Davis-Bacon wage rates · Texas

Wise County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Wise County, Texas, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20262 wage determinations
Wage determination
TX20260043
Modification
1
Published
May 18, 2026
Classifications
48
Other types here
Building, Residential, Highway

2 wage determinations cover heavy work in Wise County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Texas prevailing wage for how the two fit together.

1 of 2: WD TX20260043, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 48 classifications Covers 4 counties Types: Heavy Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in TX20260043 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
AIR TOOL OPERATOR SUTX2005-006
11/09/2011
$9.98 $0.00 $9.98
ASPHALT DISTRIBUTOR OPERATOR SUTX2005-006
11/09/2011
$11.45 $0.00 $11.45
ASPHALT PAVING MACHINE OPERATOR SUTX2005-006
11/09/2011
$11.82 $0.00 $11.82
ASPHALT RAKER SUTX2005-006
11/09/2011
$9.30 $0.00 $9.30
ASPHALT SHOVELER SUTX2005-006
11/09/2011
$8.28 $0.00 $8.28
BATCHING PLANT WEIGHER SUTX2005-006
11/09/2011
$17.11 $0.00 $17.11
BROOM OR SWEEPER OPERATOR SUTX2005-006
11/09/2011
$9.09 $0.00 $9.09
BULLDOZER OPERATOR SUTX2005-006
11/09/2011
$11.80 $0.00 $11.80
CARPENTER SUTX2005-006
11/09/2011
$11.73 $0.00 $11.73
CONCRETE FINISHER, PAVING SUTX2005-006
11/09/2011
$11.70 $0.00 $11.70
CONCRETE FINISHER, STRUCTURES SUTX2005-006
11/09/2011
$11.27 $0.00 $11.27
CONCRETE PAVING SAW OPERATOR SUTX2005-006
11/09/2011
$12.30 $0.00 $12.30
CONCRETE RUBBER SUTX2005-006
11/09/2011
$9.49 $0.00 $9.49
CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL OPERATOR SUTX2005-006
11/09/2011
$12.50 $0.00 $12.50
ELECTRICIAN SUTX2005-006
11/09/2011
$17.22 $0.00 $17.22
FLAGGER SUTX2005-006
11/09/2011
$8.06 $0.00 $8.06
FORM BUILDER/SETTER, STRUCTURES SUTX2005-006
11/09/2011
$11.21 $0.00 $11.21
FORM LINER - PAVING & CURB SUTX2005-006
11/09/2011
$8.00 $0.00 $8.00
FORM SETTER, PAVING & CURB SUTX2005-006
11/09/2011
$10.63 $0.00 $10.63
FOUNDATION DRILL OPERATOR, TRUCK MOUNTED SUTX2005-006
11/09/2011
$16.00 $0.00 $16.00
FRONT END LOADER OPERATOR SUTX2005-006
11/09/2011
$10.83 $0.00 $10.83
LABORER, COMMON SUTX2005-006
11/09/2011
$8.69 $0.00 $8.69
LABORER, UTILITY SUTX2005-006
11/09/2011
$10.57 $0.00 $10.57
MECHANIC (UNDEFINED) SUTX2005-006
11/09/2011
$14.79 $0.00 $14.79
MILLING MACHINE OPERATOR, FINE GRADE SUTX2005-006
11/09/2011
$10.25 $0.00 $10.25
MIXER OPERATOR SUTX2005-006
11/09/2011
$10.09 $0.00 $10.09
MOTOR GRADER OPERATOR, FINE GRADE SUTX2005-006
11/09/2011
$14.29 $0.00 $14.29
MOTOR GRADER OPERATOR, ROUGH SUTX2005-006
11/09/2011
$13.11 $0.00 $13.11
OILER SUTX2005-006
11/09/2011
$12.50 $0.00 $12.50
PAVEMENT MARKING MACHINE OPERATOR SUTX2005-006
11/09/2011
$11.17 $0.00 $11.17
PILEDRIVERMAN SUTX2005-006
11/09/2011
$11.00 $0.00 $11.00
PIPELAYER SUTX2005-006
11/09/2011
$10.85 $0.00 $10.85
REINFORCING STEEL SETTER, PAVING SUTX2005-006
11/09/2011
$13.48 $0.00 $13.48
REINFORCING STEEL SETTER, STRUCTURE SUTX2005-006
11/09/2011
$15.52 $0.00 $15.52
ROLLER OPERATOR, PNEUMATIC, SELF-PROPELLED SUTX2005-006
11/09/2011
$8.87 $0.00 $8.87
ROLLER OPERATOR, STEEL WHEEL, FLAT WHEEL/TAMPING SUTX2005-006
11/09/2011
$8.75 $0.00 $8.75
ROLLER OPERATOR, STEEL WHEEL, PLANT MIX PAVEMENT SUTX2005-006
11/09/2011
$9.70 $0.00 $9.70
SCRAPER OPERATOR SUTX2005-006
11/09/2011
$10.29 $0.00 $10.29
SERVICER SUTX2005-006
11/09/2011
$11.43 $0.00 $11.43
SPREADER BOX OPERATOR SUTX2005-006
11/09/2011
$10.39 $0.00 $10.39
TRACTOR OPERATOR, CRAWLER TYPE SUTX2005-006
11/09/2011
$12.00 $0.00 $12.00
TRACTOR OPERATOR, PNEUMATIC SUTX2005-006
11/09/2011
$11.57 $0.00 $11.57
TRAVELING MIXER OPERATOR SUTX2005-006
11/09/2011
$10.07 $0.00 $10.07
TRUCK DRIVER, LOWBOY-FLOAT SUTX2005-006
11/09/2011
$11.64 $0.00 $11.64
TRUCK DRIVER, SINGLE AXLE, HEAVY SUTX2005-006
11/09/2011
$10.56 $0.00 $10.56
TRUCK DRIVER, SINGLE AXLE, LIGHT SUTX2005-006
11/09/2011
$10.24 $0.00 $10.24
TRUCK DRIVER, TANDEM AXLE, SEMI-TRAILER SUTX2005-006
11/09/2011
$10.33 $0.00 $10.33
WORK ZONE BARRICADE SERVICER SUTX2005-006
11/09/2011
$9.52 $0.00 $9.52

2 of 2: WD TX20260033, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 25 classifications Covers 254 counties Types: Heavy Source: SAM.gov

Scope as published: Dredging projects along the Texas Gulf Coast Area including all public channels, harbors, rivers, tributaries, and the Gulf Intracoastal Waterways

Davis-Bacon rates in TX20260033 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DECKHAND (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DECKHAND (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DERRICK OPERATOR SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DOZER OPERATOR SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DREDGE TENDER OPERATOR (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
DREDGE TENDER OPERATOR (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
FIREMAN (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
FIRST ASSISTANT ENGINEER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
FIRST COOK (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
HANDYMAN (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
JANITOR - CABIN PERSON (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
LEVERMAN (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
LEVERMAN (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
MESS PERSON (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OILER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OILER (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OILER (MARSH BUGGY DRAGLINE) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
OPERATOR (MARSH BUGGY DRAGLINE) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
SECOND ASSISTANT ENGINEER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
SECOND COOK (HYDRAULIC DREDGING) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
SHOREMAN (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
THIRD ASSISTANT ENGINEER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
TRUCK DRIVER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
WELDER (DREDGE 16" AND OVER) SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85
WELDER (DREDGE UNDER 16") SUTX1994-001
01/18/1994
$16.85 $0.00 $16.85

Questions about these rates

What is the Davis-Bacon rate for electricians on heavy work in Wise County?
On WD TX20260043 Mod 1, published May 18, 2026, the row "ELECTRICIAN" is $17.22 base plus $0.00 fringe, $17.22 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Wise County?
On WD TX20260043 Mod 1, published May 18, 2026, the row "CARPENTER" is $11.73 base plus $0.00 fringe, $11.73 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for laborers on heavy work in Wise County?
On WD TX20260043 Mod 1, published May 18, 2026, the row "LABORER, COMMON" is $8.69 base plus $0.00 fringe, $8.69 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with TX20260043

Other counties: all Texas counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.