Davis-Bacon wage rates · New Jersey

Hunterdon County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Hunterdon County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NJ20260055
Modification
3
Published
August 13, 2026
Classifications
29
Other types here
Building, Residential, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.

WD NJ20260055, Mod 3

Make a WH-347 with these rates
Published August 13, 2026 29 classifications Covers 1 county Types: Heavy Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in NJ20260055 Mod 3, published 08/13/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) CARP0006-014
05/01/2025
$57.42 $34.17 $91.59
CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRO...CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL.) WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL
CARP1556-003
05/01/2024
$52.98 $52.44 $105.42
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED...CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL.) WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL
CARP1556-003
05/01/2024
$52.02 $39.23 $91.25
CEMENT MASON BRNJ0004-001
05/01/2025
$49.60 $37.96 $87.56
ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE (EAST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (WEST OF STATE HWY. ...ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE (EAST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (WEST OF STATE HWY. 31); BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE; TOWNSHIP OF RARITAN (WEST OF STATE HWY. 31 AND SOUTH OF COUNTY ROUTE 523); BOROUGH OF STOCKTON; TOWNSHIP OF WEST AMWELL))
ELEC0269-022
01/05/2026
$63.82 $41.99 $105.81
ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE FOLLOWING COUNTY RO...ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (EAST OF STATE HWY. 31); TOWNSHIP OF FRANKLIN; BOROUGHS OF FRENCHTOWN, GLEN GARDNER, HAMPTON AND HIGH BRIDGE; TOWNSHIPS OF HOLLAND AND KINGWOOD; BOROUGH OF LEBANON; TOWNSHIP OF LEBANON; BOROUGH OF MILFORD; TOWNSHIP OF RARITAN (EAST OF STATE HWY. 31 AND NORTH OF COUNTY ROUTE 523); TOWNSHIPS OF READINGTON, TEWKSBURY AND UNION) WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. (WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPERSON RATE.)
ELEC0102-024
06/02/2025
$64.53 $42.27 $106.80
ELECTRICIAN: CABLE SPLICER (HUNTERDON COUNTY (TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE FOLL...ELECTRICIAN: CABLE SPLICER (HUNTERDON COUNTY (TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (EAST OF STATE HWY. 31); TOWNSHIP OF FRANKLIN; BOROUGHS OF FRENCHTOWN, GLEN GARDNER, HAMPTON AND HIGH BRIDGE; TOWNSHIPS OF HOLLAND AND KINGWOOD; BOROUGH OF LEBANON; TOWNSHIP OF LEBANON; BOROUGH OF MILFORD; TOWNSHIP OF RARITAN (EAST OF STATE HWY. 31 AND NORTH OF COUNTY ROUTE 523); TOWNSHIPS OF READINGTON, TEWKSBURY AND UNION) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL.) WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPERSON RATE
ELEC0102-024
06/02/2025
$71.97 $46.42 $118.39
IRONWORKER: REINFORCING (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) IRON0399-017
07/01/2024
$53.24 $38.40 $91.64
IRONWORKER: REINFORCING (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) IRON0011-009
07/01/2025
$49.94 $50.32 $100.26
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) IRON0399-017
07/01/2024
$54.24 $38.40 $92.64
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) IRON0011-009
07/01/2025
$52.24 $50.32 $102.56
LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO ...LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
LABO0172-009
03/01/2025
$50.95 $38.53 $89.48
LABORER: MASON TENDER: CEMENT/CONCRETE LABO0077-008
07/01/2012
$29.35 $23.07 $52.42
LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR...LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
LABO0172-009
03/01/2025
$51.65 $38.53 $90.18
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR O...MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)
CARP0715-007
05/01/2025
$58.84 $35.06 $93.90
PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) PAIN0711-024
05/01/2017
$40.19 $22.72 $62.91
PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) PAIN0711-024
05/01/2017
$29.05 $18.91 $47.96
PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) PAIN0711-023
05/01/2023
$58.28 $33.85 $92.13
PIPEFITTER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 ...PIPEFITTER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE))
PLUM0475-018
05/01/2025
$56.34 $50.80 $107.14
PLUMBER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO ...PLUMBER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON - MERCER COUNTY LINE))
PLUM0024-019
05/01/2025
$62.09 $45.05 $107.14
PLUMBER/PIPEFITTER (HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG ...PLUMBER/PIPEFITTER (HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE))
PLUM0009-026
07/01/2025
$59.57 $46.45 $106.02
PLUMBER/PIPEFITTER: SERVICE AND REPAIR (HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THE...PLUMBER/PIPEFITTER: SERVICE AND REPAIR (HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE))
PLUM0009-026
07/01/2025
$46.23 $29.23 $75.46
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY...POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER...POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL;...POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)PAID
Footnote NOTE below
ENGI0825-021
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNAT...POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$52.88 $37.50 $90.38
TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK; PICK UP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS...TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK; PICK UP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.) WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL
Footnote NOTE below
TEAM0469-008
05/01/2025
$48.63 $42.66 $91.29
TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PE...TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
TEAM0469-008
05/01/2025
$48.78 $42.66 $91.44
Footnotes in NJ20260055 (3)
  • ENGI0825-021 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
  • LABO0172-009 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED
  • TEAM0469-008 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)

Questions about these rates

What is the Davis-Bacon rate for plumbers on heavy work in Hunterdon County?
On WD NJ20260055 Mod 3, published August 13, 2026, the row "PLUMBER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT." is $62.09 base plus $45.05 fringe, $107.14 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Hunterdon County?
On WD NJ20260055 Mod 3, published August 13, 2026, the row "CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)" is $57.42 base plus $34.17 fringe, $91.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on heavy work in Hunterdon County?
On WD NJ20260055 Mod 3, published August 13, 2026, the row "LABORER: MASON TENDER: CEMENT/CONCRETE" is $29.35 base plus $23.07 fringe, $52.42 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NJ20260055

Other counties: all New Jersey counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.