Davis-Bacon wage rates · Texas
Moore County building construction wage rates
Federal prevailing wage rates for building construction in Moore County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260203
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 22
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260203, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BOILERMAKER | BOIL0592-002 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2009-090 04/20/2009 | $19.46 | $0.00 | $19.46 |
| CARPENTER | CARP0665-002 01/01/2025 | $28.57 | $9.30 | $37.87 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2009-090 04/20/2009 | $13.27 | $0.00 | $13.27 |
| ELECTRICIAN | SUTX2009-090 04/20/2009 | $18.06 | $4.87 | $22.93 |
| IRONWORKER: REINFORCING | IRON0263-019 06/01/2025 | $29.64 | $8.43 | $38.07 |
| LABORER: COMMON OR GENERAL | SUTX2009-090 04/20/2009 | $7.25 | $0.00 | $7.25 |
| LABORER: LANDSCAPE & IRRIGATION | SUTX2009-090 04/20/2009 | $8.50 | $0.22 | $8.72 |
| LABORER: MASON TENDER - BRICK | SUTX2009-090 04/20/2009 | $12.02 | $0.00 | $12.02 |
| LABORER: MORTAR MIXER | SUTX2009-090 04/20/2009 | $12.00 | $0.00 | $12.00 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | LABO0154-010 05/01/2024 | $25.27 | $9.57 | $34.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2009-090 04/20/2009 | $13.75 | $0.00 | $13.75 |
| OPERATOR: BULLDOZER | SUTX2009-090 04/20/2009 | $12.80 | $0.43 | $13.23 |
| OPERATOR: CRANE | SUTX2009-090 04/20/2009 | $21.33 | $0.00 | $21.33 |
| OPERATOR: FORKLIFT | SUTX2009-090 04/20/2009 | $14.58 | $0.00 | $14.58 |
| OPERATOR: LOADER (FRONT END) | SUTX2009-090 04/20/2009 | $10.54 | $0.00 | $10.54 |
| PAINTER: BRUSH, ROLLER AND SPRAY | SUTX2009-090 04/20/2009 | $12.26 | $0.00 | $12.26 |
| PLUMBER | PLUM0404-001 09/01/2022 | $28.64 | $10.65 | $39.29 |
| ROOFER | SUTX2009-090 04/20/2009 | $13.64 | $1.80 | $15.44 |
| SHEET METAL WORKER | SUTX2009-090 04/20/2009 | $17.00 | $0.00 | $17.00 |
| TILE SETTER | SUTX2009-090 04/20/2009 | $15.00 | $0.00 | $15.00 |
| TRUCK DRIVER | SUTX2009-090 04/20/2009 | $11.24 | $0.35 | $11.59 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Moore County?
What is the Davis-Bacon rate for plumbers on building work in Moore County?
What is the Davis-Bacon rate for carpenters on building work in Moore County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260203
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.