Davis-Bacon wage rates · New Jersey

Gloucester County building construction wage rates

Federal prevailing wage rates for building construction in Gloucester County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NJ20260032
Modification
1
Published
May 18, 2026
Classifications
40
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.

WD NJ20260032, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 40 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in NJ20260032 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazard...ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)
LABO0008-001
05/01/2011
$28.37 $21.62 $49.99
ASBESTOS WORKER/HEAT & FROST INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of...ASBESTOS WORKER/HEAT & FROST INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)
ASBE0014-004
05/01/2025
$60.84 $48.38 $109.22
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) CARP0006-010
05/01/2025
$57.42 $34.17 $91.59
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter CARP0006-009
05/01/2025
$57.42 $34.17 $91.59
CEMENT MASON/CONCRETE FINISHER PLAS0592-035
05/01/2025
$49.57 $37.06 $86.63
DRYWALL FINISHER/TAPER PAIN0711-018
05/01/2025
$44.87 $30.15 $75.02
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) AND CABLE SPLICER ELEC0351-007
09/30/2024
$55.05 $48.76 $103.81
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) CABLE SPLICER ON LEAD CABLE ELEC0351-007
09/30/2024
$46.51 $34.39 $80.90
ELEVATOR Footnote A, B below ELEV0005-004
01/01/2025
$71.85 $38.44 $110.29
IRONWORKER: REINFORCING IRON0399-007
07/01/2025
$53.24 $40.40 $93.64
IRONWORKER: STRUCTURAL AND ORNAMENTAL IRON0399-007
07/01/2025
$54.24 $40.40 $94.64
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN LABO0077-005
05/01/2022
$35.75 $30.22 $65.97
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE LABO0077-002
05/01/2022
$36.50 $30.22 $66.72
MARBLE SETTER BRNJ0007-012
07/07/2025
$64.66 $40.97 $105.63
PAID New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work wee...PAID New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday
The WD prints no trade name for this row
CARP0454-009
05/01/2023
$46.73 $41.69 see note
PAINTER (BRUSH & ROLLER) PAIN0711-019
05/01/2025
$45.55 $29.86 $75.41
PAINTER (SPRAY) PAIN0711-019
05/01/2025
$45.55 $29.86 $75.41
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION PLUM0322-009
05/01/2025
$56.30 $50.76 $107.06
PLASTERER SUNJ2004-008
01/02/2009
$42.33 $0.00 $42.33
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) PLUM0322-009
05/01/2025
$56.30 $50.76 $107.06
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTAR...POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPE...POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC...POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: ...POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$52.88 $37.50 $90.38
ROOFER: ALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensin...ROOFER: ALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour
Footnote NOTE below
ROOF0030-027
05/01/2025
$46.03 $34.27 $80.30
ROOFER: Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine ...ROOFER: Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour
Footnote NOTE below
ROOF0030-027
05/01/2025
$35.95 $21.85 $57.80
ROOFER: SLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensin...ROOFER: SLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour
Footnote NOTE below
ROOF0030-027
05/01/2025
$38.95 $21.85 $60.80
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) SHEE0019-018
07/15/2025
$62.62 $50.66 $113.28
SHEET METAL WORKER (SIGN MAKERS & HANGERS) Footnote NOTE below SHEE0019-018
07/15/2025
$35.13 $24.76 $59.89
SOFT FLOOR LAYER CARP0029-006
05/01/2025
$57.42 $34.17 $91.59
SPRINKLER FITTER (FIRE SPRINKLERS) SFNJ0692-003
05/01/2021
$60.83 $30.34 $91.17
TERRAZZO WORKER/SETTER BRNJ0007-014
07/01/2025
$61.77 $42.82 $104.59
TILE FINISHER Work grouting all epoxy: $10.00 additional per day BRNJ0007-017
06/02/2025
$43.63 $32.12 $75.75
TILE SETTER BRNJ0007-017
06/02/2025
$52.31 $38.01 $90.32
TRUCK DRIVER: DRUMP Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protec...TRUCK DRIVER: DRUMP Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of
Footnote NOTE below
TEAM0676-003
05/01/2025
$44.30 $34.11 $78.41
TRUCK DRIVER: OFF THE ROAD Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal...TRUCK DRIVER: OFF THE ROAD Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of
Footnote NOTE below
TEAM0676-003
05/01/2025
$44.65 $34.11 $78.76
Work at 30 ft. above the working surface, or on the swing stage: $1.00 per hour additional PAIN0021-035
05/01/2025
$49.96 $35.11 $85.07
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of bu...Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0715-007
05/01/2025
$58.84 $35.06 $93.90
Work on high stacks: 22% per hour additional BRNJ0002-013
05/01/2021
$45.20 $33.26 $78.46
Footnotes in NJ20260032 (6)
  • ELEV0005-004 A: PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.
  • ELEV0005-004 B: Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day
  • ENGI0825-020 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
  • ROOF0030-027 NOTE: PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay
  • SHEE0019-018 NOTE: PAID HOLIDAY: ELECTION DAY
  • TEAM0676-003 NOTE: PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays

Questions about these rates

What is the Davis-Bacon rate for plumbers on building work in Gloucester County?
On WD NJ20260032 Mod 1, published May 18, 2026, the row "PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)" is $56.30 base plus $50.76 fringe, $107.06 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Gloucester County?
On WD NJ20260032 Mod 1, published May 18, 2026, the row "CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)" is $57.42 base plus $34.17 fringe, $91.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on building work in Gloucester County?
On WD NJ20260032 Mod 1, published May 18, 2026, the row "LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN" is $35.75 base plus $30.22 fringe, $65.97 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NJ20260032

Other counties: all New Jersey counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.