Davis-Bacon wage rates · Ohio
Tuscarawas County building construction wage rates
Federal prevailing wage rates for building construction in Tuscarawas County, Ohio, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- OH20260058
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 27
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Ohio prevailing wage for how the two fit together.
WD OH20260058, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | ASBE0002-003 08/01/2024 | $46.50 | $29.43 | $75.93 |
| BRICKLAYER | BROH0006-001 05/01/2024 | $35.59 | $22.71 | $58.30 |
| CARPENTER | SUOH2012-060 08/29/2014 | $25.75 | $12.99 | $38.74 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0132-011 06/01/2025 | $35.12 | $17.40 | $52.52 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | ELEC0972-006 06/01/2024 | $40.00 | $33.32 | $73.32 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | ELEC0540-001 08/28/2023 | $25.15 | $17.44 | $42.59 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | IRON0550-008 05/01/2025 | $36.00 | $23.57 | $59.57 |
| IRONWORKER: REINFORCING | UAVGOH0016 01/01/2018 | $29.10 | $19.73 | $48.83 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | LABO0083-004 06/01/2024 | $40.97 | $14.10 | $55.07 |
| LABORER: COMMON OR GENERAL | LABO0134-003 05/01/2024 | $31.23 | $12.95 | $44.18 |
| LABORER: MASON TENDER - BRICK | LABO0134-002 05/01/2024 | $32.16 | $12.95 | $45.11 |
| LABORER: PIPELAYER | SUOH2012-060 08/29/2014 | $18.37 | $4.79 | $23.16 |
| OPERATOR: LOADER | SUOH2012-060 08/29/2014 | $22.69 | $8.01 | $30.70 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUOH2012-060 08/29/2014 | $23.91 | $10.42 | $34.33 |
| PAINTER: BRUSH AND ROLLER | PAIN0093-003 12/01/2024 | $30.28 | $24.46 | $54.74 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | PLUM0495-007 06/01/2025 | $34.73 | $37.60 | $72.33 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | PLUM0495-007 06/01/2025 | $34.73 | $37.60 | $72.33 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; CRANE) | ENGI0018-025 05/01/2024 | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; BULLDOZER) | ENGI0018-025 05/01/2024 | $44.02 | $16.41 | $60.43 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | ENGI0018-025 05/01/2024 | $42.98 | $16.41 | $59.39 |
| ROOFER | UAVGOH0017 01/01/2019 | $29.59 | $15.17 | $44.76 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | SHEE0033-015 07/01/2024 | $35.52 | $29.87 | $65.39 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | SHEE0024-024 06/01/2022 | $33.53 | $26.36 | $59.89 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SFOH0669-009 04/01/2025 | $48.28 | $28.08 | $76.36 |
| TILE FINISHER | BROH0046-004 09/01/2023 | $27.87 | $16.31 | $44.18 |
| TILE SETTER | BROH0046-004 09/01/2023 | $32.41 | $16.36 | $48.77 |
| TRUCK DRIVER: DUMP (ALL TYPES) | SUOH2012-060 08/29/2014 | $19.33 | $6.55 | $25.88 |
Questions about these rates
What is the Davis-Bacon rate for plumbers on building work in Tuscarawas County?
What is the Davis-Bacon rate for carpenters on building work in Tuscarawas County?
What is the Davis-Bacon rate for laborers on building work in Tuscarawas County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with OH20260058
Other counties: all Ohio counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.