Davis-Bacon wage rates · New York
Westchester County residential construction wage rates
Federal prevailing wage rates for residential construction in Westchester County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- NY20260017
- Modification
- 2
- Published
- May 18, 2026
- Classifications
- 98
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.
WD NY20260017, Mod 2
Make a WH-347 with these ratesScope as published: Building Construction Projects · Heavy Construction Projects · Highway Construction Projects
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BOILERMAKER Footnote A below | BOIL0005-001 01/01/2025 | $68.88 | $49.83 | $118.71 |
| BRICKLAYER (MARBLE POLISHERS) | BRNY0024-001 06/03/2024 | $52.32 | $36.25 | $88.57 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (BUILDING/RESIDENTIAL CONSTRUCTION) | BRNY0005-007 06/01/2024 | $47.44 | $38.00 | $85.44 |
| BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CAULKERS AND CLEANER (HEAVY & HIGHWAY CONSTRUCTION) | BRNY0005-006 06/01/2023 | $46.39 | $37.45 | $83.84 |
| CARPENTERS (BUILDING) | CARP0279-001 07/01/2025 | $50.12 | $31.73 | $81.85 |
| CARPENTERS: (HEAVY & HIGHWAY) | CARP0279-001 07/01/2025 | $50.12 | $31.73 | $81.85 |
| CARPENTERS: (RESIDENTIAL) | CARP0279-001 07/01/2025 | $32.60 | $20.69 | $53.29 |
| CARPENTERS: (SOFT FLOOR LAYERS) | CARP2287-001 07/01/2025 | $59.05 | $48.08 | $107.13 |
| CARPENTERS: (TIMBERMEN) | CARP1556-011 07/01/2024 | $55.59 | $55.41 | $111.00 |
| DIVER | CARP1556-007 07/01/2024 | $75.46 | $55.84 | $131.30 |
| DIVER TENDER | CARP1556-007 07/01/2024 | $55.00 | $55.84 | $110.84 |
| DOCK BUILDER & PILEDRIVERMEN | CARP1556-009 07/01/2024 | $60.59 | $55.84 | $116.43 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS) GROUND TRUC...ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS) GROUND TRUCK DRIVER (TRACTOR, TRAILER UNIT) | ELEC1249-001 05/05/2025 | $46.79 | $30.98 | $77.77 |
| ELECTRICIAN (LINE CONSTRUCTION) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT (CABLE SPLICER) | ELEC1249-009 01/01/2025 | $40.81 | $6.99 | $47.80 |
| ELECTRICIAN (LINE CONSTRUCTION) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT (GROUNDMAN) | ELEC1249-009 01/01/2025 | $20.53 | $6.39 | $26.92 |
| ELECTRICIAN (LINE CONSTRUCTION) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT (INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR) | ELEC1249-009 01/01/2025 | $38.73 | $6.93 | $45.66 |
| ELECTRICIAN (TELEDATA TECHNICIAN) A. $2.00 PER HOUR NOT TO EXCEED $14.00 PER DAY | ELEC0003-003 04/17/2025 | $58.75 | $60.50 | $119.25 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN Footnote A below | ELEC1249-001 05/05/2025 | $35.09 | $30.11 | $65.20 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUND DIGGING MACHINE OPERATOR Footnote A below | ELEC1249-001 05/05/2025 | $52.64 | $31.58 | $84.22 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUND TRUCK DRIVER Footnote A below | ELEC1249-001 05/05/2025 | $46.79 | $30.98 | $77.77 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: LINEMAN & TECHNICIAN Footnote A below | ELEC1249-001 05/05/2025 | $58.49 | $35.99 | $94.48 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: MECHANIC Footnote A below | ELEC1249-001 05/05/2025 | $46.79 | $30.98 | $77.77 |
ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC ...ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT HAVING GROUND PROTECTION OR FIBER OPTIC CAPABILITIES, MAINTENANCE JOBS OR PROJECTS; RAIL- ROAD CATENARY INSTALLATION AND MAINTENANCE BONDING OF RAILS; OVERHEAD & UNDERGROUND DISTRIBUTION WORK & MAINTENANCE; OVERHEAD AND UNDER- GROUND TRANSMISSION LINE WORK): LINEMAN & TECHNICIAN | ELEC1249-006 05/05/2025 | $58.49 | $35.99 | $94.48 |
ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC ...ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT HAVING GROUND PROTECTION OR FIBER OPTIC CAPABILITIES, MAINTENANCE JOBS OR PROJECTS; RAIL- ROAD CATENARY INSTALLATION AND MAINTENANCE BONDING OF RAILS; OVERHEAD & UNDERGROUND DISTRIBUTION WORK & MAINTENANCE; OVERHEAD AND UNDER- GROUND TRANSMISSION LINE WORK): FLAGMAN | ELEC1249-006 05/05/2025 | $35.09 | $30.11 | $65.20 |
ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC ...ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT HAVING GROUND PROTECTION OR FIBER OPTIC CAPABILITIES, MAINTENANCE JOBS OR PROJECTS; RAIL- ROAD CATENARY INSTALLATION AND MAINTENANCE BONDING OF RAILS; OVERHEAD & UNDERGROUND DISTRIBUTION WORK & MAINTENANCE; OVERHEAD AND UNDER- GROUND TRANSMISSION LINE WORK): GROUNDMAN DIGGING MACHINE OPERATOR | ELEC1249-006 05/05/2025 | $52.64 | $31.58 | $84.22 |
ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC ...ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT HAVING GROUND PROTECTION OR FIBER OPTIC CAPABILITIES, MAINTENANCE JOBS OR PROJECTS; RAIL- ROAD CATENARY INSTALLATION AND MAINTENANCE BONDING OF RAILS; OVERHEAD & UNDERGROUND DISTRIBUTION WORK & MAINTENANCE; OVERHEAD AND UNDER- GROUND TRANSMISSION LINE WORK): GROUNDMAN TRUCK DRIVER | ELEC1249-006 05/05/2025 | $46.79 | $30.98 | $77.77 |
ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC ...ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT HAVING GROUND PROTECTION OR FIBER OPTIC CAPABILITIES, MAINTENANCE JOBS OR PROJECTS; RAIL- ROAD CATENARY INSTALLATION AND MAINTENANCE BONDING OF RAILS; OVERHEAD & UNDERGROUND DISTRIBUTION WORK & MAINTENANCE; OVERHEAD AND UNDER- GROUND TRANSMISSION LINE WORK): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) | ELEC1249-006 05/05/2025 | $49.72 | $31.18 | $80.90 |
ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC ...ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT HAVING GROUND PROTECTION OR FIBER OPTIC CAPABILITIES, MAINTENANCE JOBS OR PROJECTS; RAIL- ROAD CATENARY INSTALLATION AND MAINTENANCE BONDING OF RAILS; OVERHEAD & UNDERGROUND DISTRIBUTION WORK & MAINTENANCE; OVERHEAD AND UNDER- GROUND TRANSMISSION LINE WORK): MECHANIC | ELEC1249-006 05/05/2025 | $46.79 | $30.98 | $77.77 |
| ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR) Footnote A, B below | ELEV0001-002 03/17/2022 | $75.14 | $47.45 | $122.59 |
| ELEVATOR MECHANIC (MODERNIZATION AND REPAIR) Footnote A, B below | ELEV0001-002 03/17/2022 | $59.09 | $45.56 | $104.65 |
| ELEVATOR MECHANIC (WESTCHESTER COUNTY (TOWNS OF BEDFORD, CORTLAND, LEWISBORO, MT. KISCO, NORTH SALEM, POUND RIDGE, SOMERS, AND YORKTOWN)) Footnote A, B below | ELEV0138-003 01/01/2026 | $76.12 | $38.98 | $115.10 |
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | ASBE0091-003 06/02/2025 | $46.62 | $49.30 | $95.92 |
| INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYTEMS) | ASBE0091-003 06/02/2025 | $46.62 | $49.30 | $95.92 |
| IRONWORKER (METALLIC LATHERS AND REINFORCING IRONWORKERS) | IRON0046-003 07/01/2025 | $57.00 | $32.96 | $89.96 |
| IRONWORKER (STONE DERRICKMAN) | IRON0197-001 07/01/2024 | $60.40 | $60.14 | $120.54 |
| IRONWORKER, STRUCTURAL (WESTCHESTER COUNTY) | IRON0040-001 07/01/2025 | $58.95 | $92.02 | $150.97 |
| IRONWORKER: ORNAMENTAL | IRON0580-001 07/01/2025 | $48.15 | $67.62 | $115.77 |
| LABORER (BUILDING) | LABO0235-001 05/01/2025 | $44.05 | $32.40 | $76.45 |
| LABORER (RESIDENTIAL) | LABO0235-002 05/01/2024 | $42.40 | $19.30 | $61.70 |
| LABORERS: GROUP 1 BLASTERS Footnote A below | LABO0060-002 03/30/2025 | $52.11 | $28.98 | $81.09 |
| LABORERS: GROUP 2 BURNER, JUMBO DRILLER, JOY DRILLER, WAGON DRILLER, AIR TRACK DRILLER, HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE FORM AND CURB FORM HIGHWAY (STEEL), ASPHALT SCREEDMAN, ASPHALT RAKER Footnote A below | LABO0060-002 03/30/2025 | $50.71 | $28.98 | $79.69 |
LABORERS: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, CONCRETE SAW, GUNNI...LABORERS: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, CONCRETE SAW, GUNNITING, RAILROAD SPIKE PULLER AND SANDBLASTING, PIPE LAYER, DECK WINCHES ON SCOWS, POWER BUGGY OPERATOR, POWER WHEELBARROW OPERATOR | LABO0060-002 03/30/2025 | $50.29 | $28.98 | $79.27 |
LABORERS: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT GRINDER, CONCRETE G...LABORERS: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT GRINDER, CONCRETE GRINDER, AIR TAMPERS AND ALL TAMPERS NOT COVERED BY ANY OTHER CLASSIFICATION, FORM PIN PULLER, PUMPS AND THEIR OPERATION, SERVICE OF AIR POWER, EPOXY AND WATERPROOFING WORKER, FINE GRADE PERSON BETWEEN FORMS, BARCO RAMMER, GUARD AND GUIDE RAIL AND LINK FENCE, STEEL KINGS | LABO0060-002 03/30/2025 | $49.93 | $28.98 | $78.91 |
| LABORERS: GROUP 5 COMMON LABORERS, SIGNAL PERSON AND PIT PERSON, TRUCK SPOTTERS, POWDER PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON Footnote A below | LABO0060-002 03/30/2025 | $49.56 | $28.98 | $78.54 |
| LABORERS: GROUP 6 FLAGPERSON Footnote A below | LABO0060-002 03/30/2025 | $42.96 | $28.98 | $71.94 |
| LABORERS: GROUP 7 ASBESTOS AND TOXIC WASTE LABORER Footnote A below | LABO0060-002 03/30/2025 | $51.64 | $28.98 | $80.62 |
| MARBLE FINISHER | BRNY0020-001 07/01/2024 | $49.99 | $37.54 | $87.53 |
| MARBLE MASON | BRNY0004-001 07/01/2024 | $63.92 | $40.20 | $104.12 |
| MILLWRIGHT | CARP0740-001 07/01/2025 | $60.83 | $58.03 | $118.86 |
| PAINTER (GLAZIERS) | PAIN0009-003 05/01/2025 | $49.20 | $57.20 | $106.40 |
| PAINTER (PAINTERS, PAPERHANGER, DRYWALL FINISHERS & LEAD ABATEMENT WORKER) | PAIN0009-003 05/01/2025 | $44.75 | $44.11 | $88.86 |
| PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) | PAIN0009-003 05/01/2025 | $47.75 | $44.11 | $91.86 |
| PAINTERS: (STRUCTURAL STEEL AND BRIDGE) | PAIN0806-001 10/01/2024 | $56.25 | $55.14 | $111.39 |
| PLUMBER AND STEAMFITTER (ZONE 1) | PLUM0021-003 05/01/2025 | $65.07 | $45.35 | $110.42 |
| POINTER, CLEANER AND CAULKER | BRNY0001-003 06/01/2018 | $41.96 | $33.38 | $75.34 |
POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERA...POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $68.63 | $35.25 | $103.88 |
POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING & RESIDENTIAL CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCT...POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING & RESIDENTIAL CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $59.04 | $31.32 | $90.36 |
POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIP...POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $60.42 | $35.25 | $95.67 |
POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 2...POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $54.41 | $31.32 | $85.73 |
POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 1...POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $63.70 | $35.25 | $98.95 |
POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING & RESIDENTIAL CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AN...POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING & RESIDENTIAL CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $56.97 | $31.32 | $88.29 |
POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; ...POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $57.84 | $35.25 | $93.09 |
POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% ...POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $59.67 | $35.25 | $94.92 |
POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TY...POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $56.81 | $35.25 | $92.06 |
POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING & RESIDENTIAL CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRI...POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING & RESIDENTIAL CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR). NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $54.88 | $31.32 | $86.20 |
POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE...POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $52.25 | $31.32 | $83.57 |
POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING & RESIDENTIAL CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL ...POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING & RESIDENTIAL CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $54.33 | $31.32 | $85.65 |
POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RA...POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $51.57 | $35.25 | $86.82 |
POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; C...POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $45.94 | $31.32 | $77.26 |
POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WAT...POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $44.19 | $35.25 | $79.44 |
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING & RESIDENTIAL CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) ...POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING & RESIDENTIAL CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $49.53 | $31.32 | $80.85 |
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: R...POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $64.02 | $35.25 | $99.27 |
POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING & RESIDENTIAL CONSTRUCTION) MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OP...POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING & RESIDENTIAL CONSTRUCTION) MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $61.95 | $31.32 | $93.27 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100...POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $64.02 | $35.25 | $99.27 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGAR...POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $77.82 | $35.25 | $113.07 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRAN...POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $75.13 | $35.25 | $110.38 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR...POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $70.41 | $35.25 | $105.66 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HA...POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS).50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE | ENGI0137-006 03/04/2024 | $59.19 | $35.25 | $94.44 |
POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING & RESIDENTIAL CONSTRUCTION) UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERAT...POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING & RESIDENTIAL CONSTRUCTION) UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $47.00 | $31.32 | $78.32 |
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING & RESIDENTIAL CONSTRUCTION) WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERAT...POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING & RESIDENTIAL CONSTRUCTION) WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM.50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y).50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 | ENGI0137-005 03/04/2024 | $49.26 | $31.32 | $80.58 |
| ROOFER | ROOF0008-003 05/01/2025 | $50.25 | $32.62 | $82.87 |
| SHEET METAL WORKER | SHEE0038-001 07/01/2025 | $55.29 | $47.43 | $102.72 |
| SPRINKLER FITTER | SFNY0669-002 01/01/2026 | $57.20 | $32.66 | $89.86 |
| TERRAZZO FINISHER | BRNY0007-001 12/02/2024 | $49.59 | $34.25 | $83.84 |
| TERRAZZO WORKER/SETTER | BRNY0007-001 12/02/2024 | $64.62 | $37.63 | $102.25 |
| TILE FINISHER | BRNY0007-002 12/02/2024 | $49.59 | $34.25 | $83.84 |
| TILE LAYER | BRNY0052-001 06/03/2024 | $64.40 | $37.13 | $101.53 |
| TRUCK DRIVERS: GROUP 1 LOWBOY (CARRYING EQUIPMENT) HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $51.26 | $38.93 | $90.19 |
| TRUCK DRIVERS: GROUP 10 OFF ROAD EQUIPMENT (OVER 40 TONS) EUCLID, DJB HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.51 | $38.93 | $89.44 |
| TRUCK DRIVERS: GROUP 11 OFF ROAD EQUIPMENT (UNDER 40 TONS) DJB HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.26 | $38.93 | $89.19 |
TRUCK DRIVERS: GROUP 2 STRAIGHT JOBS: 6-WHEELER, 10-WHEELER, A-FRAME TRUCKS (INSIDE CAB), WINCH TRUCK (INSIDE CAB), DYNAMITE TRUCK, SEEDING TRUCK, MULCHING TRUCK, AGITATOR TRUCK, WATER TRUCK, CEMENT T...TRUCK DRIVERS: GROUP 2 STRAIGHT JOBS: 6-WHEELER, 10-WHEELER, A-FRAME TRUCKS (INSIDE CAB), WINCH TRUCK (INSIDE CAB), DYNAMITE TRUCK, SEEDING TRUCK, MULCHING TRUCK, AGITATOR TRUCK, WATER TRUCK, CEMENT TRUCKS (ALL TYPES), SUBURBANS, STATION WAGONS, CARS, PICKUPS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION | TEAM0456-001 07/01/2025 | $48.51 | $38.93 | $87.44 |
| TRUCK DRIVERS: GROUP 3 FUEL AND TIRE TRUCKS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $48.96 | $38.93 | $87.89 |
| TRUCK DRIVERS: GROUP 4 TRACTOR TRAILERS (ALL TYPES) HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $49.13 | $38.93 | $88.06 |
| TRUCK DRIVERS: GROUP 6 ATHEY WAGON, BELLY DUMPS, ARTICULATED DUMPS, TRAILER WAGONS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $49.26 | $38.93 | $88.19 |
| TRUCK DRIVERS: GROUP 7 DARTS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.01 | $38.93 | $88.94 |
| TRUCK DRIVERS: GROUP 8 RXS HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $50.38 | $38.93 | $89.31 |
| TRUCK DRIVERS: GROUP 9 OFF ROAD EQUIPMENT (UNDER 40 TONS): EUCLID HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $49.88 | $38.93 | $88.81 |
| TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCION- GROUP 5 14 WHEELER. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION Footnote A below | TEAM0456-001 07/01/2025 | $48.63 | $38.93 | $87.56 |
Footnotes in NY20260017 (11)
- BOIL0005-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE
- ELEC1249-001 A: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNTIED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE AND TWO DAYS AFTER THE HOLIDAY
- ELEC1249-006 A: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY
- ELEV0001-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.
- ELEV0001-002 B: PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED
- ELEV0138-003 A: VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
- ELEV0138-003 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
- ENGI0137-005 A: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY
- ENGI0137-006 A: PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY
- LABO0060-002 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY
- TEAM0456-001 A: PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL
Questions about these rates
What is the Davis-Bacon rate for electricians on residential work in Westchester County?
What is the Davis-Bacon rate for plumbers on residential work in Westchester County?
What is the Davis-Bacon rate for carpenters on residential work in Westchester County?
Which wage determination applies to my project?
What counts as residential construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with NY20260017