Davis-Bacon wage rates · New York

Bronx County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Bronx County, New York, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20262 wage determinations
Wage determination
NY20260003
Modification
6
Published
August 13, 2026
Classifications
120
Other types here
Building, Residential, Highway

2 wage determinations cover heavy work in Bronx County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.

1 of 2: WD NY20260003, Mod 6

Make a WH-347 with these rates
Published August 13, 2026 120 classifications Covers 5 counties Types: Building, Heavy, Highway, Residential Source: SAM.gov

Scope as published: BUILDING CONSTRUCTION PROJECTS · RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories) · HIGHWAY CONSTRUCTION PROJECTS · HEAVY CONSTRUCTION PROJECTS

Davis-Bacon rates in NY20260003 Mod 6, published 08/13/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) ASBE0012-001
06/01/2025
$71.76 $36.81 $108.57
BOILERMAKER Footnote A below BOIL0005-001
01/01/2025
$68.88 $49.83 $118.71
BRICKLAYER BRNY0001-001
07/01/2024
$67.39 $35.90 $103.29
BRICKLAYER (MARBLE POLISHERS) BRNY0024-001
06/03/2024
$52.32 $36.25 $88.57
CARPENTER, BUILDING & RESIDENTIAL (BRONX AND NEW YORK COUNTIES) CARP0157-001
07/01/2025
$59.05 $48.08 $107.13
CARPENTER, BUILDING & RESIDENTIAL (KINGS COUNTY) CARP0926-001
07/01/2025
$59.05 $48.08 $107.13
CARPENTER, BUILDING & RESIDENTIAL (QUEENS COUNTY) CARP0045-001
07/01/2025
$59.05 $48.08 $107.13
CARPENTER, BUILDING & RESIDENTIAL (RICHMOND COUNTY) CARP0020-001
07/01/2025
$59.05 $48.08 $107.13
CARPENTER: HEAVY & HIGHWAY (BRONX AND NEW YORK COUNTIES) CARP0157-002
07/01/2025
$61.59 $55.84 $117.43
CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY) CARP0926-002
07/01/2025
$61.59 $55.84 $117.43
CARPENTER: HEAVY & HIGHWAY (QUEENS COUNTY) CARP0045-002
07/01/2025
$61.59 $55.84 $117.43
CARPENTER: HEAVY & HIGHWAY (RICHMOND COUNTY) CARP0020-002
07/01/2025
$61.59 $55.84 $117.43
CARPENTERS: (SOFT FLOOR LAYERS) CARP2287-004
07/01/2025
$59.05 $48.08 $107.13
CARPENTERS: (TIMBERMEN) CARP1556-011
07/01/2024
$55.59 $55.41 $111.00
CEMENT MASON/CONCRETE FINISHER PLAS0780-001
07/01/2025
$59.87 $41.81 $101.68
DIVER CARP1556-007
07/01/2024
$75.46 $55.84 $131.30
DIVER TENDER CARP1556-007
07/01/2024
$55.00 $55.84 $110.84
DOCK BUILDER & PILEDRIVERMEN CARP1556-006
07/01/2024
$60.59 $55.84 $116.43
ELECTRICIAN Footnote A below ELEC0003-001
04/10/2024
$62.00 $65.81 $127.81
ELECTRICIAN (JOBBING, AND MAINTENANCE AND REPAIR WORK) Footnote A below ELEC0003-001
04/10/2024
$32.00 $27.16 $59.16
ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR) Footnote A, B below ELEV0001-002
03/17/2022
$75.14 $47.45 $122.59
ELEVATOR MECHANIC (MODERNIZATION AND REPAIR) Footnote A, B below ELEV0001-002
03/17/2022
$59.09 $45.56 $104.65
GLAZIER PAIN0009-001
05/01/2025
$49.20 $57.20 $106.40
HAZARDOUS MATERIAL HANDLER ASBE0012-001
01/01/2025
$47.75 $13.70 $61.45
IRONWORKER (METALLIC LATHERS AND REINFORCING IRONWORKERS) IRON0046-003
07/01/2025
$57.00 $32.96 $89.96
IRONWORKER (STONE DERRICKMAN) IRON0197-001
07/01/2024
$60.40 $60.14 $120.54
IRONWORKER, STRUCTURAL (BRONX, NEW YORK, RICHMOND) IRON0040-002
07/01/2025
$58.95 $92.02 $150.97
IRONWORKER: ORNAMENTAL IRON0580-001
07/01/2025
$48.15 $67.62 $115.77
IRONWORKERS: (STRUCTURAL) (KINGS, QUEENS) IRON0361-002
07/01/2025
$58.95 $92.02 $150.97
LABORER (CEMENT AND CONCRETE WORKERS) LABO0006-001
07/01/2022
$49.28 $27.05 $76.33
LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE LABO0731-001
07/01/2023
$44.50 $52.08 $96.58
LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER Footnote NOTE below LABO0731-001
07/01/2023
$44.35 $52.08 $96.43
LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CAN CONSIST OF SHEET ROCK, BLOCK OR MASONRY....LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CAN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO AL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED)
LABO0079-001
07/01/2025
$40.22 $25.17 $65.39
LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BUILDING) LABO0079-001
07/01/2025
$29.29 $20.29 $49.58
LABORER, BUILDING CONSTRUCTION: MASON TENDER/GENERAL LABORER LABO0079-001
07/01/2025
$44.70 $29.55 $74.25
LABORERS-ASPHALT CONSTRUCTION: (MICRO PAVER) LABO1010-002
07/01/2025
$50.80 $54.05 $104.85
LABORERS-ASPHALT CONSTRUCTION: (RAKER) LABO1010-002
07/01/2025
$50.20 $54.05 $104.25
LABORERS-ASPHALT CONSTRUCTION: (SCREEDPERSON) LABO1010-002
07/01/2025
$50.80 $54.05 $104.85
LABORERS-ASPHALT CONSTRUCTION: (SHOVELER (PRODUCTION PAVING ONLY)) LABO1010-002
07/01/2025
$46.33 $54.05 $100.38
LABORERS-ASPHALT CONSTRUCTION: (SMALL EQUIPMENT OPERATOR (ASPHALT)) LABO1010-002
07/01/2025
$46.33 $54.05 $100.38
LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, D...LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION)
LABO0078-001
01/06/2025
$41.15 $20.90 $62.05
LABORERS: FENCE INSTALLER & REPAIRER (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS: FORMSETTERS (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$50.80 $54.04 $104.84
LABORERS: FREE AIR & TUNNEL MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDE...LABORERS: FREE AIR & TUNNEL MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDER CARRIERS, PAN MEN, RIGGERS, CHUCK TENDERS, TRACK MEN PAINTERS, NIPPERS, BRAKEMEN, CABLE MEN, HOSE MEN, GROUT MEN, GRAVEL MEN, FORM WORKERS, CONCRETE WORKERS, TUNNEL LABORERS, MOLE NIPPER (ONE (1) MOLE SIPPER PER WORKING SHAFT PER SHIFT FOR UP TO AND INCLUDING TWO (2) MOLES
LABO0147-001
07/01/2022
$64.08 $54.00 $118.08
LABORERS: HEAVY (BLASTERS (HYDRAULIC TRAC DRILL)) LABO0731-002
07/01/2023
$51.85 $52.08 $103.93
LABORERS: HEAVY (BLASTERS) LABO0731-002
07/01/2023
$57.71 $52.08 $109.79
LABORERS: HEAVY (HYDRAULIC TRAC DRILL) LABO0731-002
07/01/2023
$51.85 $52.08 $103.93
LABORERS: HEAVY (POWDER CARRIERS) LABO0731-002
07/01/2023
$44.50 $52.08 $96.58
LABORERS: LABORERS (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS: LANDSCAPE PLANTING & MAINTENANCE (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS: MAINTENANCE SAFETY SURFACE (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS: SLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS: SMALL EQUIPMENT OPERATOR (NOT OPERATING ENGINEER) (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS: SMALL POWER TOOLS OPERATOR (HIGHWAY CONSTRUCTION) Footnote A below LABO1010-001
07/01/2025
$46.33 $54.04 $100.37
LABORERS:, HEAVY (JACKHAMMERS, CHIPPERS, SPADERS, CONCRETE BREAKERS, ALL OTHER PNEUMATIC TOOLS, WALK BEHIND SELF-PROPELLED HYDRAULIC ASPHALT AND CONCRETE BREAKER) LABO0731-002
07/01/2023
$44.50 $52.08 $96.58
LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NO...LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT: GROUNDMAN (QUEENS COUNTY)
ELEC1049-001
03/30/2025
$42.34 $30.05 $72.39
LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NO...LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT: HEAVY EQUIPMENT OPERATOR (QUEENS COUNTY)
ELEC1049-001
03/30/2025
$56.46 $34.63 $91.09
LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NO...LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT: LINEMAN AND CABLE SPLICER (QUEENS COUNTY)
ELEC1049-001
03/30/2025
$70.57 $39.19 $109.76
MARBLE FINISHER BRNY0020-001
07/01/2024
$49.99 $37.54 $87.53
MARBLE MASON BRNY0004-001
07/01/2024
$63.92 $40.20 $104.12
MASON - STONE BRNY0001-001
05/01/2024
$69.91 $44.02 $113.93
MILLWRIGHT CARP0740-001
07/01/2025
$60.83 $58.03 $118.86
PAINTER (PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER) PAIN0009-001
05/01/2025
$44.75 $44.11 $88.86
PAINTER (SPRAY, SCAFFOLD AND SANDBLASTING) PAIN0009-001
05/01/2025
$47.75 $44.11 $91.86
PAINTERS: (DRYWALL TAPERS/POINTERS) PAIN1974-001
06/28/2025
$48.47 $35.91 $84.38
PAINTERS: (STRUCTURAL STEEL AND BRIDGE) PAIN0806-001
10/01/2024
$56.25 $55.14 $111.39
PLASTERER PLAS0262-001
08/01/2025
$48.51 $32.78 $81.29
PLASTERER (KINGS AND QUEENS COUNTIES) PLAS0262-002
08/01/2025
$48.51 $32.78 $81.29
PLUMBER PLUM0001-001
07/01/2025
$73.00 $32.81 $105.81
PLUMBER: MECHANICAL EQUIPMENT AND SERVICE (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING) PLUM0001-001
07/01/2025
$48.90 $22.26 $71.16
PLUMBER: SERVICE FITTERS (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERICAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER A...PLUMBER: SERVICE FITTERS (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERICAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUTNOT EXCLUSIVELY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITIONING, AIR COOLING, SOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE.)
PLUM0638-001
01/01/2026
$47.85 $23.96 $71.81
PLUMBER: SPRINKLER FITTERS, STEAMFITTERS PLUM0638-001
01/01/2026
$70.36 $54.24 $124.60
POINTER, CLEANER AND CAULKER BRNY0001-002
07/01/2024
$63.69 $32.42 $96.11
POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING & RESIDENTIAL) DOUBLE DRUM Footnote A below ENGI0014-002
07/01/2025
$92.32 $38.95 $131.27
POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING) OILER Footnote A below ENGI0015-002
07/01/2016
$65.94 $32.95 $98.89
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREM...POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00
Footnote A below
ENGI0015-001
07/01/2021
$74.65 $38.00 $112.65
POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM -...POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00
Footnote A below
ENGI0014-002
07/01/2025
$97.79 $38.95 $136.74
POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) Footnote A below ENGI0015-002
07/01/2016
$63.98 $32.95 $96.93
POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER M...POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, SCRAPERS, AND TURN-A PULLS, TUGGER HOIST (USED EXCLUSIVELY FOR HANDLING EXCAVATED MATERIAL), TRACTORS WITH ATTACHMENTS, HYSTER AND ROUSTABOUT CRANES, CHERRYPICKERS, AUSTIN WESTERN, GROVE AND MACHINES OF A SIMILAR NATURE, SCOOPMOBILES, MONORAILS, CONVEYORS, TRENCHERS, LOADERS- RUBBER-TIRED AND TRACTOR, BARBER GREENE, EIMCO LOADERS AND EIMCO BACKHOES, MIGHTY MIDGET AND SIMILAR BREAKERS AND TAMPERS, CURB AND GUTTER PAVERS AND MOTOR PATROL, MOTOR GRADERS AND ALL MACHINES OF A SIMILAR NATURE, LOCOMOTIVES TEN (10) TONS OR UNDER, MINI-MAX, BREAK-TECH AND MACHINES OF A SIMILAR NATURE, MILLING MACHINES, ROBOTIC AND DEMOLITION MACHINES AND MACHINES OF A SIMILAR NATURE INCLUDING BOBCAT, PILE RIG RUBBER-TIRED EXCAVATOR (37,000 LBS. AND UNDER), 2 MAN AUGER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00
Footnote A below
ENGI0015-001
07/01/2021
$72.40 $38.00 $110.40
POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS Footnote A below ENGI0014-002
07/01/2025
$79.70 $38.95 $118.65
POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES Footnote A below ENGI0015-002
07/01/2016
$57.42 $32.95 $90.37
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UND...POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00
Footnote A below
ENGI0015-001
07/01/2021
$68.62 $38.00 $106.62
POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL Footnote A below ENGI0014-002
07/01/2025
$72.46 $38.95 $111.41
POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT MANNED BY ...POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT MANNED BY TWO-MEN PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00
Footnote A below
ENGI0015-001
07/01/2021
$64.82 $38.00 $102.82
POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR ...POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS
Footnote A below
ENGI0014-002
07/01/2025
$54.12 $38.95 $93.07
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACH...POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00
Footnote A below
ENGI0015-001
07/01/2021
$44.45 $38.00 $82.45
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD.50 150' TO 249' BOOM - ADD.75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 Footnote A below ENGI0014-001
07/01/2025
$117.60 $38.95 $156.55
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 10 CONCRETE MIXERS Footnote A below ENGI0014-001
07/01/2025
$85.21 $38.95 $124.16
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 11 ELEVATORS Footnote A below ENGI0014-001
07/01/2025
$79.62 $38.95 $118.57
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 Footnote A below ENGI0014-001
07/01/2025
$81.38 $38.95 $120.33
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 13 VIBRATORY Footnote A below ENGI0014-001
07/01/2025
$81.97 $38.95 $120.92
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL Footnote A below ENGI0014-001
07/01/2025
$61.87 $38.95 $100.82
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT W...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC
Footnote A below
ENGI0014-001
07/01/2025
$57.52 $38.95 $96.47
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2 RUBBER TIRE BACKHOES OVER 37,000 LBS, TRACK BACKHOES, POWER SHOVEL, HYDRAULIC CLAM SHELLS, MOLES AND MACHINES OF A SIMILAR TYPE Footnote A below ENGI0014-001
07/01/2025
$97.06 $38.95 $136.01
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD.50 150' TO 249' BOOM - ADD.75 250' TO 3...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD.50 150' TO 249' BOOM - ADD.75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50
Footnote A below
ENGI0014-001
07/01/2025
$100.18 $38.95 $139.13
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRA...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD.50 150' TO 249' BOOM - ADD.75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50
Footnote A below
ENGI0014-001
07/01/2025
$97.75 $38.95 $136.70
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5 PILEDRIVERS, DERRICK BOATS, TUNNEL SHOVELS Footnote A below ENGI0014-001
07/01/2025
$95.83 $38.95 $134.78
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 6 ALL DRILLS, AND MACHINES OF A SIMILAR NATURE Footnote A below ENGI0014-001
07/01/2025
$92.01 $38.95 $130.96
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD.50 150' TO 249' BOOM ...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD.50 150' TO 249' BOOM - ADD.75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50
Footnote A below
ENGI0014-001
07/01/2025
$93.74 $38.95 $132.69
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS Footnote A below ENGI0014-001
07/01/2025
$91.04 $38.95 $129.99
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) Footnote A below ENGI0014-001
07/01/2025
$88.72 $38.95 $127.67
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT PLANTS Footnote A below ENGI0014-001
07/01/2025
$75.01 $38.95 $113.96
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT ROLLER Footnote A below ENGI0014-001
07/01/2025
$88.72 $38.95 $127.67
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT SPREADER ENGI0014-001
07/01/2025
$91.04 $38.95 $129.99
POWER EQUIPMENT OPERATOR, STEEL ERECTION: COMPRESSORS, WELDING MACHINES ENGI0014-001
07/01/2024
$56.34 $36.95 $93.29
POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS ENGI0014-001
07/01/2024
$96.26 $36.95 $133.21
POWER EQUIPMENT OPERATOR, STEEL ERECTION: THREE DRUM DERRICKS Footnote A below ENGI0014-001
07/01/2024
$100.14 $36.95 $137.09
POWER EQUIPMENT OPERATOR: UTILITY: HORIZONTAL BORING RIG Footnote A below ENGI0014-001
07/01/2025
$86.61 $38.95 $125.56
POWER EQUIPMENT OPERATOR: UTILITY: OFF SHIFT COMPRESSORS Footnote A below ENGI0014-001
07/01/2025
$71.98 $38.95 $110.93
POWER EQUIPMENT OPERATOR: UTILITY: UTILITY COMPRESSORS Footnote A below ENGI0014-001
07/01/2025
$57.14 $38.95 $96.09
ROOFER ROOF0008-003
05/01/2025
$50.25 $32.62 $82.87
SHEET METAL WORKER (BUILDING CONSTRUCTION) SHEE0028-002
11/02/2023
$53.60 $60.74 $114.34
SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) SHEE0028-002
11/02/2023
$35.79 $25.37 $61.16
TERRAZZO FINISHER BRNY0007-001
12/02/2024
$49.59 $34.25 $83.84
TERRAZZO WORKER/SETTER BRNY0007-001
12/02/2024
$64.62 $37.63 $102.25
TILE FINISHER BRNY0007-002
12/02/2024
$49.59 $34.25 $83.84
TILE LAYER BRNY0052-001
06/03/2024
$64.40 $37.13 $101.53
TRUCK DRIVER EUCLIDS & TURNAPULLS Footnote NOTE below TEAM0282-001
07/01/2025
$49.38 $57.65 $107.03
TRUCK DRIVER: ASPHALT Footnote NOTE below TEAM0282-001
07/01/2025
$46.12 $59.65 $105.77
TRUCK DRIVER: HIGH RISE Footnote NOTE below TEAM0282-001
07/01/2025
$65.43 $53.15 $118.58
Footnotes in NY20260003 (11)
  • BOIL0005-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE
  • ELEC0003-001 A: NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY
  • ELEV0001-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.
  • ELEV0001-002 B: PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED
  • ENGI0014-001 A: PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
  • ENGI0014-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
  • ENGI0015-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
  • ENGI0015-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
  • LABO0731-001 NOTE: PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY
  • LABO1010-001 A: PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS
  • TEAM0282-001 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK

2 of 2: WD NY20260001, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 7 classifications Covers 62 counties Types: Heavy Source: SAM.gov

Scope as published: All dredging, except self propelled hopper dredging, on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean

Davis-Bacon rates in NY20260001 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TU...DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$48.48 $15.34 $63.82
DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED M...DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$43.20 $14.99 $58.19
DREDGING: CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, ...DREDGING: CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$41.93 $14.90 $56.83
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF ...DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$39.46 $14.73 $54.19
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 ...DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$38.38 $14.66 $53.04
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOW...DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$37.15 $14.57 $51.72
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVE...DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55
Footnote A, B below
ENGI0025-001
10/01/2025
$30.86 $14.15 $45.01
Footnotes in NY20260001 (2)
  • ENGI0025-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY
  • ENGI0025-001 B: VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED

Questions about these rates

What is the Davis-Bacon rate for electricians on heavy work in Bronx County?
On WD NY20260003 Mod 6, published August 13, 2026, the row "ELECTRICIAN" is $62.00 base plus $65.81 fringe, $127.81 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on heavy work in Bronx County?
On WD NY20260003 Mod 6, published August 13, 2026, the row "PLUMBER" is $73.00 base plus $32.81 fringe, $105.81 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Bronx County?
On WD NY20260003 Mod 6, published August 13, 2026, the row "CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY)" is $61.59 base plus $55.84 fringe, $117.43 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NY20260003

Other counties: all New York counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.