Davis-Bacon wage rates · Texas
Parker County building construction wage rates
Federal prevailing wage rates for building construction in Parker County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260264
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 52
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260264, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | ASBE0021-011 06/01/2025 | $33.23 | $7.52 | $40.75 |
| BOILERMAKER | BOIL0074-003 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2014-041 07/21/2014 | $20.18 | $0.00 | $20.18 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | SUTX2014-041 07/21/2014 | $14.90 | $2.04 | $16.94 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2014-041 07/21/2014 | $13.45 | $0.00 | $13.45 |
| DRYWALL FINISHER/TAPER | SUTX2014-041 07/21/2014 | $16.24 | $3.94 | $20.18 |
| DRYWALL HANGER AND METAL STUD INSTALLER | SUTX2014-041 07/21/2014 | $16.20 | $3.40 | $19.60 |
| ELECTRICAL INSTALLER (SOUND AND COMMUNICATION SYSTEMS) (EXCLUDES WIRING) | SUTX2014-041 07/21/2014 | $17.79 | $2.41 | $20.20 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | SUTX2014-041 07/21/2014 | $18.00 | $0.38 | $18.38 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | SUTX2014-041 07/21/2014 | $14.88 | $2.15 | $17.03 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS/SOUND AND COMMUNICATION SYSTEMS | SUTX2014-041 07/21/2014 | $20.68 | $4.39 | $25.07 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0021-006 01/01/2025 | $51.93 | $38.44 | $90.37 |
| FORM WORKER | SUTX2014-041 07/21/2014 | $12.38 | $0.00 | $12.38 |
| GLAZIER | SUTX2014-041 07/21/2014 | $16.12 | $2.86 | $18.98 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | SUTX2014-041 07/21/2014 | $22.18 | $6.48 | $28.66 |
| INSTALLER - SIDING (METAL/ALUMINUM/VINYL) | SUTX2014-041 07/21/2014 | $15.77 | $0.00 | $15.77 |
| IRONWORKER, REINFORCING | SUTX2014-041 07/21/2014 | $12.19 | $0.00 | $12.19 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | IRON0263-005 06/01/2025 | $29.64 | $8.43 | $38.07 |
| LABORER: COMMON OR GENERAL | SUTX2014-041 07/21/2014 | $11.34 | $0.00 | $11.34 |
| LABORER: LANDSCAPE AND IRRIGATION | SUTX2014-041 07/21/2014 | $10.00 | $0.00 | $10.00 |
| LABORER: MASON TENDER - BRICK | SUTX2014-041 07/21/2014 | $10.50 | $0.00 | $10.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUTX2014-041 07/21/2014 | $10.80 | $0.00 | $10.80 |
| LABORER: PIPELAYER | SUTX2014-041 07/21/2014 | $13.00 | $0.35 | $13.35 |
| LABORER: ROOF TEAROFF | SUTX2014-041 07/21/2014 | $11.28 | $0.00 | $11.28 |
| MILLWRIGHT | CARP1421-002 10/01/2023 | $32.02 | $11.27 | $43.29 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2014-041 07/21/2014 | $13.06 | $0.00 | $13.06 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUTX2014-041 07/21/2014 | $13.93 | $0.00 | $13.93 |
| OPERATOR: BULLDOZER | SUTX2014-041 07/21/2014 | $18.29 | $1.31 | $19.60 |
| OPERATOR: DRILL | SUTX2014-041 07/21/2014 | $17.60 | $0.50 | $18.10 |
| OPERATOR: FORKLIFT | SUTX2014-041 07/21/2014 | $14.20 | $0.00 | $14.20 |
| OPERATOR: GRADER/BLADE | SUTX2014-041 07/21/2014 | $12.95 | $0.00 | $12.95 |
| OPERATOR: LOADER | SUTX2014-041 07/21/2014 | $12.89 | $1.19 | $14.08 |
| OPERATOR: MECHANIC | SUTX2014-041 07/21/2014 | $17.52 | $3.33 | $20.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUTX2014-041 07/21/2014 | $18.44 | $0.00 | $18.44 |
| OPERATOR: ROLLER | SUTX2014-041 07/21/2014 | $15.04 | $0.00 | $15.04 |
| PAINTER (BRUSH, ROLLER, AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING)) | PAIN0053-004 04/01/2014 | $16.40 | $5.45 | $21.85 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | PLUM0146-003 05/01/2025 | $41.28 | $12.16 | $53.44 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | SUTX2014-041 07/21/2014 | $21.04 | $4.34 | $25.38 |
| PLASTERER | SUTX2014-041 07/21/2014 | $15.30 | $0.00 | $15.30 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | SUTX2014-041 07/21/2014 | $22.19 | $3.94 | $26.13 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | ENGI0178-005 06/01/2020 | $32.85 | $13.10 | $45.95 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | ENGI0178-005 06/01/2020 | $32.35 | $13.10 | $45.45 |
| ROOFER | SUTX2014-041 07/21/2014 | $15.70 | $0.58 | $16.28 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | SUTX2014-041 07/21/2014 | $21.39 | $5.47 | $26.86 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | SUTX2014-041 07/21/2014 | $18.63 | $0.65 | $19.28 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SUTX2014-041 07/21/2014 | $18.89 | $0.00 | $18.89 |
| TILE FINISHER | SUTX2014-041 07/21/2014 | $11.22 | $0.00 | $11.22 |
| TILE SETTER | SUTX2014-041 07/21/2014 | $12.00 | $0.00 | $12.00 |
| TRUCK DRIVER: DUMP TRUCK | SUTX2014-041 07/21/2014 | $12.39 | $1.18 | $13.57 |
| TRUCK DRIVER: FLATBED TRUCK | SUTX2014-041 07/21/2014 | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | SUTX2014-041 07/21/2014 | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: WATER TRUCK | SUTX2014-041 07/21/2014 | $12.00 | $4.11 | $16.11 |
Footnotes in TX20260264 (2)
- ELEV0021-006 A: 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
- ELEV0021-006 B: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND VETERANS DAY
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Parker County?
What is the Davis-Bacon rate for plumbers on building work in Parker County?
What is the Davis-Bacon rate for carpenters on building work in Parker County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260264
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.