Davis-Bacon wage rates · Texas
San Jacinto County building construction wage rates
Federal prevailing wage rates for building construction in San Jacinto County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260268
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 54
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260268, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ACOUSTICAL CEILING MECHANIC | SUTX2014-045 07/21/2014 | $16.41 | $3.98 | $20.39 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | ASBE0022-009 07/01/2024 | $30.20 | $12.38 | $42.58 |
| BOILERMAKER | BOIL0074-003 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2014-045 07/21/2014 | $19.86 | $0.00 | $19.86 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | CARP0551-008 04/01/2025 | $33.27 | $9.73 | $43.00 |
| CAULKER | SUTX2014-045 07/21/2014 | $15.36 | $0.00 | $15.36 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2014-045 07/21/2014 | $13.82 | $0.00 | $13.82 |
| DRYWALL FINISHER/TAPER | SUTX2014-045 07/21/2014 | $16.28 | $3.67 | $19.95 |
| DRYWALL HANGER AND METAL STUD INSTALLER | SUTX2014-045 07/21/2014 | $17.45 | $3.96 | $21.41 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | SUTX2014-045 07/21/2014 | $17.97 | $3.37 | $21.34 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | ELEC0716-005 09/01/2025 | $38.50 | $10.71 | $49.21 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | SUTX2014-045 07/21/2014 | $18.00 | $1.68 | $19.68 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0031-003 01/01/2025 | $53.59 | $38.44 | $92.03 |
| FLOOR LAYER: CARPET | SUTX2014-045 07/21/2014 | $20.00 | $0.00 | $20.00 |
| FORM WORKER | SUTX2014-045 07/21/2014 | $12.57 | $0.00 | $12.57 |
| GLAZIER | SUTX2014-045 07/21/2014 | $19.12 | $4.41 | $23.53 |
| IRONWORKER, REINFORCING | SUTX2014-045 07/21/2014 | $12.10 | $0.00 | $12.10 |
| IRONWORKER, STRUCTURAL | SUTX2014-045 07/21/2014 | $27.15 | $5.66 | $32.81 |
| IRONWORKER: ORNAMENTAL | IRON0084-011 06/01/2024 | $28.26 | $8.13 | $36.39 |
| LABORER: COMMON OR GENERAL | SUTX2014-045 07/21/2014 | $11.56 | $0.00 | $11.56 |
| LABORER: LANDSCAPE AND IRRIGATION | SUTX2014-045 07/21/2014 | $9.49 | $0.00 | $9.49 |
| LABORER: MASON TENDER - BRICK | SUTX2014-045 07/21/2014 | $13.37 | $0.00 | $13.37 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUTX2014-045 07/21/2014 | $10.50 | $0.00 | $10.50 |
| LABORER: PIPELAYER | SUTX2014-045 07/21/2014 | $12.94 | $0.00 | $12.94 |
| LABORER: ROOF TEAROFF | SUTX2014-045 07/21/2014 | $11.28 | $0.00 | $11.28 |
| LATHER | SUTX2014-045 07/21/2014 | $19.73 | $0.00 | $19.73 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2014-045 07/21/2014 | $14.10 | $0.00 | $14.10 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUTX2014-045 07/21/2014 | $13.93 | $0.00 | $13.93 |
| OPERATOR: BULLDOZER | SUTX2014-045 07/21/2014 | $20.77 | $0.00 | $20.77 |
| OPERATOR: DRILL | SUTX2014-045 07/21/2014 | $16.22 | $0.34 | $16.56 |
| OPERATOR: FORKLIFT | SUTX2014-045 07/21/2014 | $15.64 | $0.00 | $15.64 |
| OPERATOR: GRADER/BLADE | SUTX2014-045 07/21/2014 | $13.37 | $0.00 | $13.37 |
| OPERATOR: LOADER | SUTX2014-045 07/21/2014 | $13.55 | $0.94 | $14.49 |
| OPERATOR: MECHANIC | SUTX2014-045 07/21/2014 | $17.52 | $3.33 | $20.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUTX2014-045 07/21/2014 | $16.03 | $0.00 | $16.03 |
| OPERATOR: ROLLER | SUTX2014-045 07/21/2014 | $16.00 | $0.00 | $16.00 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | SUTX2014-045 07/21/2014 | $16.77 | $4.51 | $21.28 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | PLUM0211-010 10/01/2025 | $42.09 | $12.96 | $55.05 |
| PLASTERER | PLAS0783-001 04/01/2023 | $31.34 | $10.30 | $41.64 |
| PLUMBER | PLUM0068-002 10/01/2024 | $39.98 | $11.61 | $51.59 |
| POWER EQUIPMENT OPERATOR (CRANES) | ENGI0450-002 04/01/2024 | $39.47 | $10.39 | $49.86 |
| ROOFER | SUTX2014-045 07/21/2014 | $15.40 | $0.00 | $15.40 |
| SHEET METAL WORKER (EXCLUDES HVAC UNIT INSTALLATION) | SHEE0054-006 04/01/2020 | $29.70 | $13.85 | $43.55 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | SHEE0054-006 04/01/2020 | $29.70 | $13.85 | $43.55 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | SUTX2014-045 07/21/2014 | $19.67 | $2.24 | $21.91 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SUTX2014-045 07/21/2014 | $22.17 | $9.70 | $31.87 |
| TILE FINISHER | SUTX2014-045 07/21/2014 | $12.00 | $0.00 | $12.00 |
| TILE SETTER | SUTX2014-045 07/21/2014 | $16.17 | $0.00 | $16.17 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | SUTX2014-045 07/21/2014 | $14.95 | $5.23 | $20.18 |
| TRUCK DRIVER: DUMP TRUCK | SUTX2014-045 07/21/2014 | $12.39 | $1.18 | $13.57 |
| TRUCK DRIVER: FLATBED TRUCK | SUTX2014-045 07/21/2014 | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | SUTX2014-045 07/21/2014 | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: WATER TRUCK | SUTX2014-045 07/21/2014 | $12.00 | $4.11 | $16.11 |
| WATERPROOFER | SUTX2014-045 07/21/2014 | $14.39 | $0.00 | $14.39 |
Footnotes in TX20260268 (2)
- ELEV0031-003 A: 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
- ELEV0031-003 B: HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in San Jacinto County?
What is the Davis-Bacon rate for plumbers on building work in San Jacinto County?
What is the Davis-Bacon rate for carpenters on building work in San Jacinto County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260268
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.