Davis-Bacon wage rates · New York
Putnam County heavy construction wage rates
Federal prevailing wage rates for heavy construction in Putnam County, New York, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NY20260025
- Modification
- 2
- Published
- May 18, 2026
- Classifications
- 105
- Other types here
- Building, Residential, Highway
2 wage determinations cover heavy work in Putnam County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.
1 of 2: WD NY20260025, Mod 2
Make a WH-347 with these ratesScope as published: Building Construction Projects · Heavy Construction Projects · Highway Construction Projects
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BOILERMAKER Footnote A below | BOIL0005-001 01/01/2025 | $68.88 | $49.83 | $118.71 |
| BRICKLAYER (MARBLE POLISHERS) | BRNY0024-001 06/03/2024 | $52.32 | $36.25 | $88.57 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING CONSTRUCTION) | BRNY0005-004 06/01/2023 | $46.39 | $37.45 | $83.84 |
| CARPENTER (SOFT FLOOR LAYERS) | CARP2287-002 07/01/2025 | $44.69 | $38.17 | $82.86 |
| CARPENTERS (BUILDING) | CARP0279-002 07/01/2025 | $50.12 | $31.73 | $81.85 |
| CARPENTERS: (HEAVY & HIGHWAY) | CARP0279-002 07/01/2025 | $50.12 | $31.73 | $81.85 |
| DIVER | CARP1556-007 07/01/2024 | $75.46 | $55.84 | $131.30 |
| DIVER TENDER | CARP1556-007 07/01/2024 | $55.00 | $55.84 | $110.84 |
| DOCK BUILDER & PILEDRIVERMEN | CARP1556-006 07/01/2024 | $60.59 | $55.84 | $116.43 |
| ELECTRICIAN (PUTNAM COUNTY) Footnote A below | ELEC0363-003 04/01/2025 | $51.50 | $42.22 | $93.72 |
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OP...ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES: LINEMAN AND TECHNICIAN | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER Footnote A below | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUD...ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $40.81 | $6.99 | $47.80 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $20.53 | $6.39 | $26.92 |
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | ELEC1249-008 01/01/2025 | $38.73 | $6.93 | $45.66 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN Footnote A below | ELEC1249-002 05/05/2025 | $32.51 | $29.93 | $62.44 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR) | ELEC1249-002 05/05/2025 | $48.77 | $31.31 | $80.08 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER) | ELEC1249-002 05/05/2025 | $43.35 | $30.73 | $74.08 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) | ELEC1249-002 05/05/2025 | $43.35 | $30.73 | $74.08 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN | ELEC1249-002 05/05/2025 | $54.19 | $35.69 | $89.88 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC Footnote A below | ELEC1249-002 05/05/2025 | $43.35 | $30.73 | $74.08 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | ELEC1249-004 05/05/2025 | $63.14 | $33.82 | $96.96 |
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable inst...ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $64.59 | $42.92 | $107.51 |
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wir...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installati...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $35.34 | $30.12 | $65.46 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | ELEC1249-004 05/05/2025 | $55.40 | $31.78 | $87.18 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber o...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work includ...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit...ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | ELEC1249-004 05/05/2025 | $61.56 | $36.21 | $97.77 |
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wi...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installat...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | ELEC1249-004 05/05/2025 | $49.25 | $31.15 | $80.40 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0138-001 01/01/2026 | $76.12 | $38.98 | $115.10 |
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | ASBE0091-001 06/02/2025 | $46.62 | $49.30 | $95.92 |
| INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | ASBE0091-001 06/02/2025 | $46.62 | $49.30 | $95.92 |
| IRONWORKER A) Footnote NOTE below | IRON0417-001 07/01/2025 | $42.63 | $53.70 | $96.33 |
| LABORER (BUILDING) | LABO0235-001 05/01/2025 | $44.05 | $32.40 | $76.45 |
| LABORERS: HEAVY: GROUP 1 BLASTERS Footnote A below | LABO0060-001 03/30/2025 | $52.11 | $28.98 | $81.09 |
| LABORERS: HEAVY: GROUP 2 BURNER, JUMBO DRILLER, JOY DRILLER, WAGON DRILLER, AIR TRACK DRILLER, HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE FORM AND CURB FORM (STEEL), ASPHALT SCREEDMAN, ASPHALT RAKER Footnote A below | LABO0060-001 03/30/2025 | $50.71 | $28.98 | $79.69 |
LABORERS: HEAVY: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, CONCRETE SAW...LABORERS: HEAVY: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, CONCRETE SAW, GUNNITING, RAILROAD SPIKE PULLER AND SANDBLASTING, PIPE LAYER, DECK WINCHES ON SCOWS, POWER BUGGY OPERATOR, POWER WHEELBARROW OPERATOR | LABO0060-001 03/30/2025 | $50.29 | $28.98 | $79.27 |
LABORERS: HEAVY: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT GRINDER, CON...LABORERS: HEAVY: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT GRINDER, CONCRETE GRINDER, AIR TAMPERS AND ALL TAMPERS NOT COVERED BY ANY OTHER CLASSIFICATION, FORM PIN PULLER, PUMPS AND THEIR OPERATION, SERVICE OF AIR POWER, EPOXY AND WATERPROOFING WORKER, FINE GRADE PERSON BETWEEN FORMS, BARCO RAMMER, GUARD AND GUIDE RAIL AND LINK FENCE, STEEL KINGS | LABO0060-001 03/30/2025 | $49.93 | $28.98 | $78.91 |
| LABORERS: HEAVY: GROUP 5 COMMON LABORERS, SIGNAL PERSON AND PIT PERSON, TRUCK SPOTTERS, POWDER PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON Footnote A below | LABO0060-001 03/30/2025 | $49.56 | $28.98 | $78.54 |
| LABORERS: HEAVY: GROUP 6 FLAGPERSON Footnote A below | LABO0060-001 03/30/2025 | $42.96 | $28.98 | $71.94 |
| LABORERS: HEAVY: GROUP 7 ASBESTOS AND TOXIC WASTE LABORER Footnote A below | LABO0060-001 03/30/2025 | $51.64 | $28.98 | $80.62 |
LABORERS: HIGHWAY: GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK,...LABORERS: HIGHWAY: GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS | LABO0235-004 05/01/2023 | $36.45 | $27.80 | $64.25 |
LABORERS: HIGHWAY: GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, POWDERMAN, HIGHSCALERS POWER BUGGY OPERATOR, STEEL ROD CARRIER...LABORERS: HIGHWAY: GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, POWDERMAN, HIGHSCALERS POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKER | LABO0235-004 05/01/2023 | $42.80 | $27.80 | $70.60 |
| LABORERS: HIGHWAY: GROUP 3 ASPHALT RAKER, ASPHALT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS, LEAD MAN, TUNNEL & CAISSON Footnote A below | LABO0235-004 05/01/2023 | $43.90 | $27.80 | $71.70 |
| MARBLE FINISHER | BRNY0020-001 07/01/2024 | $49.99 | $37.54 | $87.53 |
| MARBLE MASON | BRNY0004-001 07/01/2024 | $63.92 | $40.20 | $104.12 |
| MILLWRIGHT | CARP0740-001 07/01/2025 | $60.83 | $58.03 | $118.86 |
| PAINTER (GLAZIERS) | PAIN0009-003 05/01/2025 | $49.20 | $57.20 | $106.40 |
| PAINTER (PAINTERS, PAPERHANGER, DRYWALL FINISHERS & LEAD ABATEMENT WORKER) | PAIN0009-003 05/01/2025 | $44.75 | $44.11 | $88.86 |
| PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) | PAIN0009-003 05/01/2025 | $47.75 | $44.11 | $91.86 |
| PLUMBER AND STEAMFITTER (ZONE 1) | PLUM0021-001 05/01/2025 | $65.07 | $45.35 | $110.42 |
| POINTER, CLEANER AND CAULKER | BRNY0001-003 06/01/2018 | $41.96 | $33.38 | $75.34 |
POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERA...POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $68.63 | $35.25 | $103.88 |
POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCTURE); DERRICK ...POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $59.04 | $31.32 | $90.36 |
POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIP...POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $60.42 | $35.25 | $95.67 |
POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK A...POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $54.41 | $31.32 | $85.73 |
POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 1...POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $63.70 | $35.25 | $98.95 |
POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDE...POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $56.97 | $31.32 | $88.29 |
POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; ...POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $57.84 | $35.25 | $93.09 |
POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% ...POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $59.67 | $35.25 | $94.92 |
POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TY...POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $56.81 | $35.25 | $92.06 |
POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR ...POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR). NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $54.88 | $31.32 | $86.20 |
POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTI...POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $52.25 | $31.32 | $83.57 |
POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISH...POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $54.33 | $31.32 | $85.65 |
POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RA...POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $51.57 | $35.25 | $86.82 |
POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHE...POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $45.94 | $31.32 | $77.26 |
POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WAT...POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $44.19 | $35.25 | $79.44 |
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPE...POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $49.53 | $31.32 | $80.85 |
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: R...POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $64.02 | $35.25 | $99.27 |
POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING CONSTRUCTION) MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 F...POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING CONSTRUCTION) MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $61.95 | $31.32 | $93.27 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100...POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $64.02 | $35.25 | $99.27 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGAR...POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $77.82 | $35.25 | $113.07 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRAN...POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $75.13 | $35.25 | $110.38 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR...POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $70.41 | $35.25 | $105.66 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HA...POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $59.19 | $35.25 | $94.44 |
POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING CONSTRUCTION) UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +)...POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING CONSTRUCTION) UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $47.00 | $31.32 | $78.32 |
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING CONSTRUCTION) WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +)...POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING CONSTRUCTION) WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-003 03/04/2024 | $49.26 | $31.32 | $80.58 |
| ROOFER | ROOF0008-002 05/01/2025 | $50.25 | $32.62 | $82.87 |
| SHEET METAL WORKER | SHEE0038-001 07/01/2025 | $55.29 | $47.43 | $102.72 |
| SPRINKLER FITTER | SFNY0669-002 01/01/2026 | $57.20 | $32.66 | $89.86 |
| TERRAZZO FINISHER | BRNY0007-001 12/02/2024 | $49.59 | $34.25 | $83.84 |
| TERRAZZO WORKER/SETTER | BRNY0007-001 12/02/2024 | $64.62 | $37.63 | $102.25 |
| TILE FINISHER | BRNY0007-002 12/02/2024 | $49.59 | $34.25 | $83.84 |
| TILE LAYER | BRNY0052-001 06/03/2024 | $64.40 | $37.13 | $101.53 |
| TRUCK DRIVERS: GROUP 1 LOWBOY (CARRYING EQUIPMENT) HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $51.26 | $38.93 | $90.19 |
| TRUCK DRIVERS: GROUP 10 OFF ROAD EQUIPMENT (OVER 40 TONS) EUCLID, DJB HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.51 | $38.93 | $89.44 |
| TRUCK DRIVERS: GROUP 11 OFF ROAD EQUIPMENT (UNDER 40 TONS) DJB HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.26 | $38.93 | $89.19 |
TRUCK DRIVERS: GROUP 2 STRAIGHT JOBS: 6-WHEELER, 10-WHEELER, A-FRAME TRUCKS (INSIDE CAB), WINCH TRUCK (INSIDE CAB), DYNAMITE TRUCK, SEEDING TRUCK, MULCHING TRUCK, AGITATOR TRUCK, WATER TRUCK, CEMENT T...TRUCK DRIVERS: GROUP 2 STRAIGHT JOBS: 6-WHEELER, 10-WHEELER, A-FRAME TRUCKS (INSIDE CAB), WINCH TRUCK (INSIDE CAB), DYNAMITE TRUCK, SEEDING TRUCK, MULCHING TRUCK, AGITATOR TRUCK, WATER TRUCK, CEMENT TRUCKS (ALL TYPES), SUBURBANS, STATION WAGONS, CARS, PICKUPS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION | TEAM0456-001 07/01/2025 | $48.51 | $38.93 | $87.44 |
| TRUCK DRIVERS: GROUP 3 FUEL AND TIRE TRUCKS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $48.96 | $38.93 | $87.89 |
| TRUCK DRIVERS: GROUP 4 TRACTOR TRAILERS (ALL TYPES) HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $49.13 | $38.93 | $88.06 |
| TRUCK DRIVERS: GROUP 6 ATHEY WAGON, BELLY DUMPS, ARTICULATED DUMPS, TRAILER WAGONS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $49.26 | $38.93 | $88.19 |
| TRUCK DRIVERS: GROUP 7 DARTS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.01 | $38.93 | $88.94 |
| TRUCK DRIVERS: GROUP 8 RXS HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.38 | $38.93 | $89.31 |
| TRUCK DRIVERS: GROUP 9 OFF ROAD EQUIPMENT (UNDER 40 TONS): EUCLID HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $49.88 | $38.93 | $88.81 |
| TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCION- GROUP 5 14 WHEELER. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $48.63 | $38.93 | $87.56 |
Footnotes in NY20260025 (12)
- BOIL0005-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE
- ELEC0363-003 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
- ELEC1249-002 A: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
- ELEC1249-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
- ELEV0138-001 A: VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
- ELEV0138-001 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
- ENGI0137-003 A: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY
- ENGI0137-006 A: PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY
- IRON0417-001 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY
- LABO0060-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY
- LABO0235-004 A: PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY
- TEAM0456-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL
2 of 2: WD NY20260001, Mod 2
Make a WH-347 with these ratesScope as published: All dredging, except self propelled hopper dredging, on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TU...DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $48.48 | $15.34 | $63.82 |
DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED M...DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $43.20 | $14.99 | $58.19 |
DREDGING: CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, ...DREDGING: CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $41.93 | $14.90 | $56.83 |
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF ...DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $39.46 | $14.73 | $54.19 |
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 ...DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $38.38 | $14.66 | $53.04 |
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOW...DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $37.15 | $14.57 | $51.72 |
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVE...DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 | ENGI0025-001 10/01/2025 | $30.86 | $14.15 | $45.01 |
Footnotes in NY20260001 (2)
- ENGI0025-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY
- ENGI0025-001 B: VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Questions about these rates
What is the Davis-Bacon rate for electricians on heavy work in Putnam County?
What is the Davis-Bacon rate for plumbers on heavy work in Putnam County?
What is the Davis-Bacon rate for carpenters on heavy work in Putnam County?
Which wage determination applies to my project?
What counts as heavy construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NY20260025
Other counties: all New York counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.