Davis-Bacon wage rates · Texas
Franklin County building construction wage rates
Federal prevailing wage rates for building construction in Franklin County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260142
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 24
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260142, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | ASBE0021-002 06/01/2025 | $33.23 | $7.52 | $40.75 |
| BOILERMAKER | BOIL0132-002 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2009-029 04/20/2009 | $20.00 | $0.00 | $20.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | SUTX2009-029 04/20/2009 | $14.30 | $0.00 | $14.30 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2009-029 04/20/2009 | $13.29 | $0.00 | $13.29 |
| ELECTRICIAN | SUTX2009-029 04/20/2009 | $18.06 | $4.87 | $22.93 |
| IRONWORKER, REINFORCING | IRON0263-017 06/01/2025 | $29.64 | $8.43 | $38.07 |
| IRONWORKER, STRUCTURAL | SUTX2009-029 04/20/2009 | $15.48 | $0.00 | $15.48 |
| LABORER: COMMON OR GENERAL | SUTX2009-029 04/20/2009 | $9.73 | $0.00 | $9.73 |
| LABORER: LANDSCAPE & IRRIGATION | SUTX2009-029 04/20/2009 | $8.50 | $0.22 | $8.72 |
| LABORER: MASON TENDER - BRICK | SUTX2009-029 04/20/2009 | $12.02 | $0.00 | $12.02 |
| LABORER: MORTAR MIXER | SUTX2009-029 04/20/2009 | $12.00 | $0.00 | $12.00 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | LABO0154-022 05/01/2024 | $25.27 | $9.57 | $34.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2009-029 04/20/2009 | $11.00 | $0.00 | $11.00 |
| OPERATOR: BULLDOZER | SUTX2009-029 04/20/2009 | $13.00 | $0.31 | $13.31 |
| OPERATOR: CRANE | SUTX2009-029 04/20/2009 | $21.33 | $0.00 | $21.33 |
| OPERATOR: FORKLIFT | SUTX2009-029 04/20/2009 | $14.58 | $0.00 | $14.58 |
| OPERATOR: LOADER (FRONT END) | SUTX2009-029 04/20/2009 | $10.54 | $0.00 | $10.54 |
| PAINTER: BRUSH, ROLLER AND SPRAY | SUTX2009-029 04/20/2009 | $13.50 | $0.00 | $13.50 |
| PLUMBER | SUTX2009-029 04/20/2009 | $20.38 | $4.74 | $25.12 |
| ROOFER | SUTX2009-029 04/20/2009 | $13.64 | $1.80 | $15.44 |
| SHEET METAL WORKER | SUTX2009-029 04/20/2009 | $17.00 | $0.00 | $17.00 |
| TILE SETTER | SUTX2009-029 04/20/2009 | $15.00 | $0.00 | $15.00 |
| TRUCK DRIVER | SUTX2009-029 04/20/2009 | $12.52 | $0.00 | $12.52 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Franklin County?
What is the Davis-Bacon rate for plumbers on building work in Franklin County?
What is the Davis-Bacon rate for carpenters on building work in Franklin County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260142
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.