Davis-Bacon wage rates · Washington

Adams County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Adams County, Washington, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20262 wage determinations
Wage determination
WA20260043
Modification
2
Published
May 18, 2026
Classifications
26
Other types here
Building, Residential, Highway

2 wage determinations cover heavy work in Adams County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.

1 of 2: WD WA20260043, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 26 classifications Covers 1 county Types: Heavy Source: SAM.gov
Davis-Bacon rates in WA20260043 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER (INCLUDING FORM WORK) CARP0059-024
06/01/2025
$44.21 $17.28 $61.49
CEMENT MASON/CONCRETE FINISHER SUWA2009-034
08/07/2009
$17.21 $0.00 $17.21
ELECTRICIAN ELEC0073-002
07/01/2025
$49.55 $19.09 $68.64
IRONWORKER (REINFORCING AND STRUCTURAL) IRON0014-001
07/07/2025
$43.40 $32.77 $76.17
LABORER, MASON TENDER BRICK LABO0238-007
06/01/2025
$38.05 $16.75 $54.80
LABORER: A-2: GROUP 1 FLAGGER LABO0238-019
06/01/2025
$37.03 $16.90 $53.93
LABORER: A-2: GROUP 10 GRADE CHECKER LABO0238-019
06/01/2025
$43.21 $16.90 $60.11
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER LABO0238-019
06/01/2025
$40.13 $16.90 $57.03
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS LABO0238-019
06/01/2025
$40.46 $16.90 $57.36
LABORER: LANDSCAPE SUWA2009-034
08/07/2009
$14.67 $0.00 $14.67
LINE CONSTRUCTION: LINEMEN ELEC0077-001
02/01/2023
$60.54 $24.88 $85.42
MILLWRIGHT CARP1607-009
06/01/2025
$61.62 $20.43 $82.05
OPERATOR: DRILL SUWA2009-034
08/07/2009
$28.15 $8.20 $36.35
PAINTER (BRUSH, ROLLER, AND SPRAY.) PAIN0427-003
07/01/2025
$36.26 $17.01 $53.27
PIPEFITTER SUWA2009-034
08/07/2009
$25.98 $3.98 $29.96
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS ENGI0302-126
06/01/2025
$41.17 $23.40 $64.57
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT ENGI0302-126
06/01/2025
$41.56 $23.40 $64.96
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) ENGI0302-126
06/01/2025
$42.31 $23.40 $65.71
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER ENGI0302-126
06/01/2025
$42.51 $23.40 $65.91
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); BOOM TRUCK (UNDER 25 TONS) ENGI0302-126
06/01/2025
$42.71 $23.40 $66.11
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T...POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC
ENGI0302-126
06/01/2025
$43.05 $23.40 $66.45
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE ENGI0302-126
06/01/2025
$43.39 $23.40 $66.79
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) ENGI0302-126
06/01/2025
$45.36 $23.40 $68.76
TRUCK DRIVER: 10 YARD TRUCK SUWA2009-034
08/07/2009
$24.61 $8.34 $32.95
TRUCK DRIVER: DUMP TRUCK SUWA2009-034
08/07/2009
$19.67 $0.00 $19.67
TRUCK DRIVER: WATER TRUCK SUWA2009-034
08/07/2009
$24.36 $8.30 $32.66

2 of 2: WD WA20260080, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 36 classifications Covers 39 counties Types: Heavy Source: SAM.gov

Scope as published: Dredging Construction Projects (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in WA20260080 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DREDGING: ASSISTANT ENGINEER ZONE A ENGI0701-003
01/01/2024
$53.31 $16.70 $70.01
DREDGING: ASSISTANT ENGINEER ZONE B ENGI0701-003
01/01/2024
$56.31 $16.70 $73.01
DREDGING: ASSISTANT ENGINEER ZONE C ENGI0701-003
01/01/2024
$59.31 $16.70 $76.01
DREDGING: ASSISTANT MATE ZONE A ENGI0701-003
01/01/2024
$47.95 $16.70 $64.65
DREDGING: ASSISTANT MATE ZONE B ENGI0701-003
01/01/2024
$50.95 $16.70 $67.65
DREDGING: ASSISTANT MATE ZONE C ENGI0701-003
01/01/2024
$53.95 $16.70 $70.65
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A ENGI0701-003
01/01/2024
$56.47 $16.70 $73.17
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B ENGI0701-003
01/01/2024
$59.47 $16.70 $76.17
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C ENGI0701-003
01/01/2024
$62.47 $16.70 $79.17
DREDGING: LEVERMAN, HYDRAULIC ZONE A ENGI0701-003
01/01/2024
$56.47 $16.70 $73.17
DREDGING: LEVERMAN, HYDRAULIC ZONE B ENGI0701-003
01/01/2024
$59.47 $16.70 $76.17
DREDGING: LEVERMAN, HYDRAULIC ZONE C ENGI0701-003
01/01/2024
$62.47 $16.70 $79.17
DREDGING: TENDERMAN ZONE A ENGI0701-003
01/01/2024
$51.82 $16.70 $68.52
DREDGING: TENDERMAN ZONE B ENGI0701-003
01/01/2024
$54.82 $16.70 $71.52
DREDGING: TENDERMAN ZONE C ENGI0701-003
01/01/2024
$57.82 $16.70 $74.52
DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$35.93 $17.40 $53.33
DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF T...DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$36.93 $17.40 $54.33
DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HAR...DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$37.35 $17.40 $54.75
DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$38.39 $17.40 $55.79
DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANO...DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$36.93 $17.40 $54.33
DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WES...DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$37.35 $17.40 $54.75
HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$29.76 $20.65 $50.41
HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$30.08 $20.65 $50.73
HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$30.69 $20.65 $51.34
HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$30.85 $20.65 $51.50
HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$31.01 $20.65 $51.66
HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$31.29 $20.65 $51.94
HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$31.56 $20.65 $52.21
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE ...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$60.63 $27.32 $87.95
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 T...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$60.63 $27.32 $87.95
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILE...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$62.32 $27.32 $89.64
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZON...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$62.32 $27.32 $89.64
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS ...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$64.11 $27.32 $91.43
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$64.11 $27.32 $91.43
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 ...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$59.96 $27.32 $87.28
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) -...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$59.96 $27.32 $87.28

Questions about these rates

What is the Davis-Bacon rate for electricians on heavy work in Adams County?
On WD WA20260043 Mod 2, published May 18, 2026, the row "ELECTRICIAN" is $49.55 base plus $19.09 fringe, $68.64 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on heavy work in Adams County?
On WD WA20260043 Mod 2, published May 18, 2026, the row "PIPEFITTER" is $25.98 base plus $3.98 fringe, $29.96 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Adams County?
On WD WA20260043 Mod 2, published May 18, 2026, the row "CARPENTER (INCLUDING FORM WORK)" is $44.21 base plus $17.28 fringe, $61.49 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with WA20260043