Davis-Bacon wage rates · Pennsylvania

Indiana County building construction wage rates

Federal prevailing wage rates for building construction in Indiana County, Pennsylvania, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
PA20260055
Modification
5
Published
September 24, 2026
Classifications
41
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Pennsylvania prevailing wage for how the two fit together.

WD PA20260055, Mod 5

Make a WH-347 with these rates
Published September 24, 2026 41 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in PA20260055 Mod 5, published 09/24/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKER/HEAT & FROST INSULATOR (INDUSTRIAL; MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) ASBE0002-006
08/01/2024
$46.50 $29.43 $75.93
BOILERMAKER BOIL0154-007
01/01/2025
$48.28 $33.17 $81.45
BRICKLAYER (BRICK REFRACTORY/BRICK PLACEMENT WORKER ONLY) BRPA0009-052
12/01/2022
$37.30 $24.46 $61.76
BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) BRPA0009-052
12/01/2022
$36.55 $24.46 $61.01
CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-VINYL, FORM WORK, ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-HARDWOOD AND CARPET, AND SCAFFOLD BUILDING) CARP0423-014
06/01/2025
$34.76 $20.64 $55.40
CEMENT MASON/CONCRETE FINISHER PLAS0526-015
06/01/2021
$31.77 $21.89 $53.66
ELECTRICIAN (ALARM INSTALLATION ONLY) ELEC0712-007
12/29/2025
$51.45 $29.77 $81.22
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) SUPA2011-013
08/20/2014
$29.05 $16.89 $45.94
ELECTRICIAN (INCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION AND ALARM INSTALLATION) ELEC0005-015
12/26/2025
$49.11 $36.79 $85.90
GLAZIER PAIN0751-002
09/01/2023
$25.40 $25.47 $50.87
IRONWORKER (METAL ROOF INSTALLATION ONLY) IRON0207-009
06/01/2025
$36.26 $28.16 $64.42
IRONWORKER, RIGGER IRON0003-018
06/01/2023
$38.89 $34.54 $73.43
IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL IRON0003-026
06/01/2023
$38.89 $34.54 $73.43
LABORER (COMMON OR GENERAL; CONCRETE WORKER) LABO0910-005
01/01/2024
$26.82 $19.39 $46.21
LABORER: MASON TENDER - BRICK UAVGPA0002
01/01/2025
$23.23 $18.53 $41.76
LABORER: MASON TENDER - CEMENT/CONCRETE SUPA2011-013
08/20/2014
$18.41 $6.45 $24.86
MASON - STONE BRPA0009-052
12/01/2022
$36.55 $24.46 $61.01
MECHANICAL INSULATOR, INCLUDING DUCT AND PIPE AND EXCLUDING WORK ON INDUSTRIAL SITES SUPA2011-013
08/20/2014
$30.60 $17.16 $47.76
MILLWRIGHT CARP0443-004
06/01/2026
$49.00 $26.29 $75.29
OPERATOR: HIGHLIFT UAVGPA0009
01/01/2025
$31.19 $22.01 $53.20
OPERATOR: MECHANIC UAVGPA0004
01/01/2025
$36.53 $22.01 $58.54
PAINTER (INDUSTRIAL: SPRAY ONLY) PAIN0057-031
06/01/2023
$36.01 $23.72 $59.73
PAINTER (SPRAY ONLY, EXCLUDES WORK ON INDUSTRIAL SITES) PAIN0041-003
05/01/2014
$27.95 $16.12 $44.07
PAINTER: BRUSH AND ROLLER ONLY PAIN0057-001
06/01/2023
$30.56 $23.72 $54.28
PAINTER: DRYWALL FINISHING/TAPING ONLY PAIN0057-001
06/01/2023
$32.39 $23.26 $55.65
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES) PLUM0354-021
06/01/2024
$40.02 $26.55 $66.57
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) PLUM0449-003
06/01/2024
$48.15 $29.17 $77.32
PIPEFITTER (INDUSTRIAL) PLUM0354-008
06/01/2024
$47.75 $26.55 $74.30
PLASTERER PLAS0526-026
06/01/2021
$30.69 $18.99 $49.68
PLUMBER PLUM0354-015
06/01/2024
$40.02 $26.55 $66.57
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, CRANE*, DRILL RIG CAISSONS, MAN LIFT/OUTSIDE ELEVATOR *ADD TO ...POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, CRANE*, DRILL RIG CAISSONS, MAN LIFT/OUTSIDE ELEVATOR *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25
ENGI0066-038
06/01/2024
$41.69 $24.05 $65.74
POWER EQUIPMENT OPERATOR: LOADER ENGI0066-038
06/01/2024
$41.69 $24.05 $65.74
POWER EQUIPMENT OPERATOR: OILER ENGI0066-038
06/01/2024
$32.83 $24.05 $56.88
POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) ENGI0066-038
06/01/2024
$35.62 $24.05 $59.67
ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS SUPA2011-013
08/20/2014
$24.13 $11.95 $36.08
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION, EXCLUDES METAL FLASHING INSTALLATION) SHEE0012-009
07/01/2026
$46.75 $35.93 $82.68
SHEET METAL WORKER (METAL FLASHING INSTALLATION ONLY) SUPA2011-013
08/20/2014
$31.43 $20.05 $51.48
SPRINKLER FITTER (FIRE SPRINKLERS) SFPA0669-004
01/01/2026
$49.75 $30.26 $80.01
TILE FINISHER BRPA0009-011
12/01/2022
$28.76 $17.16 $45.92
TILE SETTER BRPA0009-011
12/01/2022
$35.64 $21.63 $57.27
TRUCK DRIVER: DUMP TRUCK SUPA2011-013
08/20/2014
$24.98 $11.88 $36.86

Questions about these rates

What is the Davis-Bacon rate for electricians on building work in Indiana County?
On WD PA20260055 Mod 5, published September 24, 2026, the row "ELECTRICIAN (ALARM INSTALLATION ONLY)" is $51.45 base plus $29.77 fringe, $81.22 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on building work in Indiana County?
On WD PA20260055 Mod 5, published September 24, 2026, the row "PLUMBER" is $40.02 base plus $26.55 fringe, $66.57 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Indiana County?
On WD PA20260055 Mod 5, published September 24, 2026, the row "CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-VINYL, FORM WORK, ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-HARDWOOD AND CARPET, " is $34.76 base plus $20.64 fringe, $55.40 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with PA20260055

Other counties: all Pennsylvania counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.