Davis-Bacon wage rates · New York

Steuben County highway construction wage rates

Federal prevailing wage rates for highway construction in Steuben County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NY20260018
Modification
1
Published
May 18, 2026
Classifications
37
Other types here
Building, Residential, Heavy

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.

WD NY20260018, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 37 classifications Covers 1 county Types: Highway Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in NY20260018 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ELECTRICIAN ELEC0139-003
06/01/2025
$43.40 $31.72 $75.12
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN Footnote A below ELEC1249-003
05/05/2025
$31.72 $29.87 $61.59
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)
Footnote A below
ELEC1249-003
05/05/2025
$42.29 $30.66 $72.95
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
Footnote A below
ELEC1249-003
05/05/2025
$47.57 $31.03 $78.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS...ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN
Footnote A below
ELEC1249-003
05/05/2025
$52.86 $35.60 $88.46
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC Footnote A below ELEC1249-003
05/05/2025
$42.29 $30.66 $72.95
IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION) IRON0006-002
07/01/2024
$34.06 $30.80 $64.86
IRONWORKERS: IRONWORKER (RODMEN) (TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION) IRON0006-002
07/01/2024
$35.49 $32.30 $67.79
IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL,...IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYLAND, WAYNE WOODHULL)
IRON0033-009
07/01/2025
$35.75 $30.80 $66.55
IRONWORKERS: SHEETER (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBAN...IRONWORKERS: SHEETER (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYLAND, WAYNE WOODHULL)
IRON0033-009
07/01/2025
$36.00 $30.80 $66.80
LABORER SUNY1988-001
06/22/1988
$11.02 $2.12 $13.14
LABORER (HEAVY & HIGHWAY), GROUP 1 (ZONE III) LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAM...LABORER (HEAVY & HIGHWAY), GROUP 1 (ZONE III) LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOL; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPER; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATORS (1- 1/2" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS
Footnote A below
LABO0785-022
07/01/2023
$35.26 $23.85 $59.11
LABORER (HEAVY & HIGHWAY), GROUP 2 (ZONE III) ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; BLASTERS; FORM SETTERS; S...LABORER (HEAVY & HIGHWAY), GROUP 2 (ZONE III) ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS
Footnote A below
LABO0785-022
07/01/2023
$35.46 $23.85 $59.31
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL M...OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER 5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM); PILE DRIVER; POWER GRADER WITH ELEVATION LOADER ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL; SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE HYDRAULICALLY OPERATED
Footnote A below
ENGI0158-033
07/01/2025
$41.26 $34.85 $76.11
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED...OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
Footnote NOTE below
ENGI0158-033
07/01/2025
$55.38 $35.75 $91.13
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED)...OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
Footnote NOTE below
ENGI0158-033
07/01/2025
$58.43 $35.00 $93.43
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLAN...OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS) EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS (TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU. YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE MAN; MECHANICAL SLURRY MACHINE; MIXER FOR STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE; PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR SCRAPER; TRACTOR WITH DOZER AND OR PUSHER; TRENCHER; WINCH
Footnote A below
ENGI0158-033
07/01/2025
$40.79 $34.85 $75.64
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST...OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT
Footnote NOTE below
ENGI0158-033
07/01/2025
$54.68 $35.75 $90.43
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTO...OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER); COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT; DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER (UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER (TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; WINCH; WINCH CAT
Footnote NOTE below
ENGI0158-033
07/01/2025
$57.21 $35.00 $92.21
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT...OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT; GUNITE MACHINE; HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO EXCEED 20" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT
Footnote A below
ENGI0158-033
07/01/2025
$40.10 $34.85 $74.95
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK, ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BO...OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK, ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT
Footnote NOTE below
ENGI0158-033
07/01/2025
$51.81 $35.75 $87.56
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): "A" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO E...OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): "A" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT (MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS (HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON); HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED FORM CARRIER; POST HOLE DIGGER AND POST DRIVER; POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER (RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER (RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER (RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER (RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT AGGREGATE PLANT; BOILER (USED IN CONJUNCTION WITH PRODUCTION); CEMENT AND BIN OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE PAVER OR MIXER (16S AND UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN USED FOR PRODUCTION); REVINIUS WIDENER; SHELL WINDER; STEAM CLEANER; TRACTOR
Footnote NOTE below
ENGI0158-033
07/01/2025
$54.42 $35.00 $89.42
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE OR COMB...OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE MIXER (16S AND UNDER), CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER; MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO EXCEED 12" IN TOTAL CAPACITY; REVINIUS WIDENER; STEAM CLEANER; TRACTOR
Footnote A below
ENGI0158-033
07/01/2025
$36.61 $34.85 $71.46
OPERATING ENGINEER: GROUP 4 (HEAVY AND HIGHWAY)TOWER CRANES Footnote NOTE below ENGI0158-033
07/01/2025
$61.38 $35.75 $97.13
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER Footnote NOTE below ENGI0158-033
07/01/2025
$51.41 $35.00 $86.41
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER Footnote NOTE below ENGI0158-033
07/01/2025
$59.88 $35.75 $95.63
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND Footnote NOTE below ENGI0158-033
07/01/2025
$58.38 $35.75 $94.13
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC Footnote NOTE below ENGI0158-033
07/01/2025
$56.81 $35.75 $92.56
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND PAVING). FOR EXCAVATION AND PAVING Footnote A below ENGI0158-033
07/01/2025
$43.26 $34.85 $78.11
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND SHAFT). FOR EXCAVATION AND PAVING Footnote A below ENGI0158-033
07/01/2025
$60.84 $35.00 $95.84
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, CANTON, CORNING, ERWIN, HORNBY, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA AND WAYNE COUNTIES) PLUM0267-001
05/01/2019
$35.51 $24.57 $60.08
ROOFER SUNY1988-001
06/22/1988
$11.62 $3.21 $14.83
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH...TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS; SEMI- TRAILORS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK (TOWNSHIPS OF AVOCA, CANISTEO, COHOCTON, DANSVILLE, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HOWARD, JASPER, PRATTSBURG, PULTENEY, TROUPSBURG, WEST UNION, WHEELER.)
Footnote A below
TEAM0317-004
06/01/2025
$35.48 $31.58 $67.06
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE MOBIL...TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE MOBILE UNIT; OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED (TOWNSHIPS OF AVOCA, CANISTEO, COHOCTON, DANSVILLE, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HOWARD, JASPER, PRATTSBURG, PULTENEY, TROUPSBURG, WEST UNION, WHEELER.)
Footnote A below
TEAM0317-004
06/01/2025
$35.83 $31.58 $67.41
TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) (STEUBEN COUNTY: TOWNS OF ADDISON, AVOCA, BATH, BRADF...TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) (STEUBEN COUNTY: TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND WOODHULL)
Footnote A below
TEAM0529-002
05/01/2025
$25.96 $15.91 $41.87
TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC T...TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TRUCKS; DUMPSTER (TANDEM) (STEUBEN COUNTY: TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND WOODHULL)
Footnote A below
TEAM0529-002
05/01/2025
$26.03 $15.91 $41.94
TRUCK DRIVER: GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; ASPHALT D...TRUCK DRIVER: GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; ASPHALT DISTRIBUTORS; FUEL TRUCK (STEUBEN COUNTY: TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND WOODHULL)
Footnote A below
TEAM0529-002
05/01/2025
$26.52 $15.91 $42.43
Footnotes in NY20260018 (6)
  • ELEC1249-003 A: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY
  • ENGI0158-033 A: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
  • ENGI0158-033 NOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
  • LABO0785-022 A: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
  • TEAM0317-004 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
  • TEAM0529-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

Questions about these rates

What is the Davis-Bacon rate for electricians on highway work in Steuben County?
On WD NY20260018 Mod 1, published May 18, 2026, the row "ELECTRICIAN" is $43.40 base plus $31.72 fringe, $75.12 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on highway work in Steuben County?
On WD NY20260018 Mod 1, published May 18, 2026, the row "PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, CANTON, CORNING, ERWIN, HORNBY, LINDLEY, PULTENEY, RATHBONE, " is $35.51 base plus $24.57 fringe, $60.08 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on highway work in Steuben County?
On WD NY20260018 Mod 1, published May 18, 2026, the row "LABORER (HEAVY & HIGHWAY), GROUP 1 (ZONE III) LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN " is $35.26 base plus $23.85 fringe, $59.11 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as highway construction?
Roads, streets, highways, runways, bridges, parking areas and related work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NY20260018