM0179-004 A: HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK
  • TEAM0179-004 B: LOWBOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
  • TEAM0179-008 A: $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
  • TEAM0301-001 A: $500.00 PER WEEK PENSION.
  • TEAM0301-001 B: LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
  • TEAM0325-004 NOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
  • TEAM0330-004 A: HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK. LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
  • TEAM0673-003 A: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK. PENSON: $589.90 PER WEEK. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
  • TEAM0731-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.
  • TEAM0731-001 B: 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
  • TEAM0731-001 C: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $448.80 PER WEEK. PENSION: $562.80 PER WEEK.
  • TEAM0786-001 A: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK. PENSION: $408 PER WEEK.
  • TEAM0786-001 B: 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.

Questions about these rates

What is the Davis-Bacon rate for electricians on highway work in McHenry County?
On WD IL20260011 Mod 2, published May 21, 2026, the row "ELECTRICIAN (LAKE COUNTY)" is $48.28 base plus $50.46 fringe, $98.74 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on highway work in McHenry County?
On WD IL20260011 Mod 2, published May 21, 2026, the row "CARPENTER: HEAVY & HIGHWAY (DUPAGE ANE LAKE COUNTIES)" is $52.01 base plus $38.85 fringe, $90.86 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on highway work in McHenry County?
On WD IL20260011 Mod 2, published May 21, 2026, the row "LABORER GROUP 1 GENERAL LABORERS; ASPHALT (LAKE COUNTY)" is $51.40 base plus $36.94 fringe, $88.34 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as highway construction?
Roads, streets, highways, runways, bridges, parking areas and related work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with IL20260011

Other counties: all Illinois counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.