Davis-Bacon wage rates · New York
Cattaraugus County highway construction wage rates
Federal prevailing wage rates for highway construction in Cattaraugus County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NY20260008
- Modification
- 3
- Published
- July 30, 2026
- Classifications
- 106
- Other types here
- Building, Residential, Heavy
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.
WD NY20260008, Mod 3
Make a WH-347 with these ratesScope as published: Heavy Construction · Highway Construction
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDE APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | ASBE0004-001 05/01/2025 | $37.65 | $30.69 | $68.34 |
| BOILERMAKER | BOIL0007-001 01/01/2025 | $39.35 | $33.18 | $72.53 |
| BRICKLAYER, STONEMASON (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA)) | BRNY0045-001 07/01/2024 | $37.44 | $32.71 | $70.15 |
| CABLE SPLICER (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY)) | ELEC0106-002 01/01/2014 | $35.75 | $20.68 | $56.43 |
| CABLE SPLICER (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSHIRE TOWNSHIPS)) | ELEC0041-007 04/01/2014 | $36.73 | $23.39 | $60.12 |
| CARPENTER, HEAVY & HIGHWAY (CATTARAUGUS (TOWNSHIPS OF PERSIA AND PERRYSBURG)) Footnote A below | CARP0276-021 07/01/2024 | $38.18 | $26.11 | $64.29 |
| CARPENTER, HEAVY & HIGHWAY (ERIE (GRAND ISLAND)) Footnote A below | CARP0276-013 07/01/2024 | $41.19 | $31.55 | $72.74 |
| CARPENTERS: (CHAUTAUQUA; CATTARAUGUS (REMAINDER OF COUNTY) Footnote A below | CARP0276-002 07/01/2024 | $38.18 | $26.11 | $64.29 |
| CEMENT FINISHER | PLAS0111-001 07/01/2025 | $33.65 | $31.47 | $65.12 |
| CEMENT MASON (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA)) | BRNY0045-001 07/01/2023 | $36.82 | $31.33 | $68.15 |
| CEMENT MASON/CONCRETE FINISHER (CHATAUQUA COUNTY AND CATTARAUGUS COUNTY (EXCLUDING TWNSP OF PERRYSBURG)) | BRNY0008-004 07/01/2024 | $38.63 | $25.05 | $63.68 |
| COMMUNICATIONS SYSTEM (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS)) | ELEC0041-008 05/26/2025 | $14.20 | $14.02 | $28.22 |
| COMMUNICATIONS SYSTEM, INSTALLER (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS)) | ELEC0041-008 05/26/2025 | $22.90 | $21.38 | $44.28 |
COMMUNICATIONS SYSTEM, MASTER TECHNICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AN...COMMUNICATIONS SYSTEM, MASTER TECHNICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS)) | ELEC0041-008 05/26/2025 | $44.50 | $36.05 | $80.55 |
| COMMUNICATIONS SYSTEM, SOUND WIREMAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS)) | ELEC0041-008 05/26/2025 | $44.50 | $36.05 | $80.55 |
| ELECTRICIAN (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY)) | ELEC0106-002 01/01/2024 | $42.50 | $27.23 | $69.73 |
| ELECTRICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSHIRE TOWNSHIPS)) | ELEC0041-007 05/26/2025 | $44.50 | $36.06 | $80.56 |
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OP...ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES: LINEMAN AND TECHNICIAN | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER Footnote A below | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUD...ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $40.81 | $6.99 | $47.80 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $20.53 | $6.39 | $26.92 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $38.73 | $6.93 | $45.66 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN Footnote A below | ELEC1249-003 05/05/2025 | $31.72 | $29.87 | $61.59 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) | ELEC1249-003 05/05/2025 | $42.29 | $30.66 | $72.95 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) | ELEC1249-003 05/05/2025 | $47.57 | $31.03 | $78.60 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN | ELEC1249-003 05/05/2025 | $52.86 | $35.60 | $88.46 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC Footnote A below | ELEC1249-003 05/05/2025 | $42.29 | $30.66 | $72.95 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | ELEC1249-004 05/05/2025 | $63.14 | $33.82 | $96.96 |
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable inst...ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $64.59 | $42.92 | $107.51 |
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wir...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installati...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber o...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work includ...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit...ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wi...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installat...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0014-001 01/01/2025 | $62.39 | $38.44 | $100.83 |
| GLAZIER | PAIN0004-007 05/01/2025 | $34.68 | $27.64 | $62.32 |
| HAZARDOUS MATERIAL HANDLER | ASBE0004-001 05/01/2021 | $34.15 | $26.09 | $60.24 |
| IRONWORKER | IRON0006-015 07/01/2024 | $35.49 | $32.30 | $67.79 |
| IRONWORKER (FENCE ERECTORS) | IRON0006-003 07/01/2024 | $34.06 | $30.80 | $64.86 |
| IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING STEEL, WELDERS, RIGGERS AND RODMAN) | IRON0006-003 07/01/2024 | $35.49 | $32.30 | $67.79 |
| IRONWORKER (WINDOW ERECTORS) | IRON0006-003 07/01/2024 | $33.14 | $32.30 | $65.44 |
| IRONWORKER: SHEETER | IRON0006-015 07/01/2024 | $35.49 | $32.30 | $67.79 |
LABORER GROUP 1 LABORERS; FLAGMEN; OUTBOARD AND HAND BOATS; DEMOLITION WORKER; IBC BARRIERS (EXCEPT ON STRUCTURES); GUARD RAILS;ROAD MARKERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: A...LABORER GROUP 1 LABORERS; FLAGMEN; OUTBOARD AND HAND BOATS; DEMOLITION WORKER; IBC BARRIERS (EXCEPT ON STRUCTURES); GUARD RAILS;ROAD MARKERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $34.66 | $28.65 | $63.31 |
| LABORER GROUP 1: GENERAL; FLAGMAN; TOP MAN; WRECKERS (ERIE COUNTY SEWER/WATER) | LABO0210-003 07/01/2023 | $34.66 | $28.65 | $63.31 |
LABORER GROUP 1: MOLE NIPPER; POWDER HANDLER; TOP LABORER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED ...LABORER GROUP 1: MOLE NIPPER; POWDER HANDLER; TOP LABORER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $36.16 | $28.65 | $64.81 |
LABORER GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MES...LABORER GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPER; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP (2" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS; LASER MAN (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $34.86 | $28.65 | $63.51 |
LABORER GROUP 2: AIR SPADE; JACKHAMMER; PAVEMENT BREAKER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED T...LABORER GROUP 2: AIR SPADE; JACKHAMMER; PAVEMENT BREAKER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $36.31 | $28.65 | $64.96 |
| LABORER GROUP 2: FOUNDATION; ROD CARRIERS; PLASTER TENDER; SCAFFOLD BOOTMAN; PNEUMATIC, GAS, ELECTRIC TOOL OPERATOR; JACKHAMMER; CHIPPING GUNS (ERIE COUNTY SEWER/WATER) | LABO0210-003 07/01/2023 | $34.76 | $28.65 | $63.41 |
LABORER GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; WELDER (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHW...LABORER GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; WELDER (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $35.06 | $28.65 | $63.71 |
| LABORER GROUP 3: MORTAR MIXER OVER 8 FEET IN DEPTH (ERIE COUNTY SEWER/WATER) | LABO0210-003 07/01/2023 | $34.81 | $28.65 | $63.46 |
| LABORER GROUP 3: TOP BELL (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $36.41 | $28.65 | $65.06 |
LABORER GROUP 4 BLASTERS; CURB & FLAT WORK FORM SETTERS (EXCEPT ON STRUCTURES); STONE OR GRANITE CURB SETTERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE R...LABORER GROUP 4 BLASTERS; CURB & FLAT WORK FORM SETTERS (EXCEPT ON STRUCTURES); STONE OR GRANITE CURB SETTERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $35.26 | $28.65 | $63.91 |
LABORER GROUP 4: BOTTOM BELL; SIDE OR ROOFBELT DRILLER; BURNERS; TRACKMEN; NIPPERS; DERAILMEN; HOSEMEN; GROUTMEN; GRAVELMEN; FORM WORKERS; MOVERS & SHAFTMEN; CONVEYORMEN (ERIE COUNTY TUNNEL) FOR HEAVY...LABORER GROUP 4: BOTTOM BELL; SIDE OR ROOFBELT DRILLER; BURNERS; TRACKMEN; NIPPERS; DERAILMEN; HOSEMEN; GROUTMEN; GRAVELMEN; FORM WORKERS; MOVERS & SHAFTMEN; CONVEYORMEN (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $36.91 | $28.65 | $65.56 |
| LABORER GROUP 4: PAVEMENT FORMSETTER; STEELBURNER; CAISSON; WAGON DRILL OPERATOR; PIPELAYER; SWING SCAFFOLD (ERIE COUNTY SEWER/WATER) | LABO0210-003 07/01/2023 | $34.91 | $28.65 | $63.56 |
| LABORER GROUP 5: POWDER MONKEY (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $37.01 | $28.65 | $65.66 |
| LABORER GROUP 5: UTILITY PAVE DRIVER; LASER OPERATOR (ERIE COUNTY SEWER/WATER) | LABO0210-003 07/01/2023 | $35.26 | $28.65 | $63.91 |
| LABORER GROUP 6: BLASTER (ERIE COUNTY SEWER/WATER) | LABO0210-003 07/01/2023 | $35.66 | $28.65 | $64.31 |
LABORER GROUP 6: BLASTERS; IRONMEN; WELDER; HEADING DRILLER (ERIE COUNTY TUNNEL FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED...LABORER GROUP 6: BLASTERS; IRONMEN; WELDER; HEADING DRILLER (ERIE COUNTY TUNNEL FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK | LABO0210-003 07/01/2023 | $37.41 | $28.65 | $66.06 |
| LABORER GROUP 7: PILEDRIVER; RIGGER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK. | LABO0210-003 07/01/2023 | $37.66 | $28.65 | $66.31 |
| LABORERS: HEAVY AND HIGHWAY (ZONE I) GROUP 1 | LABO0621-001 07/01/2025 | $33.93 | $28.69 | $62.62 |
| LABORERS: HEAVY AND HIGHWAY (ZONE I) GROUP 2 | LABO0621-001 07/01/2025 | $34.33 | $28.69 | $63.02 |
LABORERS: HEAVY AND HIGHWAY GROUP 2: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS (NOT TO INCLUDE COLD PATCH), TAIL OR SCREW OPERATOR ON ASPHALT PAVER. ALL ROCK OR ...LABORERS: HEAVY AND HIGHWAY GROUP 2: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS (NOT TO INCLUDE COLD PATCH), TAIL OR SCREW OPERATOR ON ASPHALT PAVER. ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, POWDERMAN. (CATTARAUGUS COUNTY AND CHAUTAUQUA COUNTY (REMAINING TOWNSHIPS)) | LABO0621-002 07/01/2025 | $34.33 | $28.69 | $63.02 |
LABORERS: HEAVY AND HIGHWAYGROUP 1: FLAGMAN, OUTBOARD AND HAND BOATS, BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOT, GIN BUGGY, HAND OR MACHINE VIBRATOR JACK HAMMER, MASON TENDER, MORTA...LABORERS: HEAVY AND HIGHWAYGROUP 1: FLAGMAN, OUTBOARD AND HAND BOATS, BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOT, GIN BUGGY, HAND OR MACHINE VIBRATOR JACK HAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLER OF ALL STEEL MESH, SMALL GENERATOR FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPE LAYERS, VIBRATOR TYPE ROLLERS, TAMPER DRILL DOCTOR, WATER PUMP OPERATOR (1 1/2" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNITE, SEEDING AND SANDBLASTING) LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS. (CATTARAUGUS COUNTY AND CHAUTAUQUA COUNTY (REMAINING TOWNSHIPS)) | LABO0621-002 07/01/2025 | $33.93 | $28.69 | $62.62 |
| MARBLE SETTER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA)) | BRNY0045-001 07/01/2020 | $31.72 | $29.18 | $60.90 |
| PAINTERS: BRIDGE PAINTER (HEAVY & HIGHWAY CONSTRUCTION) | PAIN0004-004 05/01/2023 | $42.06 | $30.59 | $72.65 |
PAINTERS: BRIDGES (CATTARAUGUS COUNTY - Townships of Leon, Conewango, Randolph, South Valley, Napoli and New Albion; CHAUTAUQUA COUNTY - Townships of French Creek, Mina, Ripley, Westfield, Sherman, Cl...PAINTERS: BRIDGES (CATTARAUGUS COUNTY - Townships of Leon, Conewango, Randolph, South Valley, Napoli and New Albion; CHAUTAUQUA COUNTY - Townships of French Creek, Mina, Ripley, Westfield, Sherman, Clymer, Chautauqua, North Harmony, Harmony, Busti, Ellery, Stockton, Charlotte, Gerry, Ellicott, Jamestown, Kiantone, Carroll, Poland, Ellington and Cherry Creek.) | PAIN0004-008 05/01/2023 | $42.06 | $30.59 | $72.65 |
PAINTERS: BRIDGES (CATTARAUGUS COUNTY (Townships of Cold Spring, Elko, Mansfield, Little Valley, Salamanca Indian Reservation, Red House, Ellicottville, Great Valley, Carrolton, Franklinville, Humphre...PAINTERS: BRIDGES (CATTARAUGUS COUNTY (Townships of Cold Spring, Elko, Mansfield, Little Valley, Salamanca Indian Reservation, Red House, Ellicottville, Great Valley, Carrolton, Franklinville, Humphrey, Allegany, Freedom, Farmersville, Lyndon, Ishua, Hinsdale, Olean and Portville)) | PAIN0004-017 05/01/2023 | $42.06 | $30.59 | $72.65 |
| PAINTERS: CATTARAUGUS, CHAUTAUQUA & ERIE COUNTIES | PAIN0004-001 05/01/2019 | $38.50 | $28.40 | $66.90 |
| PAINTERS:, BUILDING CONSTRUCTION: BRUSH AND ROLLER (ERIE COUNTY) | PAIN0004-001 05/01/2025 | $33.00 | $28.21 | $61.21 |
| PAINTERS:, BUILDING CONSTRUCTION: DRYWALL/TAPING (ERIE COUNTY) | PAIN0004-001 05/01/2025 | $34.00 | $28.51 | $62.51 |
| PAINTERS:, BUILDING CONSTRUCTION: WALLCOVERING (ERIE COUNTY) | PAIN0004-001 05/01/2025 | $33.00 | $28.21 | $61.21 |
| PLASTERER | PLAS0009-001 04/01/2025 | $33.05 | $25.09 | $58.14 |
| PLUMBER/PIPEFITTER: (ZONE 1) | PLUM0022-001 04/29/2024 | $42.20 | $29.80 | $72.00 |
| PLUMBER/PIPEFITTER: (ZONE 2) | PLUM0022-004 04/29/2024 | $42.20 | $29.80 | $72.00 |
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC FINE GRADE MACHINE (C...POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC FINE GRADE MACHINE (CMI AND SIMILAR TYPE), ARCHER HOIST, BACKHOE AND PULL HOE (TRACTOR MOUNTED AND RUBBER MOUNTED), BACK FILLING MACHINE, BELT PLACE (CMI AND SIMILAR), BENDING MACHINE (PIPE), BITUMINOUS SPREADER AND MIXER, BLACK TOP PLANT (AUTOMATED), BLACK TOP PLANT (NON-AUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACK MOUNTED), BLOWER FOR BURNING BRUSH, BOILER (WHEN USED FOR POWER), BOOM TRUCKS, BORING MACHINE, BULLDOZER, CABLEWAY CAGE HOIST, CAISSON AUGER, CENTRAL MIX PLANT (AND ALL CONCRETE BATCHING PLANTS), CHERRY PICKER (OVER 5 TONS), CHERRY PICKER (UNDER 5 TONS), CHIPPING MACHINE AND CHIP SPREADER, CONCRETE CURB AND GUTTER MACHINES, CONCRETE CURING MACHINE, CONCRETE MIXER (OVER 1/2 CU. YD.) CONCRETE PAVEMENT SPREADERS AND FINISHERS, CONCRETE PAVER, CONCRETE PUMP, CONCRETE SAW (SELF-PROPELLED), CONVEYOR, CORE DRILL, CRANE, CRUSHER, DERRICK OPERATOR, DRAGLINE, DREDGE, DRILL RIG (TRACTOR MOUNTED), DUAL DRUM PAVER, ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS, ELEVATING GRADER SELF- PROPELLED OR TOWED), ELEVATOR EXCAVATOR (ALL PURPOSE, HYDRAULCALLY OPERATED) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, FORKLIFT, FRONT END LOADER, GENERATOR (10 OUTLETS OR MORE), GRADALL, GRADER, GROUT OR GUNITE MACHINE, HEAD TOWER, HOIST-ONE DRUM, HOISTING ENGINE, HYDRAULIC BOOM, HYDRAULIC HAMMER, (SELF PROPELLED), HYDRAULIC PIPE JACK MACHINE (OR SIMILAR TYPE MACHINE), HYDRAULIC SYSTEM PUMPS, HYDRO CRANE, HYDRO HAMMER (OR SIMILAR TYPE), INDUSTRIAL TRACTOR, JERSEY SPREADER, KOLMAN PLANT LOADER (AND SIMILAR TYPE LOADERS), LOCOMOTIVE, LUBRICATION TRUCK, MAINTENANCE ENGINEER, MAINTENANCE LUBRICATION UNIT OR TRUCK, MINE HOIST, MIXR FOR STABILIZED BASE (SELF-PROPELLED), MONORAIL, MOTORIZED HYDRAULIC PIN PULLER, MOTORIZED HYDRAULIC SEEDER MUCKING MACHINE, MULCHING MACHINE, MULTIPLE DRUM HOIST (MORE THAN 1 DRUM IN USE), OVERHEAD CRANE, PEINE CRANE (OR SIMILAR TYPE), PILE DRIVER, PLANT ENGINEER, PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE), ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER, SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP CHIPPING MACHINE, TIRE TRUCK AND REPAIR, TOWED ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER, TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES, TRACTORS (WHEN USING WINCH POWER), TRACTORS, TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER (CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH, WINCH TRUCK WITH "A" FRAME. NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 | ENGI0017-012 07/01/2025 | $47.39 | $36.89 | $84.28 |
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY SIZE, BUT SUBJECT TO...POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS, DUST COLLECTORS, GENERATORS, MECHANICAL HEATERS, PUMPS, WELDING MACHINES (FOUR OF ANY TYPE OR COMBINATION), CONCRETE MIXER (1/2 CU. YD. AND UNDER), FIREMAN, FORM TAMPER, FUEL TRUCK, HEATING BOILER (USED FOR TEMPRORY HEAT), JEEP TRENCHER, POWER HEATERMAN, POWER PLANT IN EXCESS OF 10 K.W., PUMP (4" OR OVER), REVINIUS WIDENER, STEM CLEANER, STUMP CHIPPING MACHINE, WELDING MACHINE (1 MACHINE OVER 300 AMPS OR 2 OR 3 MACHINES REGARDLESS OF AMPS). NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 | ENGI0017-012 07/01/2025 | $42.89 | $36.89 | $79.78 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 Footnote A below | ENGI0017-012 07/01/2025 | $50.64 | $36.89 | $87.53 |
| POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 Footnote A below | ENGI0017-012 07/01/2025 | $51.64 | $36.89 | $88.53 |
| POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 Footnote A below | ENGI0017-012 07/01/2025 | $52.14 | $36.89 | $89.03 |
| POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS & OVER NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 Footnote A below | ENGI0017-012 07/01/2025 | $52.64 | $36.89 | $89.53 |
| POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 Footnote A below | ENGI0017-012 07/01/2025 | $48.46 | $36.89 | $85.35 |
| ROOFER | ROOF0210-005 06/01/2010 | $23.65 | $11.99 | $35.64 |
| ROOFERS: COMPOSITION (ERIE COUNTY) | ROOF0074-001 06/01/2024 | $34.96 | $26.03 | $60.99 |
| ROOFERS: SLATE & TILE (ERIE COUNTY) | ROOF0074-001 06/01/2024 | $35.11 | $26.03 | $61.14 |
| SHEET METAL WORKER (CATTARAUGUS AND CHAUTAUQUA COUNTIES:) | SHEE0112-001 07/01/2023 | $31.00 | $24.56 | $55.56 |
| SHEET METAL WORKER (ERIE COUNTY) | SHEE0071-001 05/27/2024 | $39.50 | $29.18 | $68.68 |
| SPRINKLER FITTER | SFNY0669-001 01/01/2026 | $47.85 | $28.94 | $76.79 |
| STEAMFITTER: (ZONE 1) | PLUM0022-001 04/29/2024 | $42.20 | $29.80 | $72.00 |
| TERRAZZO FINISHER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA)) | BRNY0045-001 07/01/2024 | $34.71 | $17.54 | $52.25 |
| TILE FINISHER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA)) | BRNY0045-001 07/01/2024 | $34.71 | $17.54 | $52.25 |
| TILESETTER & TERRAZZO WORKER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA)) | BRNY0045-001 07/01/2015 | $31.21 | $20.54 | $51.75 |
TRUCK DRIVERS: GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE-AXLE DUMP TRUCKS, DUMPSTERS, TANDEMS, BATCH TRUCKS, MECHANICS SEMI TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTR...TRUCK DRIVERS: GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE-AXLE DUMP TRUCKS, DUMPSTERS, TANDEMS, BATCH TRUCKS, MECHANICS SEMI TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANICS, FUEL TRUCKS. (CATTARAUGUS AND CHAUTAUQUA COUNTIES) | TEAM0264-001 07/01/2025 | $49.66 | $16.82 | $66.48 |
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY TANDEM...TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY TANDEM BACK-DUMP, TWIN ENGINE EQUIPENT AND DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED. (CATTARAUGUS AND CHAUTAUQUA COUNTIES) | TEAM0264-001 07/01/2025 | $49.66 | $16.82 | $66.48 |
| TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR Footnote A, B below | TEAM0449-002 07/01/2025 | $49.23 | $8.75 | $57.98 |
| TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS Footnote A below | TEAM0449-005 06/01/2025 | $32.00 | $0.00 | $32.00 |
Footnotes in NY20260008 (12)
- CARP0276-002 A: PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS
- CARP0276-013 A: PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS
- CARP0276-021 A: PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS
- ELEC1249-003 A: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
- ELEC1249-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
- ELEV0014-001 A: VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
- ELEV0014-001 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
- ENGI0017-012 A: PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY
- TEAM0264-001 A: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TRUCK DRIVER CLASSIFICATIONS
- TEAM0449-002 A: PENSION $56.20 PER DAY
- TEAM0449-002 B: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY
- TEAM0449-005 A: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY
Questions about these rates
What is the Davis-Bacon rate for electricians on highway work in Cattaraugus County?
What is the Davis-Bacon rate for plumbers on highway work in Cattaraugus County?
What is the Davis-Bacon rate for carpenters on highway work in Cattaraugus County?
Which wage determination applies to my project?
What counts as highway construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NY20260008
Other counties: all New York counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.