Davis-Bacon wage rates · New Jersey

Somerset County building construction wage rates

Federal prevailing wage rates for building construction in Somerset County, New Jersey, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NJ20260042
Modification
2
Published
August 13, 2026
Classifications
48
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New Jersey prevailing wage for how the two fit together.

WD NJ20260042, Mod 2

Make a WH-347 with these rates
Published August 13, 2026 48 classifications Covers 1 county Types: Building Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in NJ20260042 Mod 2, published 08/13/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF...ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (SOMERSET COUNTY (BOROUGHS OF BERNARDSVILLE AND BOUND BROOK; TOWNSHIP OF BRIDGEWATER; BOROUGH OF FAR HILLS; TOWNSHIP OF GREEN BROOK; BOROUGHS OF NORTH PLAINFIELD, PEAPACK-GLADSTONE, RARITAN, SOMERVILLE, SOUTH BOUND BROOK AND WATCHUNG; TOWNSHIP OF WARREN)
ASBE0032-007
09/19/2024
$51.74 $46.20 $97.94
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF...ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (SOMERSET COUNTY (TOWNSHIPS OF BRANCHBURG, FRANKLIN, HILLSBOROUGH AND MONTGOMERY))
Footnote NOTE below
ASBE0089-007
07/01/2024
$55.80 $40.80 $96.60
BRICKLAYER (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.) BRNJ0002-013
05/01/2021
$45.20 $33.26 $78.46
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION CARP0006-011
05/01/2025
$57.42 $34.17 $91.59
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) CARP0006-009
05/01/2025
$57.42 $34.17 $91.59
CEMENT MASON BRNJ0004-001
05/01/2025
$49.60 $37.96 $87.56
DRYWALL FINISHER/TAPER PAIN0711-018
05/01/2025
$44.87 $30.15 $75.02
ELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) (SOMERSET COUNTY (DOES NOT INCLUDE THE TOWNSHIP OF FRANKLIN EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTER...ELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) (SOMERSET COUNTY (DOES NOT INCLUDE THE TOWNSHIP OF FRANKLIN EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANCH OF THE PENNSYLVANIA RAILROAD; THEN, WEST ALONG THE RAILROAD TO THE DELAWARE AND RARITAN CANAL; THEN, SOUTH ALONG THE CANAL TO THE MIDDLESEX COUNTY LINE; DOES NOT INCLUDE THE TOWNSHIP OF MONTGOMERY WEST AND SOUTH OF A LINE FOLLOWING U.S. HWY. 206 (FORMERLY STATE HWY. 31) NORTH FROM THE MERCER COUNTY LINE TO HARLINGEN RD.; THEN, WEST ALONG HARLINGEN RD. AND THE DUTCHTOWN-ZION ROAD TO THE HILLSBOROUGH TOWNSHIP LINE) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL.) (WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE.)
ELEC0102-022
06/02/2025
$69.72 $44.27 $113.99
ELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) (SOMERSET COUNTY (TOWNSHIP OF FRANKLIN (EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE...ELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) (SOMERSET COUNTY (TOWNSHIP OF FRANKLIN (EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANCH OF THE PENNSYLVANIA RAILROAD; THEN, WEST ALONG THE RAILROAD TO THE DELAWARE AND RARITAN CANAL; THEN, SOUTH ALONG THE CANAL TO THE MIDDLESEX COUNTY LINE)) (WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR FLOOR; OR UNDER AIR PRESSURE; OR OVER CONVEYORS OR MOVING EQUIPMENT OR MACHINERY: 10% PER HOUR ADDITIONAL.)
ELEC0456-007
05/30/2022
$65.35 $46.56 $111.91
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (SOMERSET COUNTY (DOES NOT INCLUDE THE TOWNSHIP OF FRANKLIN EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO...ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (SOMERSET COUNTY (DOES NOT INCLUDE THE TOWNSHIP OF FRANKLIN EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANCH OF THE PENNSYLVANIA RAILROAD; THEN, WEST ALONG THE RAILROAD TO THE DELAWARE AND RARITAN CANAL; THEN, SOUTH ALONG THE CANAL TO THE MIDDLESEX COUNTY LINE; DOES NOT INCLUDE THE TOWNSHIP OF MONTGOMERY WEST AND SOUTH OF A LINE FOLLOWING U.S. HWY. 206 (FORMERLY STATE HWY. 31) NORTH FROM THE MERCER COUNTY LINE TO HARLINGEN RD.; THEN, WEST ALONG HARLINGEN RD. AND THE DUTCHTOWN-ZION ROAD TO THE HILLSBOROUGH TOWNSHIP LINE) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL.) (WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE.)
ELEC0102-022
06/02/2025
$65.43 $42.86 $108.29
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (SOMERSET COUNTY (TOWNSHIP OF FRANKLIN (EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANC...ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (SOMERSET COUNTY (TOWNSHIP OF FRANKLIN (EAST OF A LINE FOLLOWING CEDAR GROVE LANE FROM THE RARITAN RIVER, IN A SOUTHWESTERLY DIRECTION, TO THE MILLSTONE BRANCH OF THE PENNSYLVANIA RAILROAD; THEN, WEST ALONG THE RAILROAD TO THE DELAWARE AND RARITAN CANAL; THEN, SOUTH ALONG THE CANAL TO THE MIDDLESEX COUNTY LINE)) (WORK ON LINE VOLTAGE OF 440 VOLTS AND OVER: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS AND LADDERS 40 FT. OR MORE FROM THE GROUND OR FLOOR; OR UNDER AIR PRESSURE; OR OVER CONVEYORS OR MOVING EQUIPMENT OR MACHINERY: 10% PER HOUR ADDITIONAL.)
ELEC0456-007
05/30/2022
$55.85 $39.79 $95.64
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY (WEST AND SOUTH OF A LINE FOLLOWING U.S. HWY. 206 (FORMERLY STATE HWY. 31) NORTH FROM THE MERCER COUNTY LINE TO HARLI...ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY (WEST AND SOUTH OF A LINE FOLLOWING U.S. HWY. 206 (FORMERLY STATE HWY. 31) NORTH FROM THE MERCER COUNTY LINE TO HARLINGEN RD.; THEN, WEST ALONG HARLINGEN RD. AND THE DUTCHTOWN-ZION ROAD TO THE HILLSBOROUGH TOWNSHIP LINE)))
ELEC0269-019
07/07/2025
$61.84 $40.32 $102.16
ELEVATOR MECHANIC: ALL OTHER WORK Footnote NOTE below ELEV0001-003
03/17/2013
$57.01 $27.61 $84.62
ELEVATOR MECHANIC: WORK ON THE ADDITION, REPLACEMENT, REFURBISHING OR RELOCATION OF CONTROL, DRIVE, GENERATING EQUIPMENT, HOISTWAY OR PIT EQUIPMENT, INCLUDING WORK INVOLVING A STRUCTURAL RISE IN THE E...ELEVATOR MECHANIC: WORK ON THE ADDITION, REPLACEMENT, REFURBISHING OR RELOCATION OF CONTROL, DRIVE, GENERATING EQUIPMENT, HOISTWAY OR PIT EQUIPMENT, INCLUDING WORK INVOLVING A STRUCTURAL RISE IN THE ELEVATOR SHAFTS IN AN EXISTING BUILDING AND OTHER ELEVATOR WORK IN THE MACHINE ROOM, HOISTWAY OR PIT; ALSO, CHANGES IN DESIGN AND APPEARANCE OF BASIC ESCALATOR EQUIPMENT
Footnote NOTE below
ELEV0001-003
03/17/2013
$45.14 $27.46 $72.60
GLAZIER (WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL.) (WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON ...GLAZIER (WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL.) (WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL.)
PAIN0711-021
05/01/2025
$52.68 $31.29 $83.97
IRONWORKER: REINFORCING (SOMERSET COUNTY (NORTHERN HALF OF COUNTY)) IRON0011-010
07/01/2025
$49.94 $50.32 $100.26
IRONWORKER: REINFORCING (SOMERSET COUNTY (SOUTHERN HALF OF COUNTY)) IRON0399-018
07/01/2024
$53.24 $38.40 $91.64
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (SOMERSET COUNTY (NORTHERN HALF OF COUNTY)) IRON0011-010
07/01/2025
$52.24 $50.32 $102.56
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (SOMERSET COUNTY (SOUTHERN HALF OF COUNTY)) IRON0399-018
07/01/2024
$54.24 $38.40 $92.64
LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZA...LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZARDOUS WASTE OR MATERIALS WHICH SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: THE ERECTION, MOVING, SERVICING AND DISMANTLING OF ALL ENCLOSURES, SCAFFOLDING AND BARRICADES; THE OPERATION OF ALL TOOLS AND EQUIPMENT NORMALLY USED IN THE REMOVAL OR ABATEMENT OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; THE LABELING, BAGGING, CARTONING, CRATING, OR OTHER PACKAGING OF MATERIALS FOR DISPOSAL; THE CLEAN-UP OF THE WORKSITE; AND ALL OTHER WORK INCIDENTAL TO THE REMOVAL, ABATEMENT, ENCAPSULATION, ENCLOSURE, AND DECONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS))
LABO0008-001
05/01/2011
$28.37 $21.62 $49.99
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN LABO0077-005
05/01/2022
$35.75 $30.22 $65.97
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE LABO0077-002
05/01/2022
$36.50 $30.22 $66.72
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR O...MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)
CARP0715-007
05/01/2025
$58.84 $35.06 $93.90
PAINTER: BRUSH AND ROLLER PAIN0711-020
05/01/2025
$45.55 $29.86 $75.41
PAINTER: PAPERHANGER PAIN0711-020
05/01/2025
$45.55 $29.86 $75.41
PAINTER: SPRAY PAIN0711-020
05/01/2025
$45.55 $29.86 $75.41
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (SOMERSET COUNTY (DOES NOT INCLUDE THE TOWNSHIP OF MONTGOMERY; BOROUGH OF ROCKY HILL)) PLUM0475-012
05/01/2025
$56.34 $50.80 $107.14
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY; BOROUGH OF ROCKY HILL)) PLUM0009-020
07/01/2025
$59.57 $46.45 $106.02
PLASTERER PLAS0008-008
05/01/2021
$38.37 $31.64 $70.01
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (SOMERSET COUNTY (DOES NOT INCLUDE THE TOWNSHIP OF MONTGOMERY; BOROUGH OF ROCKY HILL)) PLUM0024-011
05/01/2025
$62.09 $45.05 $107.14
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY; BOROUGH OF ROCKY HILL)) PLUM0009-020
07/01/2025
$59.57 $46.45 $106.02
PLUMBER/PIPEFITTER: SERVICE AND REPAIR (SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY; BOROUGH OF ROCKY HILL)) PLUM0009-020
07/01/2025
$46.23 $29.23 $75.46
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY...POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER...POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC;...POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: ...POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND ...POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
Footnote NOTE below
ENGI0825-020
07/01/2025
$52.88 $37.50 $90.38
ROOFER: ALL OTHER WORK (SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE NORTH ALONG ROUTE #206 TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY L...ROOFER: ALL OTHER WORK (SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE NORTH ALONG ROUTE #206 TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY LINE) (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL.)
Footnote NOTE below
ROOF0030-029
05/01/2025
$46.03 $34.27 $80.30
ROOFER: ALL TYPES (SOMERSET COUNTY (NORTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE ALONG ROUTE #206 NORTH TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY LINE)) ROOF0004-004
06/01/2024
$44.52 $32.25 $76.77
ROOFER: SHINGLES (SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE NORTH ALONG ROUTE #206 TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY LINE) (...ROOFER: SHINGLES (SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE NORTH ALONG ROUTE #206 TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY LINE) (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) (WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL.)
Footnote NOTE below
ROOF0030-029
05/01/2025
$35.95 $21.85 $57.80
ROOFER: SLATE AND TILE (SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE NORTH ALONG ROUTE #206 TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY L...ROOFER: SLATE AND TILE (SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE MERCER/SOMERSET COUNTY LINE NORTH ALONG ROUTE #206 TO ROUTE #514; THEN, WEST ALONG ROUTE #514 TO THE HUNTERDON/SOMERSET COUNTY LINE) (MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR ADDITIONAL.) ( WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG-DISPENSING MACHINE IS USED: $0.50 PER HOUR ADDITIONAL.)
Footnote NOTE below
ROOF0030-029
05/01/2025
$38.95 $21.85 $60.80
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION SHEE0025-005
06/01/2024
$51.30 $51.55 $102.85
SPRINKLER FITTER: FIRE SPRINKLERS (SOMERSET COUNTY (REMAINDER OF COUNTY)) SFNJ0696-004
01/01/2025
$67.97 $39.35 $107.32
SPRINKLER FITTER: FIRE SPRINKLERS (SOMERSET COUNTY (TOWNSHIPS OF BRANCHBURG AND MONTGOMERY; BOROUGH OF ROCKY HILL)) SFNJ0669-008
07/01/2025
$49.97 $41.35 $91.32
TILE FINISHER (WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY.) BRNJ0007-001
06/02/2025
$50.05 $33.90 $83.95
TILE SETTER BRNJ0007-001
06/02/2025
$64.90 $37.28 $102.18
TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL P...TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)
Footnote NOTE below
TEAM0469-005
05/01/2025
$48.63 $42.66 $91.29
TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PE...TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL
Footnote NOTE below
TEAM0469-005
05/01/2025
$48.78 $42.66 $91.44
Footnotes in NJ20260042 (5)
  • ASBE0089-007 NOTE: PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 HRS. PAY
  • ELEV0001-003 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY.) (PAID VACATION: A WORKER WHO HAS WORKED LESS THAN 5 YEARS: 4% OF HIS OR HER HOURLY RATE FOR ALL HOURS WORKED. A WORKER WHO HAS WORKED 5 TO 10 YEARS: 6% OF HIS OR HER HOURLY RATE FOR ALL HOURS WORKED. A WORKER WHO HAS WORKED 15 OR MORE YEARS: 8% OF HIS OR HER HOURLY RATE FOR ALL HOURS WORKED.)
  • ENGI0825-020 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY
  • ROOF0030-029 NOTE: PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY.)
  • TEAM0469-005 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) (VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)).

Questions about these rates

What is the Davis-Bacon rate for plumbers on building work in Somerset County?
On WD NJ20260042 Mod 2, published August 13, 2026, the row "PLUMBER/PIPEFITTER: SERVICE AND REPAIR (SOMERSET COUNTY (TOWNSHIP OF MONTGOMERY; BOROUGH OF ROCKY HILL))" is $46.23 base plus $29.23 fringe, $75.46 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Somerset County?
On WD NJ20260042 Mod 2, published August 13, 2026, the row "CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION" is $57.42 base plus $34.17 fringe, $91.59 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on building work in Somerset County?
On WD NJ20260042 Mod 2, published August 13, 2026, the row "LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN" is $35.75 base plus $30.22 fringe, $65.97 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NJ20260042

Other counties: all New Jersey counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.