Davis-Bacon wage rates · New York

Rockland County building construction wage rates

Federal prevailing wage rates for building construction in Rockland County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NY20260020
Modification
2
Published
May 18, 2026
Classifications
94
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.

WD NY20260020, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 94 classifications Covers 1 county Types: Building, Heavy, Highway, Residential Source: SAM.gov

Scope as published: Building Construction Projects · Heavy Construction Projects · Highway Construction Projects

Davis-Bacon rates in NY20260020 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BOILERMAKER Footnote A below BOIL0005-001
01/01/2025
$68.88 $49.83 $118.71
BRICKLAYER: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING/RESIDENTIAL CONSTRUCTION) BRNY0005-005
06/01/2024
$47.44 $38.00 $85.44
CARPENTERS: (BUILDING AND HEAVY & HIGHWAY CONSTRUCTION) CARP0279-004
07/01/2025
$50.12 $31.73 $81.85
CARPENTERS (RESIDENTIAL) CARP0279-004
07/01/2025
$32.60 $20.69 $53.29
DIVER CARP1556-007
07/01/2024
$75.46 $55.84 $131.30
DIVER TENDER CARP1556-007
07/01/2024
$55.00 $55.84 $110.84
DOCK BUILDER & PILEDRIVERMEN CARP1556-006
07/01/2024
$60.59 $55.84 $116.43
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OP...ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES: LINEMAN AND TECHNICIAN
Footnote A below
ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER Footnote A below ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUD...ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
Footnote A below
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$40.81 $6.99 $47.80
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$20.53 $6.39 $26.92
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORA...ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
ELEC1249-008
01/01/2025
$38.73 $6.93 $45.66
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN Footnote A below ELEC1249-002
05/05/2025
$32.51 $29.93 $62.44
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR)
Footnote A below
ELEC1249-002
05/05/2025
$48.77 $31.31 $80.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER)
Footnote A below
ELEC1249-002
05/05/2025
$43.35 $30.73 $74.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
Footnote A below
ELEC1249-002
05/05/2025
$43.35 $30.73 $74.08
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SY...ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN
Footnote A below
ELEC1249-002
05/05/2025
$54.19 $35.69 $89.88
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC Footnote A below ELEC1249-002
05/05/2025
$43.35 $30.73 $74.08
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) ELEC1249-004
05/05/2025
$63.14 $33.82 $96.96
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable inst...ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$64.59 $42.92 $107.51
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wir...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installati...ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$35.34 $30.12 $65.46
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab
ELEC1249-004
05/05/2025
$55.40 $31.78 $87.18
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber o...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and c...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work includ...ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit...ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins
ELEC1249-004
05/05/2025
$61.56 $36.21 $97.77
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wi...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities:)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installat...ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)
ELEC1249-004
05/05/2025
$49.25 $31.15 $80.40
ELECTRICIANS: BUILDING, HEAVY & HIGHWAY CONSTRUCTION Footnote A below ELEC0363-006
04/01/2025
$51.50 $42.22 $93.72
ELECTRICIANS: RESIDENTIAL CONSTRUCTION Footnote A below ELEC0363-006
04/01/2025
$51.50 $42.22 $93.72
ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR) Footnote A, B below ELEV0001-002
03/17/2022
$75.14 $47.45 $122.59
ELEVATOR MECHANIC (MODERNIZATION AND REPAIR) Footnote A, B below ELEV0001-002
03/17/2022
$59.09 $45.56 $104.65
ELEVATOR MECHANIC (THE TOWN OF STONY POINT) Footnote A, B below ELEV0138-002
01/01/2026
$76.12 $38.98 $115.10
GLAZIER PAIN0009-010
05/01/2025
$49.20 $57.20 $106.40
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) ASBE0091-001
06/02/2025
$46.62 $49.30 $95.92
INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) ASBE0091-001
06/02/2025
$46.62 $49.30 $95.92
IRONWORKER A) Footnote NOTE below IRON0417-001
07/01/2025
$42.63 $53.70 $96.33
LABORER CATEGORY A: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) LABO0754-001
06/01/2022
$50.25 $28.15 $78.40
LABORER CATEGORY B: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) LABO0754-001
06/01/2022
$50.25 $28.15 $78.40
LABORER CATEGORY C: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) LABO0754-001
06/01/2022
$50.25 $28.15 $78.40
LABORER CATEGORY D: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) LABO0754-001
06/01/2022
$50.25 $28.15 $78.40
LABORER GROUP 1 (HEAVY & HIGHWAY CONSTRUCTION) BLASTERS Footnote A below LABO0754-001
06/01/2022
$52.35 $28.15 $80.50
LABORER GROUP 2 (HEAVY & HIGHWAY CONSTRUCTION) TRACK OPERATOR; JOY DRILL OPERATOR Footnote A below LABO0754-001
06/01/2022
$50.25 $28.15 $78.40
LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION) NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN (BY MACHINE OR HAND); SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER;...LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION) NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN (BY MACHINE OR HAND); SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER; WAGON DRILLER; JIB RIG OPERATOR; PAVEMENT BREAKER; VIBRATOR MAN; BIT GRINDER; POWDER MAN; RAMSET OPERATOR; RIP RAP AND DRY STONE LAYER; CEMENT SPRAY MAN; GUNNITE NOZZLE MAN; SPRAY AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE; SAND BLASTER; CONCRETE SAW; ALL OTHER MACHINE OR SEMI-SKILLED MEN; ASBESTOS AND HAZARDOUS WASTE REMOVAL; CONCRETE LABORER; BUILDING LABORER; MASON TENDER; CARPENTER TENDER; PIPE LAYER (ALL TYPES); SIGNAL MAN; GABION BASKET ASSEMBLER; BULL FLOAT MAN; FORM SETTER; LINER; JOINT SETTER; SHEETER; TIP CONCRETE MAN; STUD OR RIVETING GUN MAN; ALL SCALERS; ASPHALT MEN (ALL TYPES); RAIL AND FENCE (ALL TYPES); CORE DRILLER; WRECKING AND DEMOLITION MAN; BAR MAN; SEEDER; PLANTER; LANDSCAPE MEN (ALL TYPES), AX MAN; PIT AND DUMP MEN; ROAD LABORER
Footnote A below
LABO0754-001
06/01/2022
$46.10 $28.15 $74.25
LABORER GROUP 4 (HEAVY & HIGHWAY CONSTRUCTION) FLAG PERSON Footnote A below LABO0754-001
06/01/2022
$42.60 $28.15 $70.75
MILLWRIGHT CARP0740-001
07/01/2025
$60.83 $58.03 $118.86
PAINTERS: (DRYWALL FINISHER) PAIN0155-004
05/01/2021
$39.14 $24.66 $63.80
PAINTERS: (LEAD ABATEMENT WORK) PAIN0155-004
05/01/2021
$39.14 $24.66 $63.80
PAINTERS: (PAINTER/PAPERHANGER) PAIN0155-004
05/01/2021
$39.14 $24.66 $63.80
PAINTERS: (SPRAY RATE) PAIN0155-004
05/01/2021
$40.14 $24.66 $64.80
PAINTERS: (STRUCTURAL STEEL AND BRIDGE) PAIN0806-001
10/01/2024
$56.25 $55.14 $111.39
PIPE BENDING MACHINE OPERATOR CARP1556-010
07/01/2019
$54.63 $50.98 $105.61
PLUMBER (PLUMBERS AND STEAMFITTERS) PLUM0373-001
05/01/2025
$53.20 $46.57 $99.77
PLUMBER (REFRIGERATION) PLUM0373-001
05/01/2025
$41.99 $37.38 $79.37
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHIC...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$70.24 $37.50 $107.74
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHIC...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$68.58 $37.50 $106.08
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND ...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$61.29 $37.50 $98.79
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF P...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMAN; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$58.63 $37.50 $96.13
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFI...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$57.10 $37.50 $94.60
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 Footnote A below ENGI0825-013
07/01/2025
$53.34 $37.50 $90.84
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 7 HELICOPTER PILOT NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM.75 Footnote A below ENGI0825-013
07/01/2025
$65.74 $37.50 $103.24
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM.7...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM.75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-013
07/01/2025
$69.96 $37.50 $107.46
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM.75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM.50 Footnote A below ENGI0825-013
07/01/2025
$64.85 $37.50 $102.35
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPME...POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STEAM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITE OR IN CONJUCTION WITH THE JOB SITE. NOTES: TUNNEL PREMIUM.75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-013
07/01/2025
$61.28 $37.50 $98.78
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 5: OILER NOTES: TUNNEL PREMIUM.75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM.50 Footnote A below ENGI0825-013
07/01/2025
$54.07 $37.50 $91.57
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACH...POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (RAILROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONJUCTION WITH GENERATORS); HOISTS (ROOF, TUGGEAERIAL PLATFORM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONJUCTION WITH UNLOADING); WELDER AND REPAIR MECHANICS; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR, ULTRA HIGH PRESSURE WATERJET CUTTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-012
07/01/2025
$58.22 $37.50 $95.72
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NO...POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (WELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TWO OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-012
07/01/2025
$56.59 $37.50 $94.09
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 Footnote A below ENGI0825-012
07/01/2025
$52.88 $37.50 $90.38
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 6 HELICOPTER PILOTS NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM.50 Footnote A below ENGI0825-012
07/01/2025
$63.54 $37.50 $101.04
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), H...POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$62.35 $37.50 $99.85
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH...POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$60.70 $37.50 $98.20
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS ...POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHANIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$58.56 $37.50 $96.06
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OV...POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FARM TRACTORS. NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$57.06 $37.50 $94.56
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE NOTES: HYDROGRAPHIC PREMIUM.50 HAZM...POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75
Footnote A below
ENGI0825-013
07/01/2025
$53.34 $37.50 $90.84
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM.50 HAZMAT PREMIUM 20% TUNNEL PREMIUM.75 Footnote A below ENGI0825-013
07/01/2025
$64.28 $37.50 $101.78
POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE ...POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT,CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST") HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; "STRADDLE" CARRIER, ROSS AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; WINCH TRUCKS(HOISTING).. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM $0.50
Footnote A below
ENGI0825-012
07/01/2025
$60.13 $37.50 $97.63
POWER EQUIPMENT OPERATORS: GROUP 1 ENGI0825-012
07/01/2025
$61.72 $37.50 $99.22
POWER EQUIPMENT OPERATORS(BUILDING CONSTRUCTION TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUN...POWER EQUIPMENT OPERATORS(BUILDING CONSTRUCTION TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL PREMIUM.75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM.50
Footnote A below
ENGI0825-013
07/01/2025
$68.37 $37.50 $105.87
SHEET METAL WORKER SHEE0038-001
07/01/2025
$55.29 $47.43 $102.72
SPRINKLER FITTER SFNY0669-002
01/01/2026
$57.20 $32.66 $89.86
TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIB...TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS
Footnote A below
TEAM0445-001
05/01/2025
$37.91 $46.37 $84.28
TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS Footnote A below TEAM0445-001
05/01/2025
$39.03 $46.37 $85.40
TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS Footnote A below TEAM0445-001
05/01/2025
$37.35 $46.37 $83.72
TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERS Footnote A below TEAM0445-001
05/01/2025
$37.13 $46.37 $83.50
TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN Footnote A below TEAM0445-001
05/01/2025
$37.02 $46.37 $83.39
TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS Footnote A below TEAM0445-001
05/01/2025
$36.90 $46.37 $83.27
Footnotes in NY20260020 (13)
  • BOIL0005-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE
  • ELEC0363-006 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY
  • ELEC1249-002 A: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
  • ELEC1249-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
  • ELEV0001-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.
  • ELEV0001-002 B: PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED
  • ELEV0138-002 A: VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
  • ELEV0138-002 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
  • ENGI0825-012 A: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS
  • ENGI0825-013 A: PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS
  • IRON0417-001 NOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY
  • LABO0754-001 A: PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS
  • TEAM0445-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS

Questions about these rates

What is the Davis-Bacon rate for electricians on building work in Rockland County?
On WD NY20260020 Mod 2, published May 18, 2026, the row "ELECTRICIANS: BUILDING, HEAVY & HIGHWAY CONSTRUCTION" is $51.50 base plus $42.22 fringe, $93.72 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on building work in Rockland County?
On WD NY20260020 Mod 2, published May 18, 2026, the row "PLUMBER (REFRIGERATION)" is $41.99 base plus $37.38 fringe, $79.37 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Rockland County?
On WD NY20260020 Mod 2, published May 18, 2026, the row "CARPENTERS: (BUILDING AND HEAVY & HIGHWAY CONSTRUCTION)" is $50.12 base plus $31.73 fringe, $81.85 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NY20260020

Other counties: all New York counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.