Davis-Bacon wage rates · Washington
Columbia County building construction wage rates
Federal prevailing wage rates for building construction in Columbia County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260104
- Modification
- 2
- Published
- May 18, 2026
- Classifications
- 40
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260104, Mod 2
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0001-021 06/01/2025 | $39.57 | $20.50 | $60.07 |
| CARPENTER | CARP0059-018 06/01/2025 | $44.21 | $17.28 | $61.49 |
| CEMENT MASON/CONCRETE FINISHER | SUWA2018-004 03/01/2024 | $21.94 | $0.00 | $21.94 |
| ELECTRICIAN | ELEC0112-012 06/01/2025 | $60.00 | $27.78 | $87.78 |
| ELEVATOR MECHANIC Footnote A, B below | ELEV0019-003 01/01/2025 | $67.61 | $38.44 | $106.05 |
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | ASBE0007-007 06/01/2025 | $75.37 | $18.82 | $94.19 |
| IRONWORKER | IRON0014-011 07/07/2025 | $43.40 | $32.77 | $76.17 |
| LABORER, MASON TENDER BRICK | LABO0252-017 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: COMMON OR GENERAL | SUWA2018-004 03/01/2024 | $29.97 | $6.37 | $36.34 |
| LABORER: CONCRETE SAW CHAIN | SUWA2018-004 03/01/2024 | $35.03 | $10.86 | $45.89 |
| LABORER: FIRE WATCH | LABO0335-007 06/01/2025 | $40.56 | $15.60 | $56.16 |
| LABORER: FORM STRIPPING | LABO0242-015 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | LABO0238-042 06/01/2025 | $40.21 | $16.90 | $57.11 |
| LABORER: HOD CARRIER | LABO0238-044 06/01/2025 | $38.05 | $16.75 | $54.80 |
| LABORER: JACKHAMMER | LABO0242-018 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | SUWA2018-004 03/01/2024 | $29.14 | $12.05 | $41.19 |
| LABORER: NOZZLE PERSON | LABO0242-020 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | LABO0238-043 06/01/2025 | $37.80 | $16.90 | $54.70 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUWA2018-004 03/01/2024 | $28.10 | $0.00 | $28.10 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2018-004 03/01/2024 | $40.53 | $9.56 | $50.09 |
| OPERATOR: CONCRETE PUMP | UAVGWA0001 03/01/2024 | $52.92 | $22.63 | $75.55 |
| OPERATOR: DRILL | UAVGWA0002 03/01/2024 | $56.42 | $21.15 | $77.57 |
| OPERATOR: OILER | SUWA2018-004 03/01/2024 | $36.39 | $16.62 | $53.01 |
| PAINTER | PAIN0300-003 07/01/2025 | $41.24 | $14.70 | $55.94 |
| PIPEFITTER | PLUM0598-001 06/01/2025 | $65.20 | $34.91 | $100.11 |
| PLUMBER | PLUM0044-003 06/01/2025 | $47.15 | $27.20 | $74.35 |
POWER EQUIPMENT OPERATOR: Group 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $41.17 | $23.40 | $64.57 |
POWER EQUIPMENT OPERATOR: Group 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $42.31 | $23.40 | $65.71 |
POWER EQUIPMENT OPERATOR: Group 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $42.51 | $23.40 | $65.91 |
POWER EQUIPMENT OPERATOR: Group 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $42.71 | $23.40 | $66.11 |
POWER EQUIPMENT OPERATOR: Group 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $43.05 | $23.40 | $66.45 |
POWER EQUIPMENT OPERATOR: Group 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $43.39 | $23.40 | $66.79 |
POWER EQUIPMENT OPERATOR: Group 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $45.36 | $23.40 | $68.76 |
POWER EQUIPMENT OPERATOR: Group 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & ...POWER EQUIPMENT OPERATOR: Group 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Reg | ENGI0302-136 06/01/2025 | $46.34 | $23.40 | $69.74 |
| ROOFER, EXCLUDES METAL ROOFS | ROOF0189-007 07/01/2025 | $35.64 | $14.89 | $50.53 |
| SHEETMETAL WORKER (INCLUDING METAL ROOFING) | SHEE0055-010 06/01/2025 | $50.00 | $28.41 | $78.41 |
| TILE FINISHER | BRWA0001-023 06/01/2025 | $27.26 | $11.99 | $39.25 |
| TILE SETTER | BRWA0001-023 06/01/2025 | $36.35 | $14.57 | $50.92 |
| TRUCK DRIVER: CONCRETE TRUCK | TEAM0174-009 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK | TEAM0690-014 06/01/2024 | $40.22 | $20.93 | $61.15 |
Footnotes in WA20260104 (2)
- ELEV0019-003 A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.
- ELEV0019-003 B: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Columbia County?
What is the Davis-Bacon rate for plumbers on building work in Columbia County?
What is the Davis-Bacon rate for carpenters on building work in Columbia County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260104
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.