Davis-Bacon wage rates · Texas
Starr County building construction wage rates
Federal prevailing wage rates for building construction in Starr County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260221
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 23
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260221, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | ASBE0087-002 06/02/2025 | $30.50 | $8.89 | $39.39 |
| BOILERMAKER | BOIL0074-003 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2009-108 04/20/2009 | $17.76 | $0.00 | $17.76 |
| CARPENTER | SUTX2009-108 04/20/2009 | $18.00 | $0.00 | $18.00 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2009-108 04/20/2009 | $13.27 | $0.00 | $13.27 |
| ELECTRICIAN | SUTX2009-108 04/20/2009 | $15.85 | $0.00 | $15.85 |
| IRONWORKER: REINFORCING AND STRUCTURAL | IRON0066-005 06/01/2025 | $27.95 | $8.03 | $35.98 |
| LABORER: COMMON OR GENERAL | SUTX2009-108 04/20/2009 | $8.50 | $0.00 | $8.50 |
| LABORER: LANDSCAPE & IRRIGATION | SUTX2009-108 04/20/2009 | $8.50 | $0.22 | $8.72 |
| LABORER: MASON TENDER - BRICK | SUTX2009-108 04/20/2009 | $12.02 | $0.00 | $12.02 |
| LABORER: MORTAR MIXER | SUTX2009-108 04/20/2009 | $9.50 | $0.00 | $9.50 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE | LABO0154-001 05/01/2024 | $25.27 | $9.57 | $34.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2009-108 04/20/2009 | $13.75 | $0.00 | $13.75 |
| OPERATOR: BULLDOZER | SUTX2009-108 04/20/2009 | $12.80 | $0.43 | $13.23 |
| OPERATOR: CRANE | SUTX2009-108 04/20/2009 | $21.33 | $0.00 | $21.33 |
| OPERATOR: FORKLIFT | SUTX2009-108 04/20/2009 | $14.58 | $0.00 | $14.58 |
| OPERATOR: LOADER (FRONT END) | SUTX2009-108 04/20/2009 | $10.54 | $0.00 | $10.54 |
| PAINTER: BRUSH, ROLLER AND SPRAY | SUTX2009-108 04/20/2009 | $15.80 | $0.00 | $15.80 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | SUTX2009-108 04/20/2009 | $12.50 | $0.00 | $12.50 |
| ROOFER | SUTX2009-108 04/20/2009 | $15.10 | $1.29 | $16.39 |
| SHEET METAL WORKER | SUTX2009-108 04/20/2009 | $17.00 | $0.00 | $17.00 |
| TILE SETTER | SUTX2009-108 04/20/2009 | $15.00 | $0.00 | $15.00 |
| TRUCK DRIVER | SUTX2009-108 04/20/2009 | $11.24 | $0.35 | $11.59 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Starr County?
What is the Davis-Bacon rate for plumbers on building work in Starr County?
What is the Davis-Bacon rate for carpenters on building work in Starr County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260221
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.