Davis-Bacon wage rates · Texas
Tom Green County building construction wage rates
Federal prevailing wage rates for building construction in Tom Green County, Texas, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- TX20260282
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 39
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.
WD TX20260282, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BOILERMAKER | BOIL0074-003 01/01/2025 | $33.17 | $24.92 | $58.09 |
| BRICKLAYER | SUTX2014-062 07/21/2014 | $20.00 | $0.00 | $20.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | SUTX2014-062 07/21/2014 | $13.82 | $0.00 | $13.82 |
| CEMENT MASON/CONCRETE FINISHER | SUTX2014-062 07/21/2014 | $13.76 | $0.00 | $13.76 |
| DRYWALL HANGER AND METAL STUD INSTALLER | SUTX2014-062 07/21/2014 | $16.72 | $0.00 | $16.72 |
| ELECTRICIAN | SUTX2014-062 07/21/2014 | $23.18 | $6.31 | $29.49 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | SUTX2014-062 07/21/2014 | $19.77 | $7.13 | $26.90 |
| IRONWORKER, REINFORCING | SUTX2014-062 07/21/2014 | $12.27 | $0.00 | $12.27 |
| IRONWORKER, STRUCTURAL | SUTX2014-062 07/21/2014 | $22.16 | $5.26 | $27.42 |
| IRONWORKER: ORNAMENTAL | IRON0084-011 06/01/2024 | $28.26 | $8.13 | $36.39 |
| LABORER: COMMON OR GENERAL | SUTX2014-062 07/21/2014 | $9.74 | $0.00 | $9.74 |
| LABORER: MASON TENDER - BRICK | SUTX2014-062 07/21/2014 | $11.38 | $0.00 | $11.38 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUTX2014-062 07/21/2014 | $10.58 | $0.00 | $10.58 |
| LABORER: PIPELAYER | SUTX2014-062 07/21/2014 | $12.49 | $2.13 | $14.62 |
| LABORER: ROOF TEAROFF | SUTX2014-062 07/21/2014 | $11.28 | $0.00 | $11.28 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUTX2014-062 07/21/2014 | $14.25 | $0.00 | $14.25 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUTX2014-062 07/21/2014 | $13.93 | $0.00 | $13.93 |
| OPERATOR: BULLDOZER | SUTX2014-062 07/21/2014 | $18.29 | $1.31 | $19.60 |
| OPERATOR: DRILL | SUTX2014-062 07/21/2014 | $16.22 | $0.34 | $16.56 |
| OPERATOR: FORKLIFT | SUTX2014-062 07/21/2014 | $14.83 | $0.00 | $14.83 |
| OPERATOR: GRADER/BLADE | SUTX2014-062 07/21/2014 | $13.37 | $0.00 | $13.37 |
| OPERATOR: LOADER | SUTX2014-062 07/21/2014 | $13.55 | $0.94 | $14.49 |
| OPERATOR: MECHANIC | SUTX2014-062 07/21/2014 | $17.52 | $3.33 | $20.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | SUTX2014-062 07/21/2014 | $16.03 | $0.00 | $16.03 |
| OPERATOR: ROLLER | SUTX2014-062 07/21/2014 | $12.70 | $0.00 | $12.70 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | SUTX2014-062 07/21/2014 | $15.00 | $0.73 | $15.73 |
| PIPEFITTER | SUTX2014-062 07/21/2014 | $25.80 | $8.55 | $34.35 |
| PLUMBER | PLUM0404-001 09/01/2022 | $28.64 | $10.65 | $39.29 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | ENGI0178-005 06/01/2020 | $32.85 | $13.10 | $45.95 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | ENGI0178-005 06/01/2020 | $32.35 | $13.10 | $45.45 |
| ROOFER | SUTX2014-062 07/21/2014 | $13.17 | $0.26 | $13.43 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | SUTX2014-062 07/21/2014 | $22.73 | $7.52 | $30.25 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | SUTX2014-062 07/21/2014 | $15.00 | $0.00 | $15.00 |
| TILE FINISHER | SUTX2014-062 07/21/2014 | $11.22 | $0.00 | $11.22 |
| TILE SETTER | SUTX2014-062 07/21/2014 | $14.74 | $0.00 | $14.74 |
| TRUCK DRIVER: DUMP TRUCK | SUTX2014-062 07/21/2014 | $12.39 | $1.18 | $13.57 |
| TRUCK DRIVER: FLATBED TRUCK | SUTX2014-062 07/21/2014 | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | SUTX2014-062 07/21/2014 | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: WATER TRUCK | SUTX2014-062 07/21/2014 | $12.00 | $4.11 | $16.11 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Tom Green County?
What is the Davis-Bacon rate for plumbers on building work in Tom Green County?
What is the Davis-Bacon rate for carpenters on building work in Tom Green County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with TX20260282
Other counties: all Texas counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.