Davis-Bacon wage rates · New Jersey
Ocean County residential construction wage rates
Federal prevailing wage rates for residential construction in Ocean County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NJ20260017
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 20
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.
WD NJ20260017, Mod 1
Make a WH-347 with these ratesScope as published: RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRNJ0002-004 05/01/2025 | $49.60 | $37.96 | $87.56 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | SUNJ2004-055 01/02/2009 | $15.60 | $2.46 | $18.06 |
| CARPENTER (INCLUDES DRYWALL HANGING, AND FORM WORK) | CARP0006-003 05/01/2025 | $37.19 | $22.18 | $59.37 |
| CEMENT MASON/CONCRETE FINISHER | SUNJ2004-055 01/02/2009 | $25.00 | $0.00 | $25.00 |
| ELECTRICIAN | ELEC0400-003 06/02/2025 | $57.70 | $45.92 | $103.62 |
| IRONWORKERS: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | IRON0399-010 07/01/2025 | $53.24 | $40.40 | $93.64 |
| IRONWORKERS: REINFORCING (NORTHERN THIRD OF COUNTY) | IRON0011-005 07/01/2025 | $49.94 | $50.32 | $100.26 |
| IRONWORKERS: STRUCTURAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | IRON0399-010 07/01/2025 | $54.24 | $40.40 | $94.64 |
| IRONWORKERS: STRUCTURAL (NORTHERN THIRD OF COUNTY) | IRON0011-005 07/01/2025 | $52.24 | $50.32 | $102.56 |
| LABORER: COMMON OR GENERAL | SUNJ2004-055 01/02/2009 | $12.33 | $0.00 | $12.33 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | LABO0077-001 07/01/2012 | $29.35 | $23.07 | $52.42 |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | SUNJ2004-055 01/02/2009 | $13.50 | $2.34 | $15.84 |
| PAINTER: BRUSH AND ROLLER | SUNJ2004-055 01/02/2009 | $25.20 | $5.99 | $31.19 |
PLUMBER (OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown;...PLUMBER (OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then,continuing along State Highway Route 72 until it reaches the Burlington County line) | PLUM0322-004 06/01/2025 | $31.50 | $13.41 | $44.91 |
PLUMBER/PIPEFITTER (OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town o...PLUMBER/PIPEFITTER (OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line) | PLUM0009-014 07/01/2025 | $34.25 | $21.31 | $55.56 |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER Footnote NOTE below | ENGI0825-006 07/01/2025 | $61.72 | $37.50 | $99.22 |
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD Footnote NOTE below | ENGI0825-006 07/01/2025 | $60.13 | $37.50 | $97.63 |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD Footnote NOTE below | ENGI0825-006 07/01/2025 | $58.22 | $37.50 | $95.72 |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD Footnote NOTE below | ENGI0825-006 07/01/2025 | $56.59 | $37.50 | $94.09 |
| ROOFER (ALL TYPES) | ROOF0030-019 05/01/2024 | $34.35 | $21.75 | $56.10 |
Footnotes in NJ20260017 (1)
- ENGI0825-006 NOTE: PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday
Questions about these rates
What is the Davis-Bacon rate for electricians on residential work in Ocean County?
What is the Davis-Bacon rate for plumbers on residential work in Ocean County?
What is the Davis-Bacon rate for carpenters on residential work in Ocean County?
Which wage determination applies to my project?
What counts as residential construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NJ20260017
Other counties: all New Jersey counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.