Davis-Bacon wage rates · New York
Delaware County highway construction wage rates
Federal prevailing wage rates for highway construction in Delaware County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NY20260021
- Modification
- 2
- Published
- July 30, 2026
- Classifications
- 82
- Other types here
- Building, Residential, Heavy
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.
WD NY20260021, Mod 2
Make a WH-347 with these ratesScope as published: Heavy Construction · Highway Construction
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.) | ASBE0040-001 05/01/2025 | $41.74 | $27.58 | $69.32 |
| BOILERMAKER | BOIL0197-001 01/01/2025 | $43.34 | $27.66 | $71.00 |
CABLE SPLICER (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH...CABLE SPLICER (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH OF THE DELAWARE RIVER.) | ELEC0325-003 06/01/2025 | $50.43 | $33.29 | $83.72 |
| CARPENTER | CARP0277-018 07/01/2025 | $39.52 | $27.16 | $66.68 |
| CEMENT MASON (BINGHAMTON CHAPTER) | BRNY0003-017 07/01/2025 | $38.63 | $25.05 | $63.68 |
| ELECTRICIAN (DELAWARE COUNTY (PORTION OF)) Footnote A below | ELEC0363-005 04/01/2024 | $46.50 | $40.57 | $87.07 |
ELECTRICIAN (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH O...ELECTRICIAN (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH OF THE DELAWARE RIVER.) | ELEC0325-003 06/01/2025 | $42.68 | $33.06 | $75.74 |
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OP...ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES: LINEMAN AND TECHNICIAN | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER Footnote A below | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUD...ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $40.81 | $6.99 | $47.80 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $20.53 | $6.39 | $26.92 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $38.73 | $6.93 | $45.66 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN Footnote A below | ELEC1249-003 05/05/2025 | $31.72 | $29.87 | $61.59 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) | ELEC1249-003 05/05/2025 | $42.29 | $30.66 | $72.95 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) | ELEC1249-003 05/05/2025 | $47.57 | $31.03 | $78.60 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN | ELEC1249-003 05/05/2025 | $52.86 | $35.60 | $88.46 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC Footnote A below | ELEC1249-003 05/05/2025 | $42.29 | $30.66 | $72.95 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | ELEC1249-004 05/05/2025 | $63.14 | $33.82 | $96.96 |
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable inst...ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $64.59 | $42.92 | $107.51 |
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wir...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installati...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber o...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work includ...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit...ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wi...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installat...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| GLAZIER | PAIN0677-003 05/01/2025 | $30.00 | $31.95 | $61.95 |
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FR...HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | ASBE0040-001 05/01/2025 | $41.74 | $27.58 | $69.32 |
| IRONWORKERS: (SHEETER) | IRON0012-001 07/01/2024 | $38.75 | $25.48 | $64.23 |
| IRONWORKERS: (STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN) | IRON0012-001 07/01/2024 | $38.50 | $25.48 | $63.98 |
LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER ...LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, SCAFFOLD, BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER, PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENENCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPELINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TARACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLEMAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO- REMEDIATION, LEAD OR HAZARDOUS MATERAILS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINIGN WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CAATCH BASIN OR INLET INSTALLING, LASER MEN. GROUND MAN ON MILLING MACHINE. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD) | LABO0017-004 06/01/2023 | $44.80 | $32.45 | $77.25 |
LABORERS: HEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND, HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERI...LABORERS: HEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND, HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD) | LABO0017-004 06/01/2023 | $49.40 | $32.45 | $81.85 |
| LABORERS: HEAVY & HIGHWAY: GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD) Footnote A below | LABO0017-004 06/01/2023 | $54.70 | $32.45 | $87.15 |
| LABORERS: HEAVY & HIGHWAY: GROUP 1: | LABO0017-004 06/01/2023 | $40.80 | $32.45 | $73.25 |
| LABORERS: HEAVY AND HIGHWAY GROUP 1 | LABO0785-014 07/01/2024 | $35.56 | $25.60 | $61.16 |
LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HAND...LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2'AND SINGLE DIAPHRAM), NOZZLER (ASPHALT GUNNITE, SEEDING AND SNADBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) | LABO0785-014 07/01/2024 | $35.76 | $25.60 | $61.36 |
LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN (TOWNSHIPS OF SIDNEY, MASONVIL...LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) | LABO0785-014 07/01/2024 | $35.96 | $25.60 | $61.56 |
| LABORERS: HEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) Footnote A below | LABO0785-014 07/01/2024 | $36.16 | $25.60 | $61.76 |
| LABORERS: HEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE REMOVAL (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) Footnote A below | LABO0785-014 07/01/2024 | $38.76 | $25.60 | $64.36 |
| PAINTERS: (BRIDGES) | PAIN0004-006 05/01/2023 | $42.06 | $30.59 | $72.65 |
| PLUMBER (ZONE 2 MIDDLETOWN AND ROXBERRY TOWNSHIPS) | PLUM0021-004 05/01/2025 | $60.66 | $45.35 | $106.01 |
| PLUMBER AND STEAMFITTER: SOUTHERN ZONE (REMAINDER OF COUNTY) | PLUM0112-001 05/01/2024 | $42.63 | $32.24 | $74.87 |
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1 AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SL...POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1 AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES, INCLUDING OVERHEAD AN STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS, FRONT END LOADERS (5 YDS. AND OVER), GRADALLS, GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS, (COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE), MUCKING MACHINES,PAVEMENT AND CONCRETE BREAKER (SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE APPLICABLE), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMIUM RATE APPLICABLE), ROADWAY SURFACE GRINDER SCOOPER (LOADER AND SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH MACHINES, TUNNEL BORING MACHINES. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 | ENGI0825-014 07/01/2025 | $61.72 | $37.50 | $99.22 |
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI ...POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (AIROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GREADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 | ENGI0825-014 07/01/2025 | $58.22 | $37.50 | $95.72 |
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDI...POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 | ENGI0825-014 07/01/2025 | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 Footnote A below | ENGI0825-014 07/01/2025 | $52.88 | $37.50 | $90.38 |
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), H...POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $62.35 | $37.50 | $99.85 |
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH...POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $60.70 | $37.50 | $98.20 |
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS ...POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $58.56 | $37.50 | $96.06 |
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OV...POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $57.10 | $37.50 | $94.60 |
| POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 Footnote A below | ENGI0825-015 07/01/2025 | $53.34 | $37.50 | $90.84 |
| POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 Footnote A below | ENGI0825-015 07/01/2025 | $64.28 | $37.50 | $101.78 |
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, ...POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $61.29 | $37.50 | $98.79 |
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOO...POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $70.24 | $37.50 | $107.74 |
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOO...POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $68.58 | $37.50 | $106.08 |
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLI...POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $58.63 | $37.50 | $96.13 |
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); ...POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 | ENGI0825-015 07/01/2025 | $57.10 | $37.50 | $94.60 |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 Footnote A below | ENGI0825-015 07/01/2025 | $53.34 | $37.50 | $90.84 |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 7 HELICOPTER PILOT. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 Footnote A below | ENGI0825-015 07/01/2025 | $65.74 | $37.50 | $103.24 |
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20%...POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 | ENGI0825-015 07/01/2025 | $69.96 | $37.50 | $107.46 |
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL PREM...POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 | ENGI0825-015 07/01/2025 | $68.37 | $37.50 | $105.87 |
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWE...POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 | ENGI0825-015 07/01/2025 | $61.28 | $37.50 | $98.78 |
| POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 5: OILER NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 Footnote A below | ENGI0825-015 07/01/2025 | $54.07 | $37.50 | $91.57 |
| POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTERS PILOT NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 Footnote A below | ENGI0825-014 07/01/2025 | $63.54 | $37.50 | $101.04 |
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEH...POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST") HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; "STRADDLE" CARRIER, ROSE AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING).. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM $0.50 | ENGI0825-014 07/01/2025 | $60.13 | $37.50 | $97.63 |
| POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 Footnote A below | ENGI0825-015 07/01/2025 | $64.85 | $37.50 | $102.35 |
| ROOFER | ROOF0203-001 06/01/2023 | $30.50 | $19.84 | $50.34 |
| SHEET METAL WORKER | SHEE0112-004 05/01/2023 | $35.94 | $20.89 | $56.83 |
| TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN Footnote A below | TEAM0317-010 07/01/2025 | $37.27 | $29.29 | $66.56 |
| TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 2 TANDEMS; BATCH TRUCKS; MECHANIC Footnote A below | TEAM0317-010 07/01/2025 | $37.27 | $29.29 | $66.56 |
| TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK Footnote A below | TEAM0317-010 07/01/2025 | $37.27 | $29.29 | $66.56 |
| TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNIT Footnote A below | TEAM0317-010 07/01/2025 | $37.47 | $29.29 | $66.76 |
| TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED Footnote A below | TEAM0317-010 07/01/2025 | $37.47 | $29.29 | $66.76 |
Footnotes in NY20260021 (8)
- ELEC0363-005 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
- ELEC1249-003 A: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
- ELEC1249-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
- ENGI0825-014 A: PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS
- ENGI0825-015 A: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS
- LABO0017-004 A: PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS
- LABO0785-014 A: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY
- TEAM0317-010 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
Questions about these rates
What is the Davis-Bacon rate for electricians on highway work in Delaware County?
What is the Davis-Bacon rate for plumbers on highway work in Delaware County?
What is the Davis-Bacon rate for carpenters on highway work in Delaware County?
Which wage determination applies to my project?
What counts as highway construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NY20260021
Other counties: all New York counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.