Davis-Bacon wage rates · Texas

Orange County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Orange County, Texas, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20264 wage determinations
Wage determination
TX20260033
Modification
1
Published
May 18, 2026
Classifications
25
Other types here
Building, Residential, Highway

4 wage determinations cover heavy work in Orange County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.

1 of 4: WD TX20260033, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 25 classifications Covers 254 counties Types: Heavy Source: SAM.gov

Scope as published: Dredging projects along the Texas Gulf Coast Area including all public channels, harbors, rivers, tributaries, and the Gulf Intracoastal Waterways

Davis-Bacon rates in TX20260033 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DECKHAND (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DECKHAND (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DERRICK OPERATOR SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DOZER OPERATOR SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DREDGE TENDER OPERATOR (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DREDGE TENDER OPERATOR (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
FIREMAN (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
FIRST ASSISTANT ENGINEER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
FIRST COOK (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
HANDYMAN (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
JANITOR - CABIN PERSON (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
LEVERMAN (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
LEVERMAN (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
MESS PERSON (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OILER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OILER (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OILER (MARSH BUGGY DRAGLINE) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OPERATOR (MARSH BUGGY DRAGLINE) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
SECOND ASSISTANT ENGINEER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
SECOND COOK (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
SHOREMAN (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
THIRD ASSISTANT ENGINEER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
TRUCK DRIVER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
WELDER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
WELDER (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85

2 of 4: WD TX20260053, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 15 classifications Covers 3 counties Types: Heavy Source: SAM.gov

Scope as published: Excludes Industrial, Processing Plants, and Refineries

Davis-Bacon rates in TX20260053 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTERS: (FORM BUILDING/FORM SETTING) SUTX2000-002
02/11/2000
$13.15 $0.00 $13.15
CARPENTERS: ALL OTHER WORK SUTX2000-002
02/11/2000
$13.56 $0.00 $13.56
CONCRETE FINISHER SUTX2000-002
02/11/2000
$13.50 $0.00 $13.50
ELECTRICIAN ELEC0479-003
09/30/2024
$33.76 $13.56 $47.32
LABORERS: (COMMON) SUTX2000-002
02/11/2000
$7.41 $0.00 $7.41
LABORERS: (PIPELAYER) SUTX2000-002
02/11/2000
$8.29 $0.00 $8.29
PAINTERS: (SPRAY AND BRUSH) SUTX2000-002
02/11/2000
$12.07 $0.00 $12.07
PILEDRIVERMAN SUTX2000-002
02/11/2000
$13.65 $0.00 $13.65
PLUMBER SUTX2000-002
02/11/2000
$18.28 $4.69 $22.97
POWER EQUIPMENT OPERATORS: (BACKHOE) SUTX2000-002
02/11/2000
$15.55 $1.89 $17.44
POWER EQUIPMENT OPERATORS: BULLDOZER SUTX2000-002
02/11/2000
$15.00 $0.00 $15.00
POWER EQUIPMENT OPERATORS: CRANE SUTX2000-002
02/11/2000
$13.77 $0.00 $13.77
POWER EQUIPMENT OPERATORS: FRONT END LOADER SUTX2000-002
02/11/2000
$10.63 $0.00 $10.63
POWER EQUIPMENT OPERATORS: TRACKHOE SUTX2000-002
02/11/2000
$15.60 $0.00 $15.60
TRUCK DRIVERS: DUMP SUTX2000-002
02/11/2000
$10.00 $0.00 $10.00

3 of 4: WD TX20260052, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 8 classifications Covers 2 counties Types: Heavy Source: SAM.gov

Scope as published: Flood Control Projects Only

Davis-Bacon rates in TX20260052 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER SUTX1990-035
01/31/1990
$10.97 $0.90 $11.87
HEAVY EQUIPMENT OPERATOR (HEAVY DUTY MECHANIC, BLADE GRADER (SELF-PROPELLED), BULL CLAM, BACKFILLER, DERRICK (POWER OPERATED, ALL TYPES); DRAGLINE, PUSH CAT OPERATOR; BULLDOZER & ALL TYPES OF CAT ...HEAVY EQUIPMENT OPERATOR (HEAVY DUTY MECHANIC, BLADE GRADER (SELF-PROPELLED), BULL CLAM, BACKFILLER, DERRICK (POWER OPERATED, ALL TYPES); DRAGLINE, PUSH CAT OPERATOR; BULLDOZER & ALL TYPES OF CAT TRACTORS; CABLE-WAY; BACKHOE, SHOVEL, CRANE (POWER OPERATED, ALL TYPES), ELEVATING GRADER (SELF-PROPELLED), HOIST (MOTOR DRIVEN 2 DRUMS OR MORE), MIX MOBILE, WINCH TRUCK, LOCOMOTIVE CRANE, MIXER (14 CUBIC FEET OR MORE), PAVING MIXER (ALL SIZES), SCRAPER (HEAVY TYPE OVER 3 CY), TRENCH MACHINE (ALL
SUTX1990-035
01/31/1990
$7.25 $0.00 $7.25
LABORER SUTX1990-035
01/31/1990
$7.25 $0.00 $7.25
LIGHT EQUIPMENT OPERATOR (AIR COMPRESSOR, BLADE GRADER (TOWED), FLEXPLANE, FORM GRADER, MIXER (LESS THAN 14 CU. FT.), PUMPS PULSOMETER, TRUCK CRANE DRIVER, GASOLINE OR DIESEL DRIVEN WELDING MACHINES (...LIGHT EQUIPMENT OPERATOR (AIR COMPRESSOR, BLADE GRADER (TOWED), FLEXPLANE, FORM GRADER, MIXER (LESS THAN 14 CU. FT.), PUMPS PULSOMETER, TRUCK CRANE DRIVER, GASOLINE OR DIESEL DRIVEN WELDING MACHINES (3 TO 6 MACHINES), HOIST (SINGLE DRUM), SCRAPERS (3 CU. YDS. OR LESS))
SUTX1990-035
01/31/1990
$7.25 $0.00 $7.25
OILER SUTX1990-035
01/31/1990
$7.25 $0.00 $7.25
PILEDRIVER SUTX1990-035
01/31/1990
$7.25 $0.00 $7.25
PILEDRIVERMAN SUTX1990-035
01/31/1990
$11.26 $0.85 $12.11
TRUCK DRIVER SUTX1990-035
01/31/1990
$7.25 $0.00 $7.25

4 of 4: WD TX20260061, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 8 classifications Covers 3 counties Types: Heavy Source: SAM.gov

Scope as published: Industrial, Processing Plants, and Refineries

Davis-Bacon rates in TX20260061 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BRICKLAYER BRTX0005-001
06/01/2025
$32.08 $14.84 $46.92
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) SUTX2000-003
02/11/2000
$15.20 $0.40 $15.60
INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATIONG MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHING TO ALL TYPES OF MECHANICAL SYSTEMS) ASBE0022-001
07/01/2024
$30.20 $16.62 $46.82
LABORER: COMMON SUTX2000-003
02/11/2000
$10.00 $0.00 $10.00
MILLWRIGHT CARP2484-001
01/03/2000
$19.72 $3.73 $23.45
PIPEFITTER (INCLUDING HVAC WORK) SUTX2000-003
02/11/2000
$13.20 $0.34 $13.54
POWER EQUIPMENT OPERATOR: CRANE SUTX2000-003
02/11/2000
$15.20 $0.40 $15.60
SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) SHEE0054-001
04/01/2020
$29.70 $13.85 $43.55

Questions about these rates

What is the Davis-Bacon rate for equipment operators on heavy work in Orange County?
On WD TX20260033 Mod 1, published May 18, 2026, the row "OPERATOR (MARSH BUGGY DRAGLINE)" is $16.85 base plus $0.00 fringe, $16.85 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with TX20260033

Other counties: all Texas counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.