Davis-Bacon wage rates · Texas
Morris County building construction wage rates
Federal prevailing wage rates for building construction in Morris County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260170
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 24
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260170, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | ASBE0021-002 06/01/2025 | $33.23 | $7.52 | $40.75 |
| BOILERMAKER | BOIL0132-002 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2009-057 04/20/2009 | $20.00 | $0.00 | $20.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | SUTX2009-057 04/20/2009 | $14.30 | $0.00 | $14.30 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2009-057 04/20/2009 | $13.29 | $0.00 | $13.29 |
| ELECTRICIAN | SUTX2009-057 04/20/2009 | $18.06 | $4.87 | $22.93 |
| IRONWORKER, REINFORCING | IRON0084-010 06/01/2024 | $28.26 | $8.13 | $36.39 |
| IRONWORKER, STRUCTURAL | SUTX2009-057 04/20/2009 | $15.48 | $0.00 | $15.48 |
| LABORER: COMMON OR GENERAL | SUTX2009-057 04/20/2009 | $9.73 | $0.00 | $9.73 |
| LABORER: LANDSCAPE & IRRIGATION | SUTX2009-057 04/20/2009 | $8.50 | $0.22 | $8.72 |
| LABORER: MASON TENDER - BRICK | SUTX2009-057 04/20/2009 | $12.02 | $0.00 | $12.02 |
| LABORER: MORTAR MIXER | SUTX2009-057 04/20/2009 | $12.00 | $0.00 | $12.00 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | LABO0154-022 05/01/2024 | $25.27 | $9.57 | $34.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2009-057 04/20/2009 | $11.00 | $0.00 | $11.00 |
| OPERATOR: BULLDOZER | SUTX2009-057 04/20/2009 | $13.00 | $0.31 | $13.31 |
| OPERATOR: CRANE | SUTX2009-057 04/20/2009 | $21.33 | $0.00 | $21.33 |
| OPERATOR: FORKLIFT | SUTX2009-057 04/20/2009 | $14.58 | $0.00 | $14.58 |
| OPERATOR: LOADER (FRONT END) | SUTX2009-057 04/20/2009 | $10.54 | $0.00 | $10.54 |
| PAINTER: BRUSH, ROLLER AND SPRAY | SUTX2009-057 04/20/2009 | $13.50 | $0.00 | $13.50 |
| PLUMBER | SUTX2009-057 04/20/2009 | $20.38 | $4.74 | $25.12 |
| ROOFER | SUTX2009-057 04/20/2009 | $13.64 | $1.80 | $15.44 |
| SHEET METAL WORKER | SUTX2009-057 04/20/2009 | $17.00 | $0.00 | $17.00 |
| TILE SETTER | SUTX2009-057 04/20/2009 | $15.00 | $0.00 | $15.00 |
| TRUCK DRIVER | SUTX2009-057 04/20/2009 | $12.52 | $0.00 | $12.52 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Morris County?
What is the Davis-Bacon rate for plumbers on building work in Morris County?
What is the Davis-Bacon rate for carpenters on building work in Morris County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260170
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.