Davis-Bacon wage rates · Pennsylvania
Lackawanna County building construction wage rates
Federal prevailing wage rates for building construction in Lackawanna County, Pennsylvania, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- PA20260091
- Modification
- 3
- Published
- May 18, 2026
- Classifications
- 37
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Pennsylvania prevailing wage for how the two fit together.
WD PA20260091, Mod 3
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | ASBE0038-006 07/01/2025 | $39.18 | $26.07 | $65.25 |
| BOILERMAKER | BOIL0013-008 01/01/2025 | $55.00 | $35.48 | $90.48 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | BRPA0005-078 05/01/2022 | $37.07 | $18.82 | $55.89 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, AND FORM WORK) | CARP0261-011 05/01/2025 | $36.57 | $20.04 | $56.61 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0592-038 06/01/2023 | $37.13 | $14.30 | $51.43 |
| ELECTRICIAN (INCLUDING INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, HVAC/TEMPERATURE CONTROLS AND LOW VOLTAGE WIRING) | ELEC0081-009 06/01/2025 | $47.97 | $23.29 | $71.26 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0084-005 01/01/2025 | $61.41 | $38.44 | $99.85 |
| IRONWORKER (ORNAMENTAL, STRUCTURAL, & REINFORCING) | IRON0404-028 07/01/2024 | $37.26 | $32.63 | $69.89 |
| LABORER (ASBESTOS ABATEMENT: REMOVAL FROM FLOORS, WALLS, CEILINGS AND MECHANICAL SYSTEMS) | LABO0130-010 05/01/2016 | $22.70 | $16.13 | $38.83 |
| LABORER (COMMON OR GENERAL; CONCRETE WORKER) | LABO0130-010 05/01/2016 | $20.70 | $16.13 | $36.83 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | LABO0130-010 05/01/2016 | $24.87 | $16.13 | $41.00 |
| LABORER (MASON TENDER: BRICK, CEMENT/CONCRETE, STONE) | LABO0130-010 05/01/2016 | $23.37 | $16.13 | $39.50 |
| LABORER (SCAFFOLD BUILDER (BRICK AND MASONRY ONLY)) | LABO0130-010 05/01/2016 | $23.47 | $16.13 | $39.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | UAVGPA0020 01/01/2025 | $27.89 | $19.81 | $47.70 |
| MASON - STONE | BRPA0005-078 05/01/2022 | $37.07 | $18.82 | $55.89 |
| OPERATOR: DRILL | SUPA2011-049 08/20/2014 | $28.55 | $15.78 | $44.33 |
| OPERATOR: GRADALL | SUPA2011-049 08/20/2014 | $32.70 | $18.43 | $51.13 |
| OPERATOR: GRADER/BLADE | SUPA2011-049 08/20/2014 | $32.51 | $17.98 | $50.49 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUPA2011-049 08/20/2014 | $33.01 | $18.37 | $51.38 |
| PAINTER (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING) | PAIN0041-002 05/01/2014 | $27.95 | $16.12 | $44.07 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | PLUM0524-012 12/01/2025 | $51.69 | $27.07 | $78.76 |
| PLUMBER | PLUM0524-011 12/01/2025 | $51.69 | $27.07 | $78.76 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/ SKID STEER/ SKID LOADER) | ENGI0542-037 05/01/2025 | $44.61 | $30.83 | $75.44 |
| POWER EQUIPMENT OPERATOR (BULLDOZER, HOIST, LOADER, MECHANIC) | ENGI0542-037 05/01/2025 | $44.61 | $30.83 | $75.44 |
| POWER EQUIPMENT OPERATOR (CRANE, FORKLIFT (LULL OR SIMILAR, EXCLUDES MASONRY WORK)) | ENGI0542-037 05/01/2025 | $47.14 | $31.58 | $78.72 |
| POWER EQUIPMENT OPERATOR (FORKLIFT (20 FT AND OVER); CONCRETE PUMP) | ENGI0542-037 05/01/2025 | $44.61 | $30.83 | $75.44 |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | ENGI0542-037 05/01/2025 | $41.88 | $30.03 | $71.91 |
| POWER EQUIPMENT OPERATOR (OILER) | ENGI0542-037 05/01/2025 | $39.42 | $29.30 | $68.72 |
| POWER EQUIPMENT OPERATOR (PUMP) | ENGI0066-046 06/01/2014 | $28.36 | $18.10 | $46.46 |
| POWER EQUIPMENT OPERATOR: ROLLER | ENGI0542-037 05/01/2025 | $40.74 | $29.70 | $70.44 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | ROOF0030-004 05/01/2024 | $34.25 | $21.89 | $56.14 |
| ROOFER: WATERPROOFING ONLY | SUPA2011-049 08/20/2014 | $28.60 | $18.02 | $46.62 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | SHEE0044-010 05/01/2024 | $36.13 | $30.32 | $66.45 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SFPA0669-004 01/01/2026 | $49.75 | $30.26 | $80.01 |
| TILE FINISHER | BRPA0005-072 05/01/2022 | $32.62 | $15.62 | $48.24 |
| TILE SETTER | BRPA0005-072 05/01/2022 | $35.13 | $16.52 | $51.65 |
| TRUCK DRIVER: DUMP TRUCK | SUPA2011-049 08/20/2014 | $23.36 | $7.60 | $30.96 |
Footnotes in PA20260091 (2)
- ELEV0084-005 A: VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.
- ELEV0084-005 B: EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY
Questions about these rates
What is the Davis-Bacon rate for plumbers on building work in Lackawanna County?
What is the Davis-Bacon rate for carpenters on building work in Lackawanna County?
What is the Davis-Bacon rate for laborers on building work in Lackawanna County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with PA20260091
Other counties: all Pennsylvania counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.