Davis-Bacon wage rates · New York

Yates County building construction wage rates

Federal prevailing wage rates for building construction in Yates County, New York, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
NY20260073
Modification
2
Published
May 18, 2026
Classifications
34
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See New York prevailing wage for how the two fit together.

WD NY20260073, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 34 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in NY20260073 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BOILERMAKER BOIL0007-002
01/01/2025
$39.35 $33.18 $72.53
BRICKLAYER (ROCHESTER CHAPTER) BRNY0003-026
07/01/2025
$35.81 $27.65 $63.46
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK CARP0277-022
07/01/2025
$32.64 $21.97 $54.61
CEMENT MASON/CONCRETE FINISHER SUNY2009-033
09/30/2009
$20.32 $8.84 $29.16
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR PHONES, ALARMS AND HVAC TEMPERATURE CONTROLS & INSTALLATION OF ALARMS, PHONES AND COMPUTERS) ELEC0840-010
06/01/2025
$45.00 $31.12 $76.12
ELEVATOR MECHANIC Footnote A, B below ELEV0027-005
01/01/2025
$61.52 $38.44 $99.96
GLAZIER PAIN0677-001
05/01/2025
$31.05 $31.55 $62.60
INSULATOR - PIPE & PIPEWRAPPER SUNY2009-033
09/30/2009
$27.72 $9.00 $36.72
IRONWORKER-FENCE ERECTOR IRON0033-007
07/01/2025
$35.75 $30.80 $66.55
IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL IRON0033-007
07/01/2025
$35.75 $30.80 $66.55
LABORER (COMMON OR GENERAL; GRADE CHECKER; BRICK MASON TENDER; CEMENT/CONCRETE MASON TENDER; MORTAR MIXER) Footnote A below LABO0435-014
05/01/2023
$29.07 $21.49 $50.56
LABORER LANDSCALE Footnote A below LABO0435-014
05/01/2023
$26.22 $21.49 $47.71
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) SUNY2009-033
09/30/2009
$18.70 $8.28 $26.98
LABORER: ASPHALT SHOVELER SUNY2009-033
09/30/2009
$20.89 $8.95 $29.84
LABORER: PIPELAYER SUNY2009-033
09/30/2009
$21.06 $14.30 $35.36
OPERATOR: AUGER SUNY2009-033
09/30/2009
$21.19 $15.85 $37.04
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) SUNY2009-033
09/30/2009
$23.59 $9.95 $33.54
OPERATOR: ROLLER SUNY2009-033
09/30/2009
$24.15 $17.01 $41.16
PAINTER: BRUSH & ROLLER PAIN0004-051
05/01/2024
$27.00 $26.00 $53.00
PAINTER: SPRAY PAIN0004-051
05/01/2024
$27.60 $26.00 $53.60
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION PLUM0013-007
05/06/2025
$42.68 $27.88 $70.56
PLUMBER SUNY2009-033
09/30/2009
$27.15 $12.47 $39.62
POWER EQUIPMENT OPERATOR: BACKHOE TRACTOR MOUNTED, RUBBER TIRED Footnote A below ENGI0158-015
07/01/2025
$42.34 $35.20 $77.54
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER; CRANE OILER; LOADER Footnote A below ENGI0158-015
07/01/2025
$42.34 $35.20 $77.54
POWER EQUIPMENT OPERATOR: BULLDOZER; CONCRETE PUMP, TRUCK MOUNTED; CRANE; DRILL; EXCAVATOR Footnote A below ENGI0158-015
07/01/2025
$42.34 $35.20 $77.54
POWER EQUIPMENT OPERATOR: EXCEPT TRACTOR-MOUNTED, RUBBER TIRED (BACKHOE) Footnote A below ENGI0158-015
07/01/2025
$43.14 $35.20 $78.34
POWER EQUIPMENT OPERATOR: FORKLIFT FACTORY RATED 15 FEET & OVER Footnote A below ENGI0158-015
07/01/2025
$42.34 $35.20 $77.54
POWER EQUIPMENT OPERATOR: FORKLIFT FACTORY RATED UNDER 15 FEET Footnote A below ENGI0158-015
07/01/2025
$42.34 $35.20 $77.54
ROOFER, INCLUDES ROOF TEAR OFF, AND INSTALLATION OF MODIFIED BITUMEN, RUBBER, SHAKE & SHINGLE, AND SINGLE PLY ROOFS ROOF0022-003
06/01/2025
$34.10 $28.20 $62.30
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION SHEE0046-005
05/05/2025
$43.01 $28.66 $71.67
SPRINKLER FITTER (FIRE SPRINKLERS) SFNY0669-006
01/01/2026
$45.06 $30.71 $75.77
TILE FINISHER (ROCHESTER CHAPTER) BRNY0003-026
07/01/2025
$31.06 $22.92 $53.98
TILE SETTER SUNY2009-033
09/30/2009
$24.02 $0.00 $24.02
TRUCK DRIVER: DUMP TRUCK SUNY2009-033
09/30/2009
$16.00 $2.62 $18.62
Footnotes in NY20260073 (4)
  • ELEV0027-005 A: VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
  • ELEV0027-005 B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
  • ENGI0158-015 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY
  • LABO0435-014 A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

Questions about these rates

What is the Davis-Bacon rate for plumbers on building work in Yates County?
On WD NY20260073 Mod 2, published May 18, 2026, the row "PLUMBER" is $27.15 base plus $12.47 fringe, $39.62 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Yates County?
On WD NY20260073 Mod 2, published May 18, 2026, the row "CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK" is $32.64 base plus $21.97 fringe, $54.61 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on building work in Yates County?
On WD NY20260073 Mod 2, published May 18, 2026, the row "LABORER (COMMON OR GENERAL; GRADE CHECKER; BRICK MASON TENDER; CEMENT/CONCRETE MASON TENDER; MORTAR MIXER)" is $29.07 base plus $21.49 fringe, $50.56 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with NY20260073

Other counties: all New York counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.