Davis-Bacon wage rates · New Jersey
Atlantic County building construction wage rates
Federal prevailing wage rates for building construction in Atlantic County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NJ20260025
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 42
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.
WD NJ20260025, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
ASBESTOS REMOVAL The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous wast...ASBESTOS REMOVAL The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants) | LABO0008-001 05/01/2011 | $28.37 | $21.62 | $49.99 |
ASBESTOS WORKER/HEAT & FROST INSULATOR (includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of...ASBESTOS WORKER/HEAT & FROST INSULATOR (includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead | ASBE0089-004 07/01/2025 | $55.80 | $40.80 | $96.60 |
| CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | CARP0006-009 05/01/2025 | $57.42 | $34.17 | $91.59 |
| CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | CARP0006-010 05/01/2025 | $57.42 | $34.17 | $91.59 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0592-036 05/01/2025 | $53.21 | $33.42 | $86.63 |
| DRYWALL FINISHER/TAPER | PAIN0711-018 05/01/2025 | $44.87 | $30.15 | $75.02 |
| ELECTRICIAN AND CABLE SPLICER | ELEC0351-011 09/30/2024 | $55.05 | $48.76 | $103.81 |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE | ELEC0351-011 09/30/2024 | $46.51 | $34.39 | $80.90 |
| ELECTRICIAN: TELEDATA TECHNICIANS: 15 VOICE DATA LINES OR LESS | ELEC0351-009 09/01/2024 | $41.00 | $32.75 | $73.75 |
| ELECTRICIAN: TELEDATA TECHNICIANS: 16 VOICE DATA LINES OR MORE AND FIBER OPTICS | ELEC0351-009 09/01/2024 | $41.00 | $32.75 | $73.75 |
| ELEVATOR Footnote A, B below | ELEV0005-004 01/01/2025 | $71.85 | $38.44 | $110.29 |
| GLAZIER Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional | PAIN0021-035 05/01/2025 | $49.96 | $35.11 | $85.07 |
| IRONWORKER: REINFORCING | IRON0399-011 07/01/2024 | $53.24 | $38.40 | $91.64 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | IRON0399-011 07/01/2024 | $54.24 | $38.40 | $92.64 |
| LABORER: ASPHALT RAKER, ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPTE LABORER, PIPELAYER, POWER TOOLE OPERATOR AND SCREEDMAN | LABO0077-003 05/01/2022 | $35.75 | $30.22 | $65.97 |
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | LABO0077-002 05/01/2022 | $36.50 | $30.22 | $66.72 |
| MARBLE SETTER | BRNJ0007-012 07/07/2025 | $64.66 | $40.97 | $105.63 |
| MILLWRIGHT | CARP0715-007 05/01/2025 | $58.84 | $35.06 | $93.90 |
| PAINTER (BRUSH & ROLLER) | PAIN0711-019 05/01/2025 | $45.55 | $29.86 | $75.41 |
| PAINTER (SPRAY) | PAIN0711-019 05/01/2025 | $45.55 | $29.86 | $75.41 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION) | PLUM0322-009 05/01/2025 | $56.30 | $50.76 | $107.06 |
| PLASTERER | PLAS0008-007 05/01/2021 | $38.37 | $31.64 | $70.01 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | PLUM0322-009 05/01/2025 | $56.30 | $50.76 | $107.06 |
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTAR...POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-017 07/01/2025 | $61.72 | $37.50 | $99.22 |
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPE...POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-017 07/01/2025 | $60.13 | $37.50 | $97.63 |
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MAN LIFT...POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MAN LIFT/OUTSIDE ELEVATOR; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-017 07/01/2025 | $58.22 | $37.50 | $95.72 |
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: ...POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-017 07/01/2025 | $56.59 | $37.50 | $94.09 |
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-017 07/01/2025 | $52.88 | $37.50 | $90.38 |
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 1) ALL CRANES WITH BOOM INCLUDING JIB, 140 FT. AND OVER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, ...POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 1) ALL CRANES WITH BOOM INCLUDING JIB, 140 FT. AND OVER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-018 07/01/2025 | $70.24 | $37.50 | $107.74 |
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 2) ALL CRANES WITH BOOM INCLUDING JIB, LESS THAN 140 FT. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, ...POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 2) ALL CRANES WITH BOOM INCLUDING JIB, LESS THAN 140 FT. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL | ENGI0825-018 07/01/2025 | $68.58 | $37.50 | $106.08 |
ROOFER: ALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensin...ROOFER: ALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour | ROOF0030-027 05/01/2025 | $46.03 | $34.27 | $80.30 |
ROOFER: Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine ...ROOFER: Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour | ROOF0030-027 05/01/2025 | $35.95 | $21.85 | $57.80 |
ROOFER: SLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensin...ROOFER: SLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour | ROOF0030-027 05/01/2025 | $38.95 | $21.85 | $60.80 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | SHEE0027-009 06/01/2024 | $59.08 | $47.06 | $106.14 |
| SOFT FLOOR LAYER | CARP0029-006 05/01/2025 | $57.42 | $34.17 | $91.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SFNJ0669-006 04/01/2025 | $59.19 | $36.51 | $95.70 |
| TERRAZZO FINISHER | BRNJ0007-013 06/02/2025 | $43.63 | $32.12 | $75.75 |
| TILE FINISHER Work grouting all epoxy: $10.00 additional per day | BRNJ0007-017 06/02/2025 | $43.63 | $32.12 | $75.75 |
| TILE SETTER | BRNJ0007-017 06/02/2025 | $52.31 | $38.01 | $90.32 |
TRUCK DRIVER: DUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal pr...TRUCK DRIVER: DUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour | TEAM0331-002 05/01/2025 | $48.23 | $25.98 | $74.21 |
TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal ...TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour | TEAM0331-002 05/01/2025 | $48.58 | $25.98 | $74.56 |
| Work on high stacks: 22% per hour additional | BRNJ0002-013 05/01/2021 | $45.20 | $33.26 | $78.46 |
Footnotes in NJ20260025 (7)
- ASBE0089-004 NOTE: PAID HOLIDAYS: The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay
- ELEV0005-004 A: PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of
- ELEV0005-004 B: Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
- ENGI0825-017 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
- ENGI0825-018 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
- ROOF0030-027 NOTE: PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay
- TEAM0331-002 NOTE: PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas BEREAVEMENT LEAVE: Any worker having a death in his or her immediate family (parent, spouse, child, brother or sister, mother-in-law or father-in-law) shall be given three days time off with pay at the time of death upon furnishing proof of said death. This provision shall also apply to grandparents, when living with the worker
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Atlantic County?
What is the Davis-Bacon rate for plumbers on building work in Atlantic County?
What is the Davis-Bacon rate for carpenters on building work in Atlantic County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NJ20260025
Other counties: all New Jersey counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.