Davis-Bacon wage rates · New York

Dutchess County highway construction wage rates

Federal prevailing wage rates for highway construction in Dutchess County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NY20260007
Modification
2
Published
May 18, 2026
Classifications
142
Other types here
Building, Residential, Heavy

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.

WD NY20260007, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 142 classifications Covers 4 counties Types: Building, Heavy, Highway Source: SAM.gov

Scope as published: Excludes building construction in Sullivan County

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in NY20260007 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BOILERMAKER Footnote A below BOIL0005-001
01/01/2025
$68.88 $49.83 $118.71
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) BRNY0005-001
06/01/2024
$46.45 $37.50 $83.95
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO)) BRNY0005-001
06/01/2024
$47.44 $38.00 $85.44
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) BRNY0005-001
06/01/2024
$46.45 $37.50 $83.95
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO)) BRNY0005-001
06/01/2024
$47.44 $38.00 $85.44
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) BRNY0005-001
06/01/2024
$46.45 $37.50 $83.95
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (BUILDING CONSTRUCTION) CARP0279-005
07/01/2025
$44.72 $31.23 $75.95
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY & HIGHWAY CONSTRUCTION) CARP0279-005
07/01/2025
$44.72 $31.23 $75.95
DIVER (DUTCHESS AND ORANGE COUNTIES) CARP1556-005
07/01/2024
$75.46 $55.84 $131.30
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES) CARP1556-005
07/01/2024
$55.00 $55.84 $110.84
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE COUNTIES) CARP1556-005
07/01/2024
$60.59 $55.84 $116.43
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES) Footnote A below ELEC0363-001
04/01/2025
$51.50 $42.22 $93.72
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES) Footnote A below ELEC0363-001
04/01/2025
$51.50 $42.22 $93.72
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OP...ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES: LINEMAN AND TECHNICIAN
Footnote A below
ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER Footnote A below ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUD...ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
Footnote A below
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$40.81 $6.99 $47.80
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$20.53 $6.39 $26.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$38.73 $6.93 $45.66
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: FLAG...ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: FLAGMAN (SULLIVAN COUNTY)
Footnote A below
ELEC1249-005
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROU...ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN (DIGGING MACHINE OPERATOR) (SULLIVAN COUNTY)
Footnote A below
ELEC1249-005
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROU...ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN (TRUCK DRIVER) (SULLIVAN COUNTY)
Footnote A below
ELEC1249-005
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROU...ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (SULLIVAN COUNTY)
Footnote A below
ELEC1249-005
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: LINE...ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: LINEMAN & TECHNICIAN (SULLIVAN COUNTY)
Footnote A below
ELEC1249-005
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: MECH...ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: MECHANIC (SULLIVAN COUNTY)
Footnote A below
ELEC1249-005
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN Footnote A below ELEC1249-002
05/05/2025
$32.51 $29.93 $62.44
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR)
Footnote A below
ELEC1249-002
05/05/2025
$48.77 $31.31 $80.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER)
Footnote A below
ELEC1249-002
05/05/2025
$43.35 $30.73 $74.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
Footnote A below
ELEC1249-002
05/05/2025
$43.35 $30.73 $74.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN
Footnote A below
ELEC1249-002
05/05/2025
$54.19 $35.69 $89.88
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC Footnote A below ELEC1249-002
05/05/2025
$43.35 $30.73 $74.08
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) ELEC1249-004
05/05/2025
$63.14 $33.82 $96.96
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable inst...ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wir...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installati...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab
ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber o...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work includ...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit...ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins
ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wi...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installat...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELEVATOR MECHANIC Footnote A, B below ELEV0138-001
01/01/2026
$76.12 $38.98 $115.10
GLAZIER (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) PAIN0009-004
05/01/2025
$49.20 $57.20 $106.40
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FRO...HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)
ASBE0040-003
05/01/2025
$41.74 $27.58 $69.32
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FRO...HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE COUNTIES)
ASBE0091-002
06/02/2025
$46.62 $49.30 $95.92
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES) ASBE0040-003
05/01/2025
$41.74 $27.58 $69.32
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES) ASBE0091-002
06/02/2025
$46.62 $49.30 $95.92
IRONWORKER A) Footnote NOTE below IRON0417-001
07/01/2025
$42.63 $53.70 $96.33
LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 1 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Cust...LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 1 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side
LABO0017-002
06/01/2025
$45.40 $29.75 $75.15
LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 2 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Cust...LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 2 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side
LABO0017-002
06/01/2025
$46.20 $29.75 $75.95
LABORERS: GROUP 1 (BUILDING CONSTRUCTION) MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) LABO0235-003
06/01/2025
$41.10 $32.90 $74.00
LABORERS: GROUP 2 (BUILDING CONSTRUCTION) LABO0235-003
06/01/2025
$42.22 $32.90 $75.12
LABORERS: GROUP 3 (BUILDING CONSTRUCTION) BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) LABO0235-003
06/01/2025
$43.45 $32.90 $76.35
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDER...LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (DUTCHESS COUNTY)
Footnote A below
LABO0235-005
05/01/2023
$36.45 $27.80 $64.25
LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD ...LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (DUTCHESS COUNTY)
Footnote A below
LABO0235-005
05/01/2023
$42.80 $27.80 $70.60
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (DUTCHESS COUNTY) Footnote A below LABO0235-005
05/01/2023
$43.90 $27.80 $71.70
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES) CARP0740-002
07/01/2025
$47.83 $43.03 $90.86
PAINTER: STRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) PAIN0806-008
10/01/2024
$56.25 $55.14 $111.39
PAINTERS: (DRYWALL FINISHERS) PAIN0155-003
05/01/2021
$35.94 $24.66 $60.60
PAINTERS: (LEAD ABATEMENT WORK) PAIN0155-003
05/01/2021
$35.94 $24.66 $60.60
PAINTERS: (PAINTER/PAPERHANGER) PAIN0155-003
05/01/2021
$35.94 $24.66 $60.60
PAINTERS: (SPRAY RATE) PAIN0155-003
05/01/2021
$36.94 $24.66 $61.60
PLUMBER; STEAMFITTER (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, W...PLUMBER; STEAMFITTER (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK)
PLUM0373-002
05/01/2025
$53.20 $46.57 $99.77
PLUMBER; STEAMFITTER (SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, ...PLUMBER; STEAMFITTER (SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON))
PLUM0373-003
05/01/2025
$53.20 $46.57 $99.77
PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY) PLUM0021-005
05/01/2025
$60.66 $45.35 $106.01
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING M...POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST IS "OUTSIDE MATERIAL LOWER HOIST"; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-007
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGR...POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES. CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM BLASTING MACHINE OPERATOR (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-007
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGI...POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-007
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 5 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM.50 Footnote A below ENGI0825-007
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 6 HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM.50 Footnote A below ENGI0825-007
07/01/2025
$63.54 $37.50 $101.04
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 1 ENGI0825-007
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY) ENGI0158-018
07/01/2025
$57.30 $33.55 $90.85
POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$59.04 $31.32 $90.36
POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$54.41 $31.32 $85.73
POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BL...POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE))
Footnote A below
ENGI0158-018
07/01/2025
$56.39 $33.55 $89.94
POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$56.97 $31.32 $88.29
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK, ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON ...POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK, ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE))
Footnote A below
ENGI0158-018
07/01/2025
$53.82 $33.55 $87.37
POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$54.88 $31.32 $86.20
POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$52.25 $31.32 $83.57
POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) Footnote A below ENGI0158-018
07/01/2025
$63.30 $33.55 $96.85
POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$54.33 $31.32 $85.65
POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$45.94 $31.32 $77.26
POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$49.53 $31.32 $80.85
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) Footnote A below ENGI0158-018
07/01/2025
$61.80 $33.55 $95.35
POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$61.95 $31.32 $93.27
POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$47.00 $31.32 $78.32
POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) ENGI0137-001
03/04/2024
$49.26 $31.32 $80.58
POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) Footnote A below ENGI0158-018
07/01/2025
$60.30 $33.55 $93.85
POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) Footnote A below ENGI0158-018
07/01/2025
$58.91 $33.55 $92.46
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR ...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$68.63 $35.25 $103.88
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLAN...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$60.42 $35.25 $95.67
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM ...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$63.70 $35.25 $98.95
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; ...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$57.84 $35.25 $93.09
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$59.67 $35.25 $94.92
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$56.81 $35.25 $92.06
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$51.57 $35.25 $86.82
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - ...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$44.19 $35.25 $79.44
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OV...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$64.02 $35.25 $99.27
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFA...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$77.82 $35.25 $113.07
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PRE...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$75.13 $35.25 $110.38
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$70.41 $35.25 $105.66
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL O...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$59.19 $35.25 $94.44
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE...POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
Footnote A below
ENGI0137-007
03/04/2024
$64.02 $35.25 $99.27
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAG...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75
Footnote A below
ENGI0825-008
07/01/2025
$70.24 $37.50 $107.74
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAG...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75
Footnote A below
ENGI0825-008
07/01/2025
$68.58 $37.50 $106.08
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DO...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75
Footnote A below
ENGI0825-008
07/01/2025
$61.29 $37.50 $98.79
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PAR...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75
Footnote A below
ENGI0825-008
07/01/2025
$58.63 $37.50 $96.13
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75
Footnote A below
ENGI0825-008
07/01/2025
$57.10 $37.50 $94.60
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 6 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75 Footnote A below ENGI0825-008
07/01/2025
$53.34 $37.50 $90.84
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 7 HELICOPTER PILOT. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium.75 Footnote A below ENGI0825-008
07/01/2025
$65.74 $37.50 $103.24
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (ORANGE, ULSTER AND SULLI...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium.75 Hazmat Premium 20% Hydrographic Premium.50
Footnote A below
ENGI0825-008
07/01/2025
$69.96 $37.50 $107.46
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium.75 Hazmat Premium 20% Hydrographic Premium.50
Footnote A below
ENGI0825-008
07/01/2025
$68.37 $37.50 $105.87
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 3: HELICOPTER PILOT ENGINEER. (ORANGE, ULSTER AND SULLIVAN COUNTIES NOTES: Tunnel Premium.75 Hazmat Premium 20% Hydrographic Premium.50 Footnote A below ENGI0825-008
07/01/2025
$64.85 $37.50 $102.35
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT...POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium.75 Hazmat Premium 20% Hydrographic Premium.50
Footnote A below
ENGI0825-008
07/01/2025
$61.28 $37.50 $98.78
POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium.75 Hazmat Premium 20% Hydrographic Premium.50 Footnote A below ENGI0825-008
07/01/2025
$54.07 $37.50 $91.57
POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, ...POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE
Footnote A below
ENGI0158-006
07/01/2025
$54.93 $33.20 $88.13
POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE PREMIUMS 1 ...POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE PREMIUMS 1 OVER 150':ADD $1.00 2 OVER 200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)
ENGI0158-006
07/01/2025
$55.42 $33.20 $88.62
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HEL...POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-008
07/01/2025
$62.35 $37.50 $99.85
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, ...POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-008
07/01/2025
$60.70 $37.50 $98.20
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (U...POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-008
07/01/2025
$58.56 $37.50 $96.06
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER...POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-008
07/01/2025
$57.06 $37.50 $94.56
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 Footnote A below ENGI0825-008
07/01/2025
$64.28 $37.50 $101.78
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE (ORANGE, ULSTER AND SULLIVAN COU...POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-008
07/01/2025
$53.34 $37.50 $90.84
POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER...POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE
Footnote A below
ENGI0158-006
07/01/2025
$53.91 $33.20 $87.11
POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELD...POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE
Footnote A below
ENGI0158-006
07/01/2025
$51.01 $33.20 $84.21
REFRIGERATION MECHANIC (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY,...REFRIGERATION MECHANIC (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK)
PLUM0373-002
05/01/2025
$41.99 $37.38 $79.37
ROOFER ROOF0008-002
05/01/2025
$50.25 $32.62 $82.87
SHEET METAL WORKER SHEE0038-001
07/01/2025
$55.29 $47.43 $102.72
SPRINKLER FITTER SFNY0669-002
01/01/2026
$57.20 $32.66 $89.86
TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIB...TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS
Footnote A below
TEAM0445-001
05/01/2025
$37.91 $46.37 $84.28
TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS Footnote A below TEAM0445-001
05/01/2025
$39.03 $46.37 $85.40
TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS Footnote A below TEAM0445-001
05/01/2025
$37.35 $46.37 $83.72
TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERS Footnote A below TEAM0445-001
05/01/2025
$37.13 $46.37 $83.50
TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN Footnote A below TEAM0445-001
05/01/2025
$37.02 $46.37 $83.39
TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS Footnote A below TEAM0445-001
05/01/2025
$36.90 $46.37 $83.27
Footnotes in NY20260007 (15)
  • BOIL0005-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE
  • ELEC0363-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
  • ELEC1249-002 A: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
  • ELEC1249-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
  • ELEC1249-005 A: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
  • ELEV0138-001 A: VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
  • ELEV0138-001 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
  • ENGI0137-007 A: PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY
  • ENGI0158-006 A: PAID HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY
  • ENGI0158-018 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY
  • ENGI0825-007 A: PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS
  • ENGI0825-008 A: PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs
  • IRON0417-001 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY
  • LABO0235-005 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY
  • TEAM0445-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS

Questions about these rates

What is the Davis-Bacon rate for electricians on highway work in Dutchess County?
On WD NY20260007 Mod 2, published May 18, 2026, the row "ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES)" is $51.50 base plus $42.22 fringe, $93.72 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on highway work in Dutchess County?
On WD NY20260007 Mod 2, published May 18, 2026, the row "PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY)" is $60.66 base plus $45.35 fringe, $106.01 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on highway work in Dutchess County?
On WD NY20260007 Mod 2, published May 18, 2026, the row "CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY & HIGHWAY CONSTRUCTION)" is $44.72 base plus $31.23 fringe, $75.95 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as highway construction?
Roads, streets, highways, runways, bridges, parking areas and related work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NY20260007

Other counties: all New York counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.