Davis-Bacon wage rates · Texas
Hudspeth County building construction wage rates
Federal prevailing wage rates for building construction in Hudspeth County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260157
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 26
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260157, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ACOUSTICAL CEILING MECHANIC | SUTX2009-044 04/20/2009 | $14.50 | $0.00 | $14.50 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | ASBE0076-006 01/01/2025 | $31.26 | $11.83 | $43.09 |
| BOILERMAKER | BOIL0592-002 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2009-044 04/20/2009 | $17.76 | $0.00 | $17.76 |
| CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | SUTX2009-044 04/20/2009 | $13.46 | $0.00 | $13.46 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2009-044 04/20/2009 | $13.27 | $0.00 | $13.27 |
| ELECTRICIAN | SUTX2009-044 04/20/2009 | $15.85 | $0.00 | $15.85 |
| IRONWORKER: REINFORCING | IRON0263-019 06/01/2025 | $29.64 | $8.43 | $38.07 |
| LABORER: COMMON OR GENERAL | SUTX2009-044 04/20/2009 | $8.72 | $0.00 | $8.72 |
| LABORER: LANDSCAPE & IRRIGATION | SUTX2009-044 04/20/2009 | $8.50 | $0.22 | $8.72 |
| LABORER: MASON TENDER - BRICK | SUTX2009-044 04/20/2009 | $12.02 | $0.00 | $12.02 |
| LABORER: MORTAR MIXER | SUTX2009-044 04/20/2009 | $9.50 | $0.00 | $9.50 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | LABO0154-022 05/01/2024 | $25.27 | $9.57 | $34.84 |
| LATHER | SUTX2009-044 04/20/2009 | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2009-044 04/20/2009 | $13.75 | $0.00 | $13.75 |
| OPERATOR: BULLDOZER | SUTX2009-044 04/20/2009 | $12.80 | $0.43 | $13.23 |
| OPERATOR: CRANE | SUTX2009-044 04/20/2009 | $21.33 | $0.00 | $21.33 |
| OPERATOR: FORKLIFT | SUTX2009-044 04/20/2009 | $14.58 | $0.00 | $14.58 |
| OPERATOR: LOADER (FRONT END) | SUTX2009-044 04/20/2009 | $10.54 | $0.00 | $10.54 |
| PAINTER: BRUSH, ROLLER AND SPRAY | SUTX2009-044 04/20/2009 | $15.80 | $0.00 | $15.80 |
| PLASTERER | SUTX2009-044 04/20/2009 | $12.00 | $0.00 | $12.00 |
| PLUMBER | PLUM0412-008 01/02/2024 | $40.74 | $15.35 | $56.09 |
| ROOFER | SUTX2009-044 04/20/2009 | $15.10 | $1.29 | $16.39 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | SUTX2009-044 04/20/2009 | $18.00 | $0.00 | $18.00 |
| TILE SETTER | SUTX2009-044 04/20/2009 | $15.00 | $0.00 | $15.00 |
| TRUCK DRIVER | SUTX2009-044 04/20/2009 | $11.24 | $0.35 | $11.59 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Hudspeth County?
What is the Davis-Bacon rate for plumbers on building work in Hudspeth County?
What is the Davis-Bacon rate for carpenters on building work in Hudspeth County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260157
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.