Davis-Bacon wage rates · Texas
Dallas County residential construction wage rates
Federal prevailing wage rates for residential construction in Dallas County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260014
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 19
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260014, Mod 1
Make a WH-347 with these ratesScope as published: RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | SUTX1992-005 05/14/1992 | $10.80 | $0.00 | $10.80 |
| CARPENTER (EXCLUDING DRYWALL HANGING BATT INSULATION, FORM SETTING) | SUTX1992-005 05/14/1992 | $9.28 | $0.00 | $9.28 |
| CEMENT MASON/CONCRETE FINISHER (EXCLUDING FORM SETTING) | SUTX1992-005 05/14/1992 | $10.77 | $0.00 | $10.77 |
| DRYWALL HANGER | SUTX1992-005 05/14/1992 | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | SUTX1992-005 05/14/1992 | $10.42 | $0.00 | $10.42 |
| FORM SETTER | SUTX1992-005 05/14/1992 | $10.90 | $0.00 | $10.90 |
| HVAC MECHANIC (INCLUDING PIPE, EXCLUDING DUCT) | SUTX1992-005 05/14/1992 | $9.93 | $1.13 | $11.06 |
| INSULATOR - BATT | SUTX1992-005 05/14/1992 | $15.00 | $0.00 | $15.00 |
| LABORERS: EXCLUDING BATT INSULATION (COMMON) | SUTX1992-005 05/14/1992 | $7.25 | $0.00 | $7.25 |
| LABORERS: EXCLUDING BATT INSULATION (MASON TENDER (INCLUDING CEMENT AND BRICK)) | SUTX1992-005 05/14/1992 | $7.25 | $0.00 | $7.25 |
| LABORERS:, EXCLUDING BATT INSULATION (LANDSCAPE) | SUTX1992-005 05/14/1992 | $7.25 | $0.00 | $7.25 |
| PAINTER: BRUSH ONLY (INCLUDING DRYWALL TAPING/FINSHING) | SUTX1992-005 05/14/1992 | $10.47 | $0.00 | $10.47 |
| PLUMBER (EXCLUDING HVAC WORK) | SUTX1992-005 05/14/1992 | $11.57 | $0.00 | $11.57 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | SUTX1992-005 05/14/1992 | $11.61 | $0.00 | $11.61 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | SUTX1992-005 05/14/1992 | $12.42 | $0.00 | $12.42 |
| POWER EQUIPMENT OPERATORS: GRADER | SUTX1992-005 05/14/1992 | $11.25 | $0.00 | $11.25 |
| ROOFER | SUTX1992-005 05/14/1992 | $8.54 | $0.00 | $8.54 |
| TILE SETTER | SUTX1992-005 05/14/1992 | $8.54 | $0.00 | $8.54 |
| TRUCK DRIVER | SUTX1992-005 05/14/1992 | $7.25 | $0.00 | $7.25 |
Questions about these rates
What is the Davis-Bacon rate for electricians on residential work in Dallas County?
What is the Davis-Bacon rate for plumbers on residential work in Dallas County?
What is the Davis-Bacon rate for carpenters on residential work in Dallas County?
Which wage determination applies to my project?
What counts as residential construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260014
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.