Davis-Bacon wage rates · Washington

Columbia County building construction wage rates

Federal prevailing wage rates for building construction in Columbia County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
WA20260104
Modification
2
Published
May 18, 2026
Classifications
40
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.

WD WA20260104, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 40 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in WA20260104 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BRICKLAYER BRWA0001-021
06/01/2025
$39.57 $20.50 $60.07
CARPENTER CARP0059-018
06/01/2025
$44.21 $17.28 $61.49
CEMENT MASON/CONCRETE FINISHER SUWA2018-004
03/01/2024
$21.94 $0.00 $21.94
ELECTRICIAN ELEC0112-012
06/01/2025
$60.00 $27.78 $87.78
ELEVATOR MECHANIC Footnote A, B below ELEV0019-003
01/01/2025
$67.61 $38.44 $106.05
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) ASBE0007-007
06/01/2025
$75.37 $18.82 $94.19
IRONWORKER IRON0014-011
07/07/2025
$43.40 $32.77 $76.17
LABORER, MASON TENDER BRICK LABO0252-017
06/01/2025
$50.38 $16.96 $67.34
LABORER: COMMON OR GENERAL SUWA2018-004
03/01/2024
$29.97 $6.37 $36.34
LABORER: CONCRETE SAW CHAIN SUWA2018-004
03/01/2024
$35.03 $10.86 $45.89
LABORER: FIRE WATCH LABO0335-007
06/01/2025
$40.56 $15.60 $56.16
LABORER: FORM STRIPPING LABO0242-015
06/01/2025
$50.38 $16.96 $67.34
LABORER: GRADE CHECKER LABO0238-042
06/01/2025
$40.21 $16.90 $57.11
LABORER: HOD CARRIER LABO0238-044
06/01/2025
$38.05 $16.75 $54.80
LABORER: JACKHAMMER LABO0242-018
06/01/2025
$51.52 $16.99 $68.51
LABORER: MASON TENDER - CEMENT/CONCRETE SUWA2018-004
03/01/2024
$29.14 $12.05 $41.19
LABORER: NOZZLE PERSON LABO0242-020
06/01/2025
$52.31 $17.01 $69.32
LABORER: PIPELAYER LABO0238-043
06/01/2025
$37.80 $16.90 $54.70
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE SUWA2018-004
03/01/2024
$28.10 $0.00 $28.10
OPERATOR: BOBCAT/SKID STEER/SKID LOADER SUWA2018-004
03/01/2024
$40.53 $9.56 $50.09
OPERATOR: CONCRETE PUMP UAVGWA0001
03/01/2024
$52.92 $22.63 $75.55
OPERATOR: DRILL UAVGWA0002
03/01/2024
$56.42 $21.15 $77.57
OPERATOR: OILER SUWA2018-004
03/01/2024
$36.39 $16.62 $53.01
PAINTER PAIN0300-003
07/01/2025
$41.24 $14.70 $55.94
PIPEFITTER PLUM0598-001
06/01/2025
$65.20 $34.91 $100.11
PLUMBER PLUM0044-003
06/01/2025
$47.15 $27.20 $74.35
POWER EQUIPMENT OPERATOR: Group 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$41.17 $23.40 $64.57
POWER EQUIPMENT OPERATOR: Group 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$42.31 $23.40 $65.71
POWER EQUIPMENT OPERATOR: Group 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$42.51 $23.40 $65.91
POWER EQUIPMENT OPERATOR: Group 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$42.71 $23.40 $66.11
POWER EQUIPMENT OPERATOR: Group 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$43.05 $23.40 $66.45
POWER EQUIPMENT OPERATOR: Group 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$43.39 $23.40 $66.79
POWER EQUIPMENT OPERATOR: Group 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$45.36 $23.40 $68.76
POWER EQUIPMENT OPERATOR: Group 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg
ENGI0302-136
06/01/2025
$46.34 $23.40 $69.74
ROOFER, EXCLUDES METAL ROOFS ROOF0189-007
07/01/2025
$35.64 $14.89 $50.53
SHEETMETAL WORKER (INCLUDING METAL ROOFING) SHEE0055-010
06/01/2025
$50.00 $28.41 $78.41
TILE FINISHER BRWA0001-023
06/01/2025
$27.26 $11.99 $39.25
TILE SETTER BRWA0001-023
06/01/2025
$36.35 $14.57 $50.92
TRUCK DRIVER: CONCRETE TRUCK TEAM0174-009
06/01/2025
$55.43 $27.52 $82.95
TRUCK DRIVER: DUMP TRUCK TEAM0690-014
06/01/2024
$40.22 $20.93 $61.15
Footnotes in WA20260104 (2)
  • ELEV0019-003 A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.
  • ELEV0019-003 B: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY

Questions about these rates

What is the Davis-Bacon rate for electricians on building work in Columbia County?
On WD WA20260104 Mod 2, published May 18, 2026, the row "ELECTRICIAN" is $60.00 base plus $27.78 fringe, $87.78 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on building work in Columbia County?
On WD WA20260104 Mod 2, published May 18, 2026, the row "PLUMBER" is $47.15 base plus $27.20 fringe, $74.35 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Columbia County?
On WD WA20260104 Mod 2, published May 18, 2026, the row "CARPENTER" is $44.21 base plus $17.28 fringe, $61.49 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with WA20260104

Other counties: all Washington counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.