Davis-Bacon wage rates · Ohio

Brown County building construction wage rates

Federal prevailing wage rates for building construction in Brown County, Ohio, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
OH20260070
Modification
1
Published
May 18, 2026
Classifications
38
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Ohio prevailing wage for how the two fit together.

WD OH20260070, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 38 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in OH20260070 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKER/HEAT & FROST INSULATOR ASBE0008-010
03/01/2025
$35.23 $23.04 $58.27
BRICKLAYER BROH0018-008
06/01/2024
$35.00 $17.13 $52.13
CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) CARP0002-008
06/01/2024
$32.26 $19.10 $51.36
CARPENTER (FORM WORK ONLY) CARP0002-016
06/01/2024
$32.26 $19.10 $51.36
CARPENTER (INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION; EXCLUDES ACOUSTICAL CEILING INSTALLATION AND FORM WORK) CARP0002-019
06/01/2024
$32.26 $19.10 $51.36
CEMENT MASON/CONCRETE FINISHER PLAS0132-018
06/01/2025
$33.50 $16.05 $49.55
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) ELEC0212-001
06/02/2025
$38.05 $22.97 $61.02
ELECTRICIAN (LOW VOLTAGE WIRING ONLY) ELEC0212-011
06/02/2025
$38.05 $22.97 $61.02
ELEVATOR MECHANIC Footnote A, B below ELEV0011-002
01/01/2025
$57.41 $38.44 $95.85
GLAZIER PAIN0387-002
11/01/2023
$31.95 $18.20 $50.15
IRONWORKER, REINFORCING IRON0044-003
06/01/2025
$38.27 $23.90 $62.17
IRONWORKER: ORNAMENTAL AND STRUCTURAL IRON0044-019
06/01/2025
$37.77 $23.90 $61.67
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR SUOH2012-072
08/29/2014
$26.19 $8.99 $35.18
LABORER: COMMON OR GENERAL LABO0265-017
06/01/2025
$27.30 $18.75 $46.05
LABORER: LANDSCAPE & IRRIGATION SUOH2012-072
08/29/2014
$23.60 $0.87 $24.47
LABORER: MASON TENDER - BRICK LABO0265-019
06/01/2025
$26.60 $18.75 $45.35
LABORER: MASON TENDER - CEMENT/CONCRETE SUOH2012-072
08/29/2014
$23.87 $9.80 $33.67
LABORER: PIPELAYER SUOH2012-072
08/29/2014
$23.18 $8.95 $32.13
OPERATOR: LOADER SUOH2012-072
08/29/2014
$29.66 $12.61 $42.27
OPERATOR: OILER UAVGOH0021
01/01/2019
$27.56 $16.37 $43.93
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) SUOH2012-072
08/29/2014
$30.28 $13.29 $43.57
OPERATOR: ROLLER SUOH2012-072
08/29/2014
$29.85 $12.00 $41.85
PAINTER: BRUSH AND ROLLER PAIN0123-001
05/01/2024
$28.29 $13.75 $42.04
PAINTER: SPRAY SUOH2012-072
08/29/2014
$22.78 $12.40 $35.18
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES HVAC UNIT INSTALLATION) PLUM0392-004
06/01/2025
$43.30 $27.40 $70.70
PLASTERER PLAS0132-019
07/01/2025
$31.35 $17.65 $49.00
PLUMBER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) PLUM0392-004
06/01/2025
$43.30 $27.40 $70.70
POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE) ENGI0018-036
05/01/2024
$44.14 $16.41 $60.55
POWER EQUIPMENT OPERATOR (MECHANIC) ENGI0066-045
06/01/2017
$32.92 $19.66 $52.58
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER ENGI0018-037
05/01/2024
$44.14 $16.41 $60.55
POWER EQUIPMENT OPERATOR: FORKLIFT ENGI0066-045
06/01/2017
$28.87 $19.66 $48.53
POWER EQUIPMENT OPERATOR: GRADER/BLADE ENGI0066-045
06/01/2017
$32.42 $19.66 $52.08
ROOFER ROOF0042-007
08/01/2025
$34.38 $19.94 $54.32
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION ONLY) SHEE0024-029
06/01/2023
$34.32 $23.77 $58.09
SPRINKLER FITTER (FIRE SPRINKLERS) SFOH0669-009
04/01/2025
$48.28 $28.08 $76.36
TILE FINISHER BROH0018-008
06/01/2024
$27.87 $16.31 $44.18
TILE SETTER BROH0018-008
06/01/2024
$32.41 $16.36 $48.77
TRUCK DRIVER: DUMP (ALL TYPES) SUOH2012-072
08/29/2014
$24.32 $11.73 $36.05
Footnotes in OH20260070 (2)
  • ELEV0011-002 A: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.
  • ELEV0011-002 B: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE

Questions about these rates

What is the Davis-Bacon rate for plumbers on building work in Brown County?
On WD OH20260070 Mod 1, published May 18, 2026, the row "PLUMBER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION)" is $43.30 base plus $27.40 fringe, $70.70 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Brown County?
On WD OH20260070 Mod 1, published May 18, 2026, the row "CARPENTER (FORM WORK ONLY)" is $32.26 base plus $19.10 fringe, $51.36 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on building work in Brown County?
On WD OH20260070 Mod 1, published May 18, 2026, the row "LABORER: COMMON OR GENERAL" is $27.30 base plus $18.75 fringe, $46.05 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with OH20260070

Other counties: all Ohio counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.