Davis-Bacon wage rates · New York

Niagara County highway construction wage rates

Federal prevailing wage rates for highway construction in Niagara County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NY20260011
Modification
3
Published
July 30, 2026
Classifications
73
Other types here
Building, Residential, Heavy

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.

WD NY20260011, Mod 3

Make a WH-347 with these rates
Published July 30, 2026 73 classifications Covers 1 county Types: Heavy, Highway Source: SAM.gov

Scope as published: Heavy Construction · Highway Construction

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in NY20260011 Mod 3, published 07/30/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BOILERMAKER BOIL0007-001
01/01/2025
$39.35 $33.18 $72.53
BRICKLAYER, STONEMASON BRNY0045-002
07/01/2024
$37.44 $32.71 $70.15
CARPENTER CARP0276-015
07/01/2024
$41.19 $29.81 $71.00
CARPENTER: PILEDRIVER CARP0276-015
07/01/2024
$41.19 $31.55 $72.74
CEMENT FINISHER PLAS0111-002
07/01/2025
$33.55 $34.17 $67.72
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OP...ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES: LINEMAN AND TECHNICIAN
Footnote A below
ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER Footnote A below ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUD...ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
Footnote A below
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$40.81 $6.99 $47.80
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$20.53 $6.39 $26.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$38.73 $6.93 $45.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN Footnote A below ELEC1249-003
05/05/2025
$31.72 $29.87 $61.59
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)
Footnote A below
ELEC1249-003
05/05/2025
$42.29 $30.66 $72.95
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
Footnote A below
ELEC1249-003
05/05/2025
$47.57 $31.03 $78.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN
Footnote A below
ELEC1249-003
05/05/2025
$52.86 $35.60 $88.46
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC Footnote A below ELEC1249-003
05/05/2025
$42.29 $30.66 $72.95
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) ELEC1249-004
05/05/2025
$63.14 $33.82 $96.96
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable inst...ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wir...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installati...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab
ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber o...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work includ...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit...ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins
ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wi...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installat...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIANS ELEC0237-001
05/26/2025
$44.20 $32.90 $77.10
GLAZIER PAIN0004-011
05/01/2025
$34.68 $27.64 $62.32
IRONWORKER IRON0009-003
07/01/2025
$36.25 $33.12 $69.37
IRONWORKERS: (SHEETER) IRON0009-003
07/01/2025
$36.25 $33.12 $69.37
LABORER COMPRESSED AIR GROUP 1 TOP LABORERS Footnote A below LABO0091-002
07/01/2017
$26.00 $35.96 $61.96
LABORER GROUP 1 (HEAVY & HIGHWAY CLASSIFICATIONS) COMMON LABORERS, MULTI-TRADE TENDER, DECONTAMINATION OF ALL MACHINES, HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES Footnote A below LABO0091-002
07/01/2017
$26.00 $35.96 $61.96
LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS) POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL TEND...LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS) POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE; OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE SYSTEMS IN HAZARDOUS ENVIRONMENT; MEN WORKING FROM SWINGING SCAFFOLD BO'SNS CHAIR, SUSPENDED CAGE OR BUCKET; ALL OTHER OPERATORS OF MECHANICAL TOOLS, INCLUDING VIBRATORS REGARDLESS OF TYPE OF POWER AND BOAT MEN; OPERATION OF ALL TYPES OF VIDEO MACHINERY USED IN THE INSPECTION OF PIPE; WORK IN CAISSONS BELOW 8 FEET; CONCRETE MOTOR BUGGY
Footnote A below
LABO0091-002
07/01/2017
$26.30 $35.96 $62.26
LABORER GROUP 3 (HEAVY & HIGHWAY CLASSIFICATIONS) RESPIRATOR REQUIRED FOR BUSTING Footnote A below LABO0091-002
07/01/2017
$26.50 $35.96 $62.46
LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS) FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; SANDBLASTERS; BURNING TORCH; CONCRETE SAW OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT MACHINE AN...LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS) FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; SANDBLASTERS; BURNING TORCH; CONCRETE SAW OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT MACHINE AND GROUT PUMP OPERATOR
Footnote A below
LABO0091-002
07/01/2017
$26.60 $35.96 $62.56
LABORER GROUP 5 (HEAVY & HIGHWAY CLASSIFICATIONS) LASER BEAM OPERATOR Footnote A below LABO0091-002
07/01/2017
$26.85 $35.96 $62.81
LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS) WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS REQUIRED FOR HA...LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS) WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS REQUIRED FOR HAZARDOUS WASTE & TOXIC MATERIALS, ASBESTOS ABATEMENT OR LEAD ABATEMENT)
Footnote A below
LABO0091-002
07/01/2017
$27.00 $35.96 $62.96
LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS) CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL & ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS...LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS) CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL & ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS, CEILINGS, PIPES, WALLS, BOILERS ETC., AND ALL MACHINERY, & THE RECOVERING OF SAME; REMOVAL OF LEAD
Footnote A below
LABO0091-002
07/01/2017
$28.00 $35.96 $63.96
LABORER GROUP 8 (HEAVY & HIGHWAY CLASSIFICATIONS) GRADE CHECKER & BLASTER Footnote A below LABO0091-002
07/01/2017
$28.60 $35.96 $64.56
LABORER GROUP 9 (HEAVY & HIGHWAY CLASSIFICATIONS) SUPPLIED AIR RESPIRATORS Footnote A below LABO0091-002
07/01/2017
$31.00 $35.96 $66.96
MARBLE MASON BRNY0045-002
07/01/2023
$36.85 $30.80 $67.65
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH & ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) PAIN0004-002
05/01/2025
$33.00 $28.21 $61.21
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) PAIN0004-002
05/01/2025
$34.00 $28.51 $62.51
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) PAIN0004-002
05/01/2025
$33.00 $28.21 $61.21
PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) PAIN0004-005
05/01/2025
$33.00 $28.21 $61.21
PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING, SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) PAIN0004-005
05/01/2025
$33.00 $28.21 $61.21
PAINTERS: TAPERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) PAIN0004-005
05/01/2025
$34.00 $28.51 $62.51
PLUMBER AND STEAMFITTER (ZONE 1) PLUM0022-005
04/29/2024
$42.20 $29.80 $72.00
POINTER, CLEANER AND CAULKER BRNY0045-002
07/01/2023
$36.82 $31.33 $68.15
POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CABLEWAYS, CLAMBUCKETS,...POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC BACK-HOE), COMPRESSOR (WITH PAING BREAKER ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER), CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED), CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES (OVERHEAD OR BRIDGE), CRANE OPERATOR (OVER 100, 200, 300 FEET BOOMS EARN PREMIUMS AS NOTED HEREIN), DERRICKS, DRAGLINES, EUCLID TYPE BELT LOADERS, FINISHING MACHINE OPERATORS, FORK-LIFTS AND HOISTS 9 WHEN LIFTING MATERIAL AT AN ELEVATION HIGHER THAN TWENTY-FIVE FEET), FORM PULLER, GENERATOR AND COMPRESSOR (POWER DRIVEN-WHEN USED SIMULTANEOUSLY AND FOR ANY MAKE OF PORTABLE CONCRETE BATCHING MACHINE), GRADERS, GRADERS (WITH BULLDOZER BLADES), HOISTS (MULTIPLE DRUM WITH AIR COMPRESOR WHEN USED SIMULTANEOUSLY FOR MORE THAN ONE PURPOSE), HOISTS - SINGLE DRUM WHEN USED TO HOIST STEEL), HYDRAULIC CONCRETE JOINT HAMMERS, HYDRAULIC ROCK DRILL (INGERSOLL-RAND LM 500 TYPE), HYDRO-AXE, KOLMAN LOADERS, LOADERS (FRONT & BACK - EXCEPT SMALL TYPE), LUBRICATION ENGINEERS, MECHANIC, PAVEMENT BREAKER (EXCEPT HAND OPERATED PAVEMENT BREAKERS), PILE DRIVING RIGS, PIPE PUSHING RIGS, PIPE PUSHING MACHINES (MECHANICL AND HYDRAULIC), POST DRIVERS (EXCEPT TRUCK MOUNTED POST DRIVERS), REAPIR WORK ON MAINTENANCE WORK UNDER THE SUPERVISION OF A MASTER MECHANIC, ROLLERS (ALL) (ON FINISH BLACKTOP), SCOOPMOBILES (ALL), SCRAPTER (EITHER DOUBLE OR SINGLE BOWL), S-240 LAZER-GUIDED SCREED, SHOVELS, SNOW-LOADER, STEEL ERECTION, STONE CRUSHERS (PORTABLE), STONE SPREADERS (POWER DRIVEN), TRACTORS USE DIN CONJUNCTION WITH SCRAPER WAGONS (ALL), TREE BANDIT OR SIMILAR CHIPPER, TRANCHERS (WHEN EXCAVATION OVER SIX FEET IN DEPTH), TUNNEL MUCKING MACHINES, VIBRATORS (SELF-PROPELLED RIDING), WELDER NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A)
ENGI0017-007
07/01/2025
$47.39 $34.84 $82.23
POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOO...POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR (SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED 0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS (ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, GUNNITE MACHINES, HEATERS (GASOLINE -USE IN BANKS OF TWO AND NOT OVER THREE WITHIN AN AREA OF ONE HUDNRED FOOT RADIUS, HIGHLIFT HOISTS WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, MATERIAL HOISTS, SINGLE DRUM HOIST FOR HOISTING MATERIALS OTHER THAN STEEL, LATOURNEAU TURNATRAILERS, LIGHT AND POWER SYSTEMS 9 GAS OR DIESEL DRIVEN - TEMPORARY 25 KW CAPACITY OR OVER), LOADERS 9 SMALL FRONT OR BACK), LOCOMOTIVE, PARTS ROOM - WHEN A PARTS ROOM IS MANNED IT SHALL BE AN ENGINEER, PAVEMENT BUSTERS, PIN PULLSER, POST DRIVERS 9 TRUCK MOUNTED), PUG MACHINE, PUMS OVER 4 INCHES, (ROAD ROLLERS EXCEPT ON FINISH BALCKTOP, ROAD WIDENER MOUNTED ON A LOADER, ROLLES (SELF PROPELLED - NOT ON FINISH BLACKTOP AND UNDER 7 TONS), SCOOPMOBILES - WHEN USED AS A STATION ARY HOIST, OR ONE USED TO LIFT MATERIAL NOT IN EXCESS OF 25 FEET, SNOW-GO, STONE CRUSHERS AND WINCH HOISTS MOUNTED ON TRUCKS, TRACTORS, TRENCHERS EXCAVATING UP TO 6 FT DEEP), TRENCHERS ON THE BACK OF A JEEP, WELDING MACHINES (FOR 2 BUT NOT OVER 3 GASOLINE OR DIESEL DRIVEN), WINCH TRACTORS NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A)
ENGI0017-007
07/01/2025
$42.89 $34.84 $77.73
POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG...POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
Footnote A below
ENGI0017-007
07/01/2025
$48.46 $34.84 $83.30
POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND HIGHWAY CONSTRUCTION NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AN...POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND HIGHWAY CONSTRUCTION NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A)
ENGI0017-007
07/01/2025
$47.39 $34.84 $82.23
POWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE P...POWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
Footnote A below
ENGI0017-008
07/01/2016
$38.06 $28.10 $66.16
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 2...POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
Footnote A below
ENGI0017-008
07/01/2016
$36.29 $28.10 $64.39
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE AND S...POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE, SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND SHAFT), TUNNEL SHOVEL NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
Footnote A below
ENGI0017-008
07/01/2016
$39.29 $28.10 $67.39
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT ...POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE, FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE, HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN, PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE, SHOVEL (TOPSIDE) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
Footnote A below
ENGI0017-008
07/01/2016
$34.58 $28.10 $62.68
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A DISTANCE...POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A DISTANCE FOR COMPRESSORS), DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500 FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET (MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
Footnote A below
ENGI0017-008
07/01/2016
$28.53 $28.10 $56.63
ROOFERS: COMPOSITION ROOF0074-002
06/01/2024
$34.96 $26.03 $60.99
ROOFERS: SLATE & TILE ROOF0074-002
06/01/2024
$35.11 $26.03 $61.14
SHEET METAL WORKER SHEE0071-002
05/27/2024
$39.50 $29.18 $68.68
SPRINKLER FITTER SFNY0669-001
01/01/2026
$47.85 $28.94 $76.79
TILE & TERRAZZO WORKER BRNY0045-002
07/01/2024
$37.85 $31.80 $69.65
TILE, MARBLE & TERRAZZO FINISHER BRNY0045-002
07/01/2024
$34.71 $17.54 $52.25
TRUCK DRIVERS: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS Footnote A below TEAM0449-006
06/01/2025
$32.00 $0.00 $32.00
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY) WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR Footnote A, B below TEAM0449-003
07/01/2025
$49.23 $8.75 $57.98
Footnotes in NY20260011 (8)
  • ELEC1249-003 A: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
  • ELEC1249-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
  • ENGI0017-007 A: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TUNNEL AND SHAFT CLASSIFICATIONS
  • ENGI0017-008 A: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY
  • LABO0091-002 A: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
  • TEAM0449-003 A: PENSION $54.00 PER DAY
  • TEAM0449-003 B: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY
  • TEAM0449-006 A: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY

Questions about these rates

What is the Davis-Bacon rate for electricians on highway work in Niagara County?
On WD NY20260011 Mod 3, published July 30, 2026, the row "ELECTRICIANS" is $44.20 base plus $32.90 fringe, $77.10 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on highway work in Niagara County?
On WD NY20260011 Mod 3, published July 30, 2026, the row "PLUMBER AND STEAMFITTER (ZONE 1)" is $42.20 base plus $29.80 fringe, $72.00 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on highway work in Niagara County?
On WD NY20260011 Mod 3, published July 30, 2026, the row "CARPENTER" is $41.19 base plus $29.81 fringe, $71.00 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as highway construction?
Roads, streets, highways, runways, bridges, parking areas and related work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NY20260011

Other counties: all New York counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.