Davis-Bacon wage rates · New Jersey

Morris County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Morris County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NJ20260059
Modification
2
Published
August 13, 2026
Classifications
23
Other types here
Building, Residential, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.

WD NJ20260059, Mod 2

Make a WH-347 with these rates
Published August 13, 2026 23 classifications Covers 1 county Types: Heavy Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in NJ20260059 Mod 2, published 08/13/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) CARP0006-013
05/01/2025
$57.42 $34.17 $91.59
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) CARP0006-009
05/01/2025
$57.42 $34.17 $91.59
CEMENT MASON BRNJ0004-001
05/01/2025
$49.60 $37.96 $87.56
ELECTRICIAN (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REM...ELECTRICIAN (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE.)
ELEC0102-026
06/02/2025
$65.43 $42.86 $108.29
ELECTRICIAN: CABLE SPLICER (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK W...ELECTRICIAN: CABLE SPLICER (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE.)
ELEC0102-026
06/02/2025
$71.97 $46.42 $118.39
IRONWORKER: REINFORCING IRON0011-012
07/01/2025
$49.94 $50.32 $100.26
IRONWORKER: STRUCTURAL AND ORNAMENTAL IRON0011-012
07/01/2025
$52.24 $50.32 $102.56
LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO ...LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
LABO0172-009
03/01/2025
$50.95 $38.53 $89.48
LABORER: MASON TENDER: CEMENT/CONCRETE LABO0077-008
07/01/2012
$29.35 $23.07 $52.42
LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR...LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
LABO0172-009
03/01/2025
$51.65 $38.53 $90.18
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR O...MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER)
CARP0715-007
05/01/2025
$58.84 $35.06 $93.90
PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) PAIN0711-024
05/01/2017
$40.19 $22.72 $62.91
PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) PAIN0711-024
05/01/2017
$29.05 $18.91 $47.96
PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) PAIN0711-023
05/01/2023
$58.28 $33.85 $92.13
PIPEFITTER (MORRIS COUNTY (BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHIPS OF MENDHAM AND MOUNT OLIVE; TOWNSHIP ...PIPEFITTER (MORRIS COUNTY (BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHIPS OF MENDHAM AND MOUNT OLIVE; TOWNSHIP OF WASHINGTON (TOWN OF LONG VALLEY ONLY))
PLUM0475-022
05/01/2025
$56.34 $50.80 $107.14
PIPEFITTER (MORRIS COUNTY (DOES NOT INCLUDE THE BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHIPS OF MENDHAM AND M...PIPEFITTER (MORRIS COUNTY (DOES NOT INCLUDE THE BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHIPS OF MENDHAM AND MOUNT OLIVE; TOWNSHIP OF WASHINGTON (TOWN OF LONG VALLEY ONLY)))
PLUM0274-010
05/01/2022
$57.97 $40.22 $98.19
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY...POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER...POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL;...POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNAT...POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-021
07/01/2025
$52.88 $37.50 $90.38
TRUCK DRIVER: DUMP TRUCK (A. EMPLOYER CONTRIBUTES $2026.49 PER MONTH PER WORKER FOR HEALTH AND WELFARE). (HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, A...TRUCK DRIVER: DUMP TRUCK (A. EMPLOYER CONTRIBUTES $2026.49 PER MONTH PER WORKER FOR HEALTH AND WELFARE). (HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS WORKING IN A HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY OF THE WORKERS: $3.00 PER HOUR ADDITIONAL. HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
TEAM0408-003
05/01/2025
$46.41 $31.82 $78.23
TRUCK DRIVER: OFF THE ROAD TRUCK, FLATBED TRUCK, PICKUP TRUCK, VACUUM TRUCK (A. EMPLOYER CONTRIBUTES $2026.49 PER MONTH PER WORKER FOR HEALTH AND WELFARE.) (HAZARDOUS WASTE REMOVAL WORK, WHERE THE WOR...TRUCK DRIVER: OFF THE ROAD TRUCK, FLATBED TRUCK, PICKUP TRUCK, VACUUM TRUCK (A. EMPLOYER CONTRIBUTES $2026.49 PER MONTH PER WORKER FOR HEALTH AND WELFARE.) (HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS WORKING IN A HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY OF THE WORKERS: $3.00 PER HOUR ADDITIONAL. HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
TEAM0408-003
05/01/2025
$46.51 $31.82 $78.33
Footnotes in NJ20260059 (3)
  • ENGI0825-021 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
  • LABO0172-009 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED
  • TEAM0408-003 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, "SHAPES", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

Questions about these rates

What is the Davis-Bacon rate for electricians on heavy work in Morris County?
On WD NJ20260059 Mod 2, published August 13, 2026, the row "ELECTRICIAN (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PE" is $65.43 base plus $42.86 fringe, $108.29 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on heavy work in Morris County?
On WD NJ20260059 Mod 2, published August 13, 2026, the row "PIPEFITTER (MORRIS COUNTY (BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHI" is $56.34 base plus $50.80 fringe, $107.14 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Morris County?
On WD NJ20260059 Mod 2, published August 13, 2026, the row "CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)" is $57.42 base plus $34.17 fringe, $91.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NJ20260059

Other counties: all New Jersey counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.