Davis-Bacon wage rates · New Jersey

Middlesex County building construction wage rates

Federal prevailing wage rates for building construction in Middlesex County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NJ20260036
Modification
1
Published
May 18, 2026
Classifications
48
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.

WD NJ20260036, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 48 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in NJ20260036 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazard...ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)
LABO0008-001
05/01/2011
$28.37 $21.62 $49.99
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF...ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (MIDDLESEX COUNTY (does not include the Boroughs of Carteret and Dunellen; Township of Edison; Boroughs of Highland Park, Metuchen and Middlesex; City of New Brunswick; Township of Old Bridge; City of Perth Amboy; Township of Piscataway; Borough of Sayreville; City of South Amboy; Boroughs of South Plainfield and South River; Township of Woodbridge)
Footnote NOTE below
ASBE0089-008
07/01/2025
$55.80 $40.80 $96.60
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATIO...ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (MIDDLESEX COUNTY (Boroughs of Carteret and Dunellen; Township of Edison; Boroughs of Highland Park, Metuchen and Middlesex; City of New Brunswick; Township of Old Bridge; City of PerthAmboy; Township of Piscataway; Borough of Sayreville; City of South Amboy; Boroughs of South Plainfield and South River; Township of Woodbridge)
ASBE0032-009
09/19/2024
$51.74 $46.20 $97.94
BRICKLAYER Work on high stacks: 22% per hour additional BRNJ0002-015
11/01/2019
$43.56 $32.50 $76.06
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK) CARP0006-011
05/01/2025
$57.42 $34.17 $91.59
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter CARP0006-009
05/01/2025
$57.42 $34.17 $91.59
CEMENT MASON/CONCRETE FINISHER PLAS0592-036
05/01/2025
$53.21 $33.42 $86.63
DRYWALL FINISHER/TAPER PAIN0711-018
05/01/2025
$44.87 $30.15 $75.02
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING: CABLE SPLICER WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR...ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING: CABLE SPLICER WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR FLOOR; OR UNDER AIR PRESSURE; OR OVER CONVEYORS OR MOVING EQUIPMENT OR MACHINERY: 10% PER HOUR ADDITIONAL
ELEC0456-008
06/02/2025
$65.35 $46.56 $111.91
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING: ELECTRICIAN WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR F...ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING: ELECTRICIAN WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR FLOOR; OR UNDER AIR PRESSURE; OR OVER CONVEYORS OR MOVING EQUIPMENT OR MACHINERY: 10% PER HOUR ADDITIONAL
ELEC0456-008
06/02/2025
$61.40 $39.14 $100.54
ELEVATOR MECHANIC Work on the addition, replacement, refurbishing or relocation of control, drive, generating equipment, hoistway or pit equipment, including work involving a structural rise in the el...ELEVATOR MECHANIC Work on the addition, replacement, refurbishing or relocation of control, drive, generating equipment, hoistway or pit equipment, including work involving a structural rise in the elevator shafts in an existing building and other elevator work in the machine room, hoistway or pit; Also, changes in design and appearance of basic escalator equipment
Footnote NOTE below
ELEV0001-003
03/17/2013
$45.14 $27.46 $72.60
ELEVATOR MECHANIC: ALL OTHER WORK Footnote NOTE below ELEV0001-003
03/17/2013
$57.01 $27.61 $84.62
GLAZIER WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOT...GLAZIER WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL
PAIN0711-021
05/01/2025
$52.68 $31.29 $83.97
IRONWORKER: REINFORCING (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A...IRONWORKER: REINFORCING (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL
IRON0399-019
07/01/2024
$53.24 $38.40 $91.64
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUI...IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL
IRON0399-019
07/01/2024
$54.24 $38.40 $92.64
IRONWORKERS: REINFORCING (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) IRON0011-011
07/01/2025
$49.94 $50.32 $100.26
IRONWORKERS: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) IRON0011-011
07/01/2025
$52.24 $50.32 $102.56
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN LABO0077-005
05/01/2022
$35.75 $30.22 $65.97
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE LABO0077-002
05/01/2022
$36.50 $30.22 $66.72
MILLWRIGHT Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or ou...MILLWRIGHT Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0715-007
05/01/2025
$58.84 $35.06 $93.90
PAINTER (BRUSH & ROLLER) PAIN0711-020
05/01/2025
$45.55 $29.86 $75.41
PAINTER (PAPERHANGER) PAIN0711-020
05/01/2025
$45.55 $29.86 $75.41
PAINTER (SPRAY) PAIN0711-020
05/01/2025
$45.55 $29.86 $75.41
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (BOROUGHS OF DUNELLEN AND MIDDLESEX; TOWNSHIP OF PISCATAWAY; BOROUGH OF SOUTH PLAINFIELD)) PLUM0475-016
05/01/2025
$56.34 $50.80 $107.14
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) PLUM0009-021
07/01/2025
$59.57 $46.45 $106.02
PIPEFITTER: SERVICE AND REPAIR (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) PLUM0009-021
07/01/2025
$46.23 $29.23 $75.46
PLASTERER PLAS0008-008
05/01/2021
$38.37 $31.64 $70.01
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (BOROUGHS OF DUNELLEN AND MIDDLESEX; TOWNSHIP OF PISCATAWAY; BOROUGH OF SOUTH PLAINFIELD)) PLUM0024-016
05/01/2025
$62.09 $45.05 $107.14
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) PLUM0009-021
07/01/2025
$59.57 $46.45 $106.02
PLUMBER: SERVICE AND REPAIR (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD)) PLUM0009-021
07/01/2025
$46.23 $29.23 $75.46
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTAR...POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPE...POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC...POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: ...POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL
Footnote NOTE below
ENGI0825-020
07/01/2025
$52.88 $37.50 $90.38
ROOFER (INCLUDES ALL TYPES OF ROOFERS) (MIDDLESEX COUNTY (north and east of Route #18)) ROOF0004-008
06/01/2024
$44.52 $32.25 $76.77
ROOFER: ALL OTHER WORK (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION J...ROOFER: ALL OTHER WORK (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL
Footnote NOTE below
ROOF0030-030
05/01/2025
$46.03 $34.27 $80.30
ROOFER: SHINGLES (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON...ROOFER: SHINGLES (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL
Footnote NOTE below
ROOF0030-030
05/01/2025
$35.95 $21.85 $57.80
ROOFER: SLATE AND TILE (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION J...ROOFER: SLATE AND TILE (MIDDLESEX COUNTY (SOUTH AND WEST OF ROUTE #18)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL
Footnote NOTE below
ROOF0030-030
05/01/2025
$38.95 $21.85 $60.80
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) SHEE0027-010
06/01/2024
$59.08 $47.06 $106.14
SPRINKLER FITTER: FIRE SPRINKLERS (MIDDLESEX COUNTY (PRINCETON, SOUTH BRUNSWICK AND MONROE TOWNSHIPS)) SFNJ0669-009
07/01/2025
$69.97 $41.35 $111.32
SPRINKLER FITTER: FIRE SPRINKLERS (MIDDLESEX COUNTY (REMAINDER OF COUNTY)) SFNJ0696-005
01/01/2025
$67.97 $39.35 $107.32
TILE FINISHER (MIDDLESEX COUNTY (NORTH OF ROUTE 33)) WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY BRNJ0007-020
06/02/2025
$50.05 $33.90 $83.95
TILE FINISHER (MIDDLESEX COUNTY (SOUTH OF ROUTE 33)) WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY BRNJ0007-021
06/02/2025
$50.05 $33.90 $83.95
TILE SETTER (MIDDLESEX COUNTY (NORTH OF ROUTE 33)) BRNJ0007-020
06/02/2025
$64.90 $37.28 $102.18
TILE SETTER (MIDDLESEX COUNTY (SOUTH OF ROUTE 33)) BRNJ0007-021
06/02/2025
$64.90 $37.28 $102.18
TRUCK DRIVER: DUMP HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protecti...TRUCK DRIVER: DUMP HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour
Footnote NOTE below
TEAM0469-005
05/01/2025
$48.63 $42.66 $91.29
TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal ...TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour
Footnote NOTE below
TEAM0469-005
05/01/2025
$48.78 $42.66 $91.44
Footnotes in NJ20260036 (5)
  • ASBE0089-008 NOTE: PAID HOLIDAYS: The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay
  • ELEV0001-003 NOTE: PAID HOLIDAYS: New Year's Day, President's Day, Good Friday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas PAID VACATION: A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked. A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked. A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked
  • ENGI0825-020 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
  • ROOF0030-030 NOTE: PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY
  • TEAM0469-005 NOTE: PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours)

Questions about these rates

What is the Davis-Bacon rate for plumbers on building work in Middlesex County?
On WD NJ20260036 Mod 1, published May 18, 2026, the row "PLUMBER: SERVICE AND REPAIR (MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGHS OF DUNELLEN AND MIDDLESEX; BOROUGH OF SOUTH PLAINFIELD))" is $46.23 base plus $29.23 fringe, $75.46 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Middlesex County?
On WD NJ20260036 Mod 1, published May 18, 2026, the row "CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK)" is $57.42 base plus $34.17 fringe, $91.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on building work in Middlesex County?
On WD NJ20260036 Mod 1, published May 18, 2026, the row "LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN" is $35.75 base plus $30.22 fringe, $65.97 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NJ20260036