Davis-Bacon wage rates · Texas
Potter County building construction wage rates
Federal prevailing wage rates for building construction in Potter County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260265
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 40
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260265, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BOILERMAKER | BOIL0074-003 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2014-042 07/21/2014 | $20.04 | $0.00 | $20.04 |
| CARPENTER | CARP0665-001 01/01/2025 | $28.57 | $9.30 | $37.87 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2014-042 07/21/2014 | $19.60 | $0.00 | $19.60 |
| ELECTRICAL INSTALLER (ALARMS ONLY) EXCLUDES WIRING | SUTX2014-042 07/21/2014 | $18.68 | $2.87 | $21.55 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | ELEC0602-007 09/01/2022 | $29.41 | $12.73 | $42.14 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | SUTX2014-042 07/21/2014 | $15.65 | $3.20 | $18.85 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | SUTX2014-042 07/21/2014 | $19.77 | $7.13 | $26.90 |
| IRONWORKER, REINFORCING | SUTX2014-042 07/21/2014 | $12.27 | $0.00 | $12.27 |
| IRONWORKER, STRUCTURAL | SUTX2014-042 07/21/2014 | $21.13 | $0.54 | $21.67 |
| IRONWORKER: ORNAMENTAL | IRON0084-011 06/01/2024 | $28.26 | $8.13 | $36.39 |
| LABORER: COMMON OR GENERAL | SUTX2014-042 07/21/2014 | $12.10 | $0.00 | $12.10 |
| LABORER: MASON TENDER - BRICK | SUTX2014-042 07/21/2014 | $11.36 | $0.00 | $11.36 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUTX2014-042 07/21/2014 | $10.58 | $0.00 | $10.58 |
| LABORER: PIPELAYER | SUTX2014-042 07/21/2014 | $12.49 | $2.13 | $14.62 |
| LABORER: ROOF TEAROFF | SUTX2014-042 07/21/2014 | $11.28 | $0.00 | $11.28 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2014-042 07/21/2014 | $14.25 | $0.00 | $14.25 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUTX2014-042 07/21/2014 | $13.93 | $0.00 | $13.93 |
| OPERATOR: BULLDOZER | SUTX2014-042 07/21/2014 | $18.29 | $1.31 | $19.60 |
| OPERATOR: DRILL | SUTX2014-042 07/21/2014 | $16.22 | $0.34 | $16.56 |
| OPERATOR: FORKLIFT | SUTX2014-042 07/21/2014 | $14.83 | $0.00 | $14.83 |
| OPERATOR: GRADER/BLADE | SUTX2014-042 07/21/2014 | $13.37 | $0.00 | $13.37 |
| OPERATOR: LOADER | SUTX2014-042 07/21/2014 | $13.55 | $0.94 | $14.49 |
| OPERATOR: MECHANIC | SUTX2014-042 07/21/2014 | $17.52 | $3.33 | $20.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUTX2014-042 07/21/2014 | $16.03 | $0.00 | $16.03 |
| OPERATOR: ROLLER | SUTX2014-042 07/21/2014 | $12.70 | $0.00 | $12.70 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | SUTX2014-042 07/21/2014 | $14.14 | $0.00 | $14.14 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | SUTX2014-042 07/21/2014 | $14.77 | $0.00 | $14.77 |
| PLUMBER | PLUM0404-001 09/01/2022 | $28.64 | $10.65 | $39.29 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | ENGI0178-005 06/01/2020 | $32.85 | $13.10 | $45.95 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | ENGI0178-005 06/01/2020 | $32.35 | $13.10 | $45.45 |
| ROOFER | SUTX2014-042 07/21/2014 | $13.75 | $0.00 | $13.75 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | SHEE0049-001 06/01/2022 | $26.72 | $12.13 | $38.85 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | SUTX2014-042 07/21/2014 | $21.13 | $6.53 | $27.66 |
| TILE FINISHER | SUTX2014-042 07/21/2014 | $11.22 | $0.00 | $11.22 |
| TILE SETTER | SUTX2014-042 07/21/2014 | $14.00 | $2.01 | $16.01 |
| TRUCK DRIVER: DUMP TRUCK | SUTX2014-042 07/21/2014 | $12.39 | $1.18 | $13.57 |
| TRUCK DRIVER: FLATBED TRUCK | SUTX2014-042 07/21/2014 | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | SUTX2014-042 07/21/2014 | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: WATER TRUCK | SUTX2014-042 07/21/2014 | $12.00 | $4.11 | $16.11 |
Questions about these rates
What is the Davis-Bacon rate for plumbers on building work in Potter County?
What is the Davis-Bacon rate for carpenters on building work in Potter County?
What is the Davis-Bacon rate for laborers on building work in Potter County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260265
Other counties: all Texas counties · WD lookup