Davis-Bacon wage rates · New Jersey

Salem County building construction wage rates

Federal prevailing wage rates for building construction in Salem County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NJ20260041
Modification
2
Published
August 13, 2026
Classifications
41
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.

WD NJ20260041, Mod 2

Make a WH-347 with these rates
Published August 13, 2026 41 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in NJ20260041 Mod 2, published 08/13/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF...ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT)
ASBE0042-003
07/01/2025
$47.34 $30.99 $78.33
BRICKLAYER WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL. BRNJ0002-013
05/01/2021
$45.20 $33.26 $78.46
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION CARP0006-010
05/01/2025
$57.42 $34.17 $91.59
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) CARP0006-009
05/01/2025
$57.42 $34.17 $91.59
CEMENT MASON/CONCRETE FINISHER PLAS0592-035
05/01/2025
$49.57 $37.06 $86.63
DRYWALL FINISHER/TAPER PAIN0711-018
05/01/2025
$44.87 $30.15 $75.02
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING ELEC0351-007
09/30/2024
$55.05 $48.76 $103.81
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) ELEC0351-007
09/30/2004
$46.51 $34.39 $80.90
ELEVATOR MECHANIC Footnote A, B below ELEV0005-004
01/01/2025
$71.85 $38.44 $110.29
GLAZIER (WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL.) PAIN0021-035
05/01/2025
$49.96 $35.11 $85.07
IRONWORKER: REINFORCING IRON0399-007
07/01/2025
$53.24 $40.40 $93.64
IRONWORKER: STRUCTURAL AND ORNAMENTAL IRON0399-007
07/01/2025
$54.24 $40.40 $94.64
LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZA...LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZARDOUS WASTE OR MATERIALS WHICH SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: THE ERECTION, MOVING, SERVICING AND DISMANTLING OF ALL ENCLOSURES, SCAFFOLDING AND BARRICADES; THE OPERATION OF ALL TOOLS AND EQUIPMENT NORMALLY USED IN THE REMOVAL OR ABATEMENT OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; THE LABELING, BAGGING, CARTONING, CRATING, OR OTHER PACKAGING OF MATERIALS FOR DISPOSAL; THE CLEAN-UP OF THE WORKSITE; AND ALL OTHER WORK INCIDENTAL TO THE REMOVAL, ABATEMENT, ENCAPSULATION, ENCLOSURE, AND DECONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS))
LABO0008-001
05/01/2011
$28.37 $21.62 $49.99
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN LABO0077-005
05/01/2022
$35.75 $30.22 $65.97
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE LABO0077-002
05/01/2022
$36.50 $30.22 $66.72
MARBLE SETTER BRNJ0007-012
07/07/2025
$64.66 $40.97 $105.63
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR O...MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)
CARP0715-007
05/01/2025
$58.84 $35.06 $93.90
PAINTER: BRUSH AND ROLLER PAIN0711-019
05/01/2025
$45.55 $29.86 $75.41
PAINTER: SPRAY PAIN0711-019
05/01/2025
$45.55 $29.86 $75.41
PILEDRIVERMAN Footnote NOTE below CARP0454-009
05/01/2023
$46.73 $41.69 $88.42
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION PLUM0322-009
05/01/2025
$56.30 $50.76 $107.06
PLASTERER SUNJ2004-017
01/02/2009
$42.33 $0.00 $42.33
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION PLUM0322-009
05/01/2025
$56.30 $50.76 $107.06
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY...POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER...POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC;...POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: ...POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$52.88 $37.50 $90.38
ROOFER: ALL OTHER WORK (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHI...ROOFER: ALL OTHER WORK (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL
Footnote NOTE below
ROOF0030-027
05/01/2025
$46.03 $34.27 $80.30
ROOFER: SHINGLES (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR ...ROOFER: SHINGLES (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL
Footnote NOTE below
ROOF0030-027
05/01/2025
$35.95 $21.85 $57.80
ROOFER: SLATE AND TILE (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHI...ROOFER: SLATE AND TILE (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL
Footnote NOTE below
ROOF0030-027
05/01/2025
$38.95 $21.85 $60.80
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION Footnote NOTE below SHEE0019-018
05/01/2025
$62.62 $50.66 $113.28
SHEET METAL WORKER: SIGN MAKERS & HANGERS Footnote NOTE below SHEE0019-018
07/15/2025
$35.13 $24.76 $59.89
SOFT FLOOR LAYER CARP0029-006
05/01/2025
$57.42 $34.17 $91.59
SPRINKLER FITTER: FIRE SPRINKLERS (SALEM COUNTY (DOES NOT INCLUDE PENNS GROVE, BUT INCLUDES PENNS GROVE AIRPORT)) SFNJ0669-005
04/01/2025
$59.19 $36.51 $95.70
SPRINKLER FITTER: FIRE SPRINKLERS (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) SFNJ0692-002
05/01/2021
$60.83 $30.34 $91.17
TERRAZZO WORKER/SETTER BRNJ0007-014
07/01/2025
$61.77 $42.82 $104.59
TILE FINISHER (WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY.) BRNJ0007-017
06/02/2025
$43.63 $32.12 $75.75
TILE SETTER BRNJ0007-017
06/02/2025
$52.31 $38.01 $90.32
TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL ...TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.) (WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL.) SHIFT AN OWNER MANDATED IRREGULAR SHIFT STARTING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY
Footnote NOTE below
TEAM0676-003
05/01/2025
$44.30 $34.11 $78.41
TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN P...TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.) WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL. (SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARTING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY.)
Footnote NOTE below
TEAM0676-003
05/01/2025
$44.65 $34.11 $78.76
Footnotes in NJ20260041 (7)
  • CARP0454-009 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY.)
  • ELEV0005-004 A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.)
  • ELEV0005-004 B: EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY.)
  • ENGI0825-020 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
  • ROOF0030-027 NOTE: PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY.)
  • SHEE0019-018 NOTE: PAID HOLIDAY: ELECTION DAY.)
  • TEAM0676-003 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS.) (BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMILY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALL ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS.)

Questions about these rates

What is the Davis-Bacon rate for plumbers on building work in Salem County?
On WD NJ20260041 Mod 2, published August 13, 2026, the row "PLUMBER: EXCLUDING HVAC PIPE INSTALLATION" is $56.30 base plus $50.76 fringe, $107.06 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Salem County?
On WD NJ20260041 Mod 2, published August 13, 2026, the row "CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION" is $57.42 base plus $34.17 fringe, $91.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on building work in Salem County?
On WD NJ20260041 Mod 2, published August 13, 2026, the row "LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN" is $35.75 base plus $30.22 fringe, $65.97 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NJ20260041

Other counties: all New Jersey counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.