Davis-Bacon wage rates · New Jersey
Salem County building construction wage rates
Federal prevailing wage rates for building construction in Salem County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NJ20260041
- Modification
- 2
- Published
- August 13, 2026
- Classifications
- 41
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.
WD NJ20260041, Mod 2
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF...ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) | ASBE0042-003 07/01/2025 | $47.34 | $30.99 | $78.33 |
| BRICKLAYER WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL. | BRNJ0002-013 05/01/2021 | $45.20 | $33.26 | $78.46 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | CARP0006-010 05/01/2025 | $57.42 | $34.17 | $91.59 |
| CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | CARP0006-009 05/01/2025 | $57.42 | $34.17 | $91.59 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0592-035 05/01/2025 | $49.57 | $37.06 | $86.63 |
| DRYWALL FINISHER/TAPER | PAIN0711-018 05/01/2025 | $44.87 | $30.15 | $75.02 |
| ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING | ELEC0351-007 09/30/2024 | $55.05 | $48.76 | $103.81 |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) | ELEC0351-007 09/30/2004 | $46.51 | $34.39 | $80.90 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0005-004 01/01/2025 | $71.85 | $38.44 | $110.29 |
| GLAZIER (WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL.) | PAIN0021-035 05/01/2025 | $49.96 | $35.11 | $85.07 |
| IRONWORKER: REINFORCING | IRON0399-007 07/01/2025 | $53.24 | $40.40 | $93.64 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | IRON0399-007 07/01/2025 | $54.24 | $40.40 | $94.64 |
LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZA...LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZARDOUS WASTE OR MATERIALS WHICH SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: THE ERECTION, MOVING, SERVICING AND DISMANTLING OF ALL ENCLOSURES, SCAFFOLDING AND BARRICADES; THE OPERATION OF ALL TOOLS AND EQUIPMENT NORMALLY USED IN THE REMOVAL OR ABATEMENT OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; THE LABELING, BAGGING, CARTONING, CRATING, OR OTHER PACKAGING OF MATERIALS FOR DISPOSAL; THE CLEAN-UP OF THE WORKSITE; AND ALL OTHER WORK INCIDENTAL TO THE REMOVAL, ABATEMENT, ENCAPSULATION, ENCLOSURE, AND DECONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS)) | LABO0008-001 05/01/2011 | $28.37 | $21.62 | $49.99 |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | LABO0077-005 05/01/2022 | $35.75 | $30.22 | $65.97 |
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | LABO0077-002 05/01/2022 | $36.50 | $30.22 | $66.72 |
| MARBLE SETTER | BRNJ0007-012 07/07/2025 | $64.66 | $40.97 | $105.63 |
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR O...MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | CARP0715-007 05/01/2025 | $58.84 | $35.06 | $93.90 |
| PAINTER: BRUSH AND ROLLER | PAIN0711-019 05/01/2025 | $45.55 | $29.86 | $75.41 |
| PAINTER: SPRAY | PAIN0711-019 05/01/2025 | $45.55 | $29.86 | $75.41 |
| PILEDRIVERMAN Footnote NOTE below | CARP0454-009 05/01/2023 | $46.73 | $41.69 | $88.42 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | PLUM0322-009 05/01/2025 | $56.30 | $50.76 | $107.06 |
| PLASTERER | SUNJ2004-017 01/02/2009 | $42.33 | $0.00 | $42.33 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION | PLUM0322-009 05/01/2025 | $56.30 | $50.76 | $107.06 |
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY...POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) | ENGI0825-020 07/01/2025 | $61.72 | $37.50 | $99.22 |
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER...POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) | ENGI0825-020 07/01/2025 | $60.13 | $37.50 | $97.63 |
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC;...POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) | ENGI0825-020 07/01/2025 | $58.22 | $37.50 | $95.72 |
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: ...POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) | ENGI0825-020 07/01/2025 | $56.59 | $37.50 | $94.09 |
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) | ENGI0825-020 07/01/2025 | $52.88 | $37.50 | $90.38 |
ROOFER: ALL OTHER WORK (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHI...ROOFER: ALL OTHER WORK (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL | ROOF0030-027 05/01/2025 | $46.03 | $34.27 | $80.30 |
ROOFER: SHINGLES (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR ...ROOFER: SHINGLES (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL | ROOF0030-027 05/01/2025 | $35.95 | $21.85 | $57.80 |
ROOFER: SLATE AND TILE (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHI...ROOFER: SLATE AND TILE (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL | ROOF0030-027 05/01/2025 | $38.95 | $21.85 | $60.80 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION Footnote NOTE below | SHEE0019-018 05/01/2025 | $62.62 | $50.66 | $113.28 |
| SHEET METAL WORKER: SIGN MAKERS & HANGERS Footnote NOTE below | SHEE0019-018 07/15/2025 | $35.13 | $24.76 | $59.89 |
| SOFT FLOOR LAYER | CARP0029-006 05/01/2025 | $57.42 | $34.17 | $91.59 |
| SPRINKLER FITTER: FIRE SPRINKLERS (SALEM COUNTY (DOES NOT INCLUDE PENNS GROVE, BUT INCLUDES PENNS GROVE AIRPORT)) | SFNJ0669-005 04/01/2025 | $59.19 | $36.51 | $95.70 |
| SPRINKLER FITTER: FIRE SPRINKLERS (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) | SFNJ0692-002 05/01/2021 | $60.83 | $30.34 | $91.17 |
| TERRAZZO WORKER/SETTER | BRNJ0007-014 07/01/2025 | $61.77 | $42.82 | $104.59 |
| TILE FINISHER (WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY.) | BRNJ0007-017 06/02/2025 | $43.63 | $32.12 | $75.75 |
| TILE SETTER | BRNJ0007-017 06/02/2025 | $52.31 | $38.01 | $90.32 |
TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL ...TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.) (WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL.) SHIFT AN OWNER MANDATED IRREGULAR SHIFT STARTING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY | TEAM0676-003 05/01/2025 | $44.30 | $34.11 | $78.41 |
TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN P...TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.) WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. (SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARTING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY.) | TEAM0676-003 05/01/2025 | $44.65 | $34.11 | $78.76 |
Footnotes in NJ20260041 (7)
- CARP0454-009 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY.)
- ELEV0005-004 A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.)
- ELEV0005-004 B: EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY.)
- ENGI0825-020 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
- ROOF0030-027 NOTE: PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY.)
- SHEE0019-018 NOTE: PAID HOLIDAY: ELECTION DAY.)
- TEAM0676-003 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS.) (BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMILY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALL ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS.)
Questions about these rates
What is the Davis-Bacon rate for plumbers on building work in Salem County?
What is the Davis-Bacon rate for carpenters on building work in Salem County?
What is the Davis-Bacon rate for laborers on building work in Salem County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NJ20260041
Other counties: all New Jersey counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.