Davis-Bacon wage rates · Texas
Bandera County heavy construction wage rates
Federal prevailing wage rates for heavy construction in Bandera County, Texas, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260007
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 50
- Other types here
- Building, Residential, Highway
2 wage determinations cover heavy work in Bandera County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
1 of 2: WD TX20260007, Mod 1
Make a WH-347 with these ratesScope as published: HEAVY (excluding tunnels and dams, not to be used for work on Sewage or Water Treatment Plants or Lift / Pump Stations in Bell, Coryell, McLennan and Williamson Counties) Construction Projects
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (PAVING AND STRUCTURES) | SUTX2011-006 08/03/2011 | $12.56 | $0.00 | $12.56 |
| ELECTRICIAN | SUTX2011-006 08/03/2011 | $26.35 | $0.00 | $26.35 |
| FORM BUILDER/FORM SETTER (PAVING & CURB) | SUTX2011-006 08/03/2011 | $12.94 | $0.00 | $12.94 |
| FORM BUILDER/FORM SETTER (STRUCTURES) | SUTX2011-006 08/03/2011 | $12.87 | $0.00 | $12.87 |
| LABORER (FLAGGER) | SUTX2011-006 08/03/2011 | $9.45 | $0.00 | $9.45 |
| LABORER (LABORER, COMMON) | SUTX2011-006 08/03/2011 | $10.50 | $0.00 | $10.50 |
| LABORER (LABORER, UTILITY) | SUTX2011-006 08/03/2011 | $12.27 | $0.00 | $12.27 |
| LABORER (WORK ZONE BARRICADE SERVICER) | SUTX2011-006 08/03/2011 | $11.85 | $0.00 | $11.85 |
| LABORER: ASPHALT RAKER | SUTX2011-006 08/03/2011 | $12.12 | $0.00 | $12.12 |
| LABORER: PIPELAYER | SUTX2011-006 08/03/2011 | $12.79 | $0.00 | $12.79 |
| PAINTER (STRUCTURES) | SUTX2011-006 08/03/2011 | $18.34 | $0.00 | $18.34 |
| POWER EQUIPMENT OPERATOR: (AGRICULTURAL TRACTOR) | SUTX2011-006 08/03/2011 | $12.69 | $0.00 | $12.69 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | SUTX2011-006 08/03/2011 | $14.36 | $0.00 | $14.36 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVEMENT FINISHING MACHINE) | SUTX2011-006 08/03/2011 | $15.48 | $0.00 | $15.48 |
| POWER EQUIPMENT OPERATOR: (CRANE, HYDRAULIC 80 TONS OR LESS) | SUTX2011-006 08/03/2011 | $18.36 | $0.00 | $18.36 |
| POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS) | SUTX2011-006 08/03/2011 | $15.87 | $0.00 | $15.87 |
| POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM OVER 80 TONS) | SUTX2011-006 08/03/2011 | $19.38 | $0.00 | $19.38 |
| POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING LOCATOR) | SUTX2011-006 08/03/2011 | $11.67 | $0.00 | $11.67 |
| POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING OPERATOR) | SUTX2011-006 08/03/2011 | $17.24 | $0.00 | $17.24 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR 50,000 LBS OR LESS) | SUTX2011-006 08/03/2011 | $12.88 | $0.00 | $12.88 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR OVER 50,000 LBS) | SUTX2011-006 08/03/2011 | $17.71 | $0.00 | $17.71 |
| POWER EQUIPMENT OPERATOR: (FRONT END LOADER, OVER 3 CY) | SUTX2011-006 08/03/2011 | $13.21 | $0.00 | $13.21 |
| POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE) | SUTX2011-006 08/03/2011 | $14.12 | $0.00 | $14.12 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | SUTX2011-006 08/03/2011 | $14.18 | $0.00 | $14.18 |
| POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE) | SUTX2011-006 08/03/2011 | $19.17 | $0.00 | $19.17 |
| POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER) | SUTX2011-006 08/03/2011 | $12.88 | $0.00 | $12.88 |
| POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT) | SUTX2011-006 08/03/2011 | $12.78 | $0.00 | $12.78 |
| POWER EQUIPMENT OPERATOR: (ROLLER, OTHER) | SUTX2011-006 08/03/2011 | $10.50 | $0.00 | $10.50 |
| POWER EQUIPMENT OPERATOR: (SPREADER BOX) | SUTX2011-006 08/03/2011 | $14.04 | $0.00 | $14.04 |
| POWER EQUIPMENT OPERATOR: (TRENCHING MACHINE, HEAVY) | SUTX2011-006 08/03/2011 | $18.48 | $0.00 | $18.48 |
| POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR | SUTX2011-006 08/03/2011 | $15.55 | $0.00 | $15.55 |
| POWER EQUIPMENT OPERATOR: BOOM TRUCK | SUTX2011-006 08/03/2011 | $18.36 | $0.00 | $18.36 |
| POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER | SUTX2011-006 08/03/2011 | $11.04 | $0.00 | $11.04 |
| POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR | SUTX2011-006 08/03/2011 | $15.67 | $0.00 | $15.67 |
| POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED | SUTX2011-006 08/03/2011 | $16.93 | $0.00 | $16.93 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS | SUTX2011-006 08/03/2011 | $13.04 | $0.00 | $13.04 |
| POWER EQUIPMENT OPERATOR: MECHANIC | SUTX2011-006 08/03/2011 | $17.10 | $0.00 | $17.10 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE | SUTX2011-006 08/03/2011 | $18.51 | $0.00 | $18.51 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH | SUTX2011-006 08/03/2011 | $14.63 | $0.00 | $14.63 |
| POWER EQUIPMENT OPERATOR: SCRAPER | SUTX2011-006 08/03/2011 | $12.27 | $0.00 | $12.27 |
| SERVICER | SUTX2011-006 08/03/2011 | $14.51 | $0.00 | $14.51 |
| STEEL WORKER (REINFORCING) | SUTX2011-006 08/03/2011 | $14.00 | $0.00 | $14.00 |
| STEEL WORKER (STRUCTURAL) | SUTX2011-006 08/03/2011 | $19.29 | $0.00 | $19.29 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION, (TRAFFIC SIGNAL/LIGHT POLE WORKER) | SUTX2011-006 08/03/2011 | $16.00 | $0.00 | $16.00 |
| TRUCK DRIVER (LOWBOY-FLOAT) | SUTX2011-006 08/03/2011 | $15.66 | $0.00 | $15.66 |
| TRUCK DRIVER (OFF ROAD HAULER) | SUTX2011-006 08/03/2011 | $11.88 | $0.00 | $11.88 |
| TRUCK DRIVER (SINGLE AXLE) | SUTX2011-006 08/03/2011 | $11.79 | $0.00 | $11.79 |
| TRUCK DRIVER: SINGLE OR TANDEM AXLE DUMP TRUCK | SUTX2011-006 08/03/2011 | $11.68 | $0.00 | $11.68 |
| TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER | SUTX2011-006 08/03/2011 | $12.81 | $0.00 | $12.81 |
| WELDER | SUTX2011-006 08/03/2011 | $15.97 | $0.00 | $15.97 |
2 of 2: WD TX20260033, Mod 1
Make a WH-347 with these ratesScope as published: Dredging projects along the Texas Gulf Coast Area including all public channels, harbors, rivers, tributaries, and the Gulf Intracoastal Waterways
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| DECKHAND (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| DECKHAND (DREDGE UNDER 16") | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| DERRICK OPERATOR | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| DOZER OPERATOR | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| DREDGE TENDER OPERATOR (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| DREDGE TENDER OPERATOR (DREDGE UNDER 16") | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| FIREMAN (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| FIRST ASSISTANT ENGINEER (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| FIRST COOK (HYDRAULIC DREDGING) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| HANDYMAN (HYDRAULIC DREDGING) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| JANITOR - CABIN PERSON (HYDRAULIC DREDGING) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| LEVERMAN (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| LEVERMAN (DREDGE UNDER 16") | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| MESS PERSON (HYDRAULIC DREDGING) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| OILER (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| OILER (DREDGE UNDER 16") | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| OILER (MARSH BUGGY DRAGLINE) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| OPERATOR (MARSH BUGGY DRAGLINE) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| SECOND ASSISTANT ENGINEER (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| SECOND COOK (HYDRAULIC DREDGING) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| SHOREMAN (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| THIRD ASSISTANT ENGINEER (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| TRUCK DRIVER (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| WELDER (DREDGE 16" AND OVER) | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
| WELDER (DREDGE UNDER 16") | SUTX1994-001 01/18/1994 | $16.85 | $0.00 | $16.85 |
Questions about these rates
What is the Davis-Bacon rate for electricians on heavy work in Bandera County?
What is the Davis-Bacon rate for laborers on heavy work in Bandera County?
What is the Davis-Bacon rate for equipment operators on heavy work in Bandera County?
Which wage determination applies to my project?
What counts as heavy construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260007
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.