Davis-Bacon wage rates · Washington

Franklin County heavy construction wage rates

Federal prevailing wage rates for heavy construction in Franklin County, Washington, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20263 wage determinations
Wage determination
WA20260002
Modification
2
Published
May 20, 2026
Classifications
52
Other types here
Building, Residential, Highway

3 wage determinations cover heavy work in Franklin County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.

1 of 3: WD WA20260002, Mod 2

Make a WH-347 with these rates
Published May 20, 2026 52 classifications Covers 2 counties Types: Building, Heavy, Highway Source: SAM.gov

Scope as published: D.O.E. Hanford Site Only

Davis-Bacon rates in WA20260002 Mod 2, published 05/20/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKER/HEAT & FROST INSULATOR SUWA2001-001
09/03/2001
$44.51 $22.89 $67.40
BOILERMAKER SUWA2001-001
09/03/2001
$43.83 $32.56 $76.39
BRICKLAYER SUWA2001-001
09/03/2001
$38.48 $20.09 $58.57
CARPENTER: CARPENTERS SUWA2001-001
09/03/2001
$45.86 $16.56 $62.42
CARPENTER: DIVERS SUWA2001-001
09/03/2001
$52.73 $16.56 $69.29
CARPENTER: MILLWRIGHT & MACHINE ERECTOR SUWA2001-001
09/03/2001
$59.83 $19.05 $78.88
CARPENTER: PILEDRIVER SUWA2001-001
09/03/2001
$47.41 $16.56 $63.97
CARPENTER: TENDERS SUWA2001-001
09/03/2001
$51.73 $16.56 $68.29
CEMENT MASON/CONCRETE FINISHER (GROUP 1) Rodding, tamping, floating, troweling, patching, stoning, rubbing, sack rubbing; All exposed aggregate finishing and sealing. All architectural finishing, stai...CEMENT MASON/CONCRETE FINISHER (GROUP 1) Rodding, tamping, floating, troweling, patching, stoning, rubbing, sack rubbing; All exposed aggregate finishing and sealing. All architectural finishing, staining, stamping and coloring, washing and power washing of concrete, polymer, latex and composite materials; Setting of screeds, screeds forms, curb and gutter and sidewalk forms; Preparation of all concrete for caulking of the joints and the caulking of expansion joints; Preparation of concrete for the application of hardners, sealers and curing compounds and their application; Grouting and dry packing of machine base; Removal of snap ties and she bolts prior to patching of concrete
SUWA2001-001
09/03/2001
$39.55 $17.04 $56.59
CEMENT MASON/CONCRETE FINISHER (GROUP 2) Power troweling machine operator; Troweling of magnesite, torganal or material with epoxy bases of oxichloride base; All power grinders, bushing hammer, chippi...CEMENT MASON/CONCRETE FINISHER (GROUP 2) Power troweling machine operator; Troweling of magnesite, torganal or material with epoxy bases of oxichloride base; All power grinders, bushing hammer, chipping gun; Gunite Nozzleman. All sandblasting for architectural finishes, patch preparation and exposing of aggregate for finish; Concrete sawing and cutting for concrete and expansion joints and scoring for decorative patterns; Operating of Clary-type floats, Longitudinal Floats, Rodding Machines and Belting Machines; Scarifiers; Working on scaffolds
SUWA2001-001
09/03/2001
$40.17 $17.04 $57.21
CEMENT MASON/CONCRETE FINISHER (GROUP 3) Grinding, bushing or chipping of toxic materials or high density concrete; Operating of power tools on a scaffold SUWA2001-001
09/03/2001
$40.68 $17.04 $57.72
DRYWALL FINISHER/TAPER SUWA2001-001
09/03/2001
$35.45 $18.13 $53.58
ELECTRICIAN: CABLE SPLICERS SUWA2001-001
09/03/2001
$60.90 $26.01 $86.91
ELECTRICIAN: ELECTRICIANS SUWA2001-001
09/03/2001
$58.00 $25.92 $83.92
IRONWORKER SUWA2001-001
09/03/2001
$41.91 $32.27 $74.18
LABORER: GROUP 1- FLAGMAN, LANDSCAPE LABORER, SCALEMAN, TRAFFIC CONTROL SUPERVISOR, ASBESTOS ABATEMENT WORKER, BRICK PAVERS (TO INCLUDE THE INSTALLATION OF BRICK OR GRASS PAVERS FOR SIDEWALKS, DRIVEWA...LABORER: GROUP 1- FLAGMAN, LANDSCAPE LABORER, SCALEMAN, TRAFFIC CONTROL SUPERVISOR, ASBESTOS ABATEMENT WORKER, BRICK PAVERS (TO INCLUDE THE INSTALLATION OF BRICK OR GRASS PAVERS FOR SIDEWALKS, DRIVEWAYS, STREETS, AND PARKING LOTS), BRUCH HOG FEEDER; CARPENTER TENDER; CEMENT HANDLER; CONCRETE SIGNALMAN; CONCRETE CREWMAN (TO INCLUDE STRIPPING OF FORMS, HAND OPERATING JACKS ON SLIP FORM CONSTRUCTION, APPLICATION OF CONCRETE CURING COMOUNDS, PUMPCRETE MACHINE, SIGNALING, HANDLING THE NOZZLE OF SQUEEZCRETE OR SIMILAR MACHINE-6 INCHES AND SMALLER); CONFINED SPACE ATTENDANT, CRUSHER FEEDER; DEMOLITION (TO INCLUDE CLEAN-UP, BURNING, LOADING, WRECKING AND SALVAGE OF ALL MATERIAL); DRY STACK WALLS (INCLUDING ALL DRY STACK WALLS, INCLUDING KEYSTONE WALLS AND OTHERS USING BLOCKS AND INTERLOCKING PEGS.), DUMPMAN; TRAFFIC CONTROL LABORER (TO INCLUDE BUT IS NOT LIMITED TO, ERECTION AND MAINTENANCE OF BARRICADES, SIGNS AND RELIEF OF FLAG PERSON.), WINDOW WASHER/CLEANER, PILOT CAR, HAZARDOUS WASTE WORKER, EROSION CONTROL LABORER, FENCE ERECTOR, GUARD RAIL (TO INCLUDE GUARD RAIL, GUIDE AND REFERENCE POSTS, SIGN POSTS, AND RIGHT-OF-WAY MARKERS); FIREWATH. FORM CLEANING MACHINE FEEDER; STACKER; GENERAL LABORER; GROUP MACHINE HEADER TENDER; MINER, CLASS "A" (TO INCLUDE BULL GNAG, CONCRETE CREWMAN, DUMPAN AND PUMPCRETE CREWMAN, INCLUDING DISTRIBUTING PIP, ASSEMBLY AND DISMANTLE, AND NIPPER); LEAD ABATEMENT WORKER, MOLD ABATEMENT WORKER, NIPPER; RIPRAP MAN; SANDBLAST TAILHOSEMAN, SCAFFOLD ERECTOR (WOOD OR STEEL); STAKE JUMPER; STRUCTURAL MOVER (TO INCLUDE SEPARATING FOUNDATION, PREPARATION, CRIBBING, SHORING, JACKING AND UNLOADING OF STRUCTURES); TAILHOSEMAN (WATER NOSSEL); TIMBER BUCKER AND FALLER (BY HAND); TRACK LABORER (RR); TRUCK LOADER; WELLPOINT MAN; (hdpe OR SIMILAR LINER INSTALLER)
SUWA2001-001
09/03/2001
$35.10 $16.30 $51.40
LABORER: GROUP 2- ASPHALT ROLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMAN, NON-MECHANICAL; DRILLER TENDER (WHEN REQUIRED TO MOVE AND POSITION MACHINE...LABORER: GROUP 2- ASPHALT ROLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMAN, NON-MECHANICAL; DRILLER TENDER (WHEN REQUIRED TO MOVE AND POSITION MACHINE); FORM SETTER, PAVING; JACKHAMMER OPERATOR; MINER, CLASS "B" (TO INCLUDE BRAKEMAN, FINISHER, VIBRATOR, AND FORM SETTER); NOZZLEMAN (TO INCLUDE SQUEEZE AND FLOW-CRETE NOZZLE); NOZZLEMAN, WATER, (TO INCLUDE FIRE HOSE), AIR OR STEAM; PAVEMENT BREAKER (UNDER 90 LBS); PIPELAYER, CORRUGATED METAL AND MULTI-PLATE; POT TENDER; POWER BUGGY OPERATOR; POWER TOOL OPERATOR, GAS, ELECTRICAL, PNEUMATIC; RODDER AND SPREADER; TRENCHER, SHAWNEE; TUGGER OPERATOR; WAGON DRILLS; WHEELBARROW, POWER DRIVEN; WATER PIPE LINER, RIGGER/SIGNALPERSON, REMOTE EQUIPMENT OPERATOR (I.E. COMPACTION AND EMOLITION) COMPACTION EQUIPMENT (TO INCLUDE ALL HAND OPERATORED POWER COMPACTION EQUIPMENT); RAILROAD POWER SPIKER OR PULLER, DUAL MOBILE; RAILROAD EQUIPMENT, POWER DRIVEN, EXCEPT DUAL MOBILE POWER SPIKER OR PULLER
SUWA2001-001
09/03/2001
$35.42 $16.30 $51.72
LABORER: GROUP 3- AIR AND HYDRAULIC TRACK DRILL, ASPHALT RAKER, BRUSH MACHINE (TO INCLUDE HORIZONTAL CONSTRUCTION JOINT CLEAN-UP BRUSH MACHINE, POWER PROPELLED); CAISSON WORKER, FREE AIR; CHAIN SAW OP...LABORER: GROUP 3- AIR AND HYDRAULIC TRACK DRILL, ASPHALT RAKER, BRUSH MACHINE (TO INCLUDE HORIZONTAL CONSTRUCTION JOINT CLEAN-UP BRUSH MACHINE, POWER PROPELLED); CAISSON WORKER, FREE AIR; CHAIN SAW OPERATOR AND FALLER; CONCRETE STACK (TO INCLUDE LABORERS WHEN WORKING ON FREE STANDING CONCRETE STACKS FOR SMOKE OR FUME CONTROL ABOVE 40 FT HIGH); FUNNITE (TO INCLUDE OPERATION OF MACHINE AND NOZZLE); GUNNITE (TO INCLUDE OPERATION OF MACHINE AND NOZZEL); HIGH SCALER; MINER, CLASS "C" (TO INCLUDE MINER, NOZZLEMAN FOR CONCRETE, LASER BEAM OPERATOR, AND RIGGER ON TUNNELS); MONITOR OPERATOR (AIR TRACK OR SIMILAR MOUNTING); MORTAR MIXER; NOZZLEMAN (TO INCLUDE JET BLASTING NOZZLEMAN, OVER 1200 LBS., JET BLAST MACHINE, POWER PROPELLED, SANDBLAST NOZZLE, SQUEEZE AND FLO-CRETE NOZZLE); PAVEMENT BREAKER, 90 LBS. & OVER; PIPELAYER (TO INCLUDE WORKING TOPMAN, CAULKER, COLLARMAN, JOINTER, MORTARMAN, RIGGER, JACKER, SHORER, VALVE OR METER INSTALLER, TEMPER, (INCLUDING PRESSURIZED AND NON-PRESSURIZED DUCTILE PIPE, GRAVITY PIPE AND HDPE (FUSED AND NON-FUSED); PIPEWRAPPER; PLASTERER TENDER, TRENCHLESS TECHNOLOGY, VIBRATORS (ALL); LASER BEAM OPERATOR (ELEVATION CONTROL; TECHNICIAN)
SUWA2001-001
09/03/2001
$35.74 $16.30 $52.04
LABORER: GROUP 4 Drills with dual masts, Miner, Class ""D""(to include Raise and Shaft Miner, Laser Beam Operator on raises and shafts.) Welder, electric, manual or automatic, Remote Equipment Operato...LABORER: GROUP 4 Drills with dual masts, Miner, Class ""D""(to include Raise and Shaft Miner, Laser Beam Operator on raises and shafts.) Welder, electric, manual or automatic, Remote Equipment Operator (to include HDPE or similar pipe and liner)
SUWA2001-001
09/03/2001
$36.06 $16.30 $52.36
LABORER: GROUP 5 OUTSIDE LOCK AND GAUGE TENDER (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$288.48
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(1-14 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$295.84
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(14-18 LBS),(6 HRS)] RATE PER SHIFT(RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$300.77
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(18-22 LBS),(6 HRS)] RATE PER SHIFT. (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$301.05
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(22-26 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$305.37
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(26-32 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$307.99
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(32-38 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$310.95
per shift
$16.30 see note
LABORER: GROUP 5 SANDHOGS-[(38-44 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) per shift: amounts are shown as printed SUWA2001-001
09/03/2001
$312.36
per shift
$16.30 see note
LABORER: GROUP 6 Construction Specialist SUWA2001-001
09/03/2001
$35.94 $16.30 $52.24
LABORER: GROUP 7 Hod Carrier SUWA2001-001
09/03/2001
$37.10 $16.30 $53.40
LABORER: GROUP 8 Powderman SUWA2001-001
09/03/2001
$37.65 $16.30 $53.95
LABORER: GROUP 9 Grade Checker SUWA2001-001
09/03/2001
$38.03 $16.30 $54.33
PAINTER (SOFT FLOOR COVERS, GLAZIERS, SPRAY PAINTERS, STEEL PAINTERS, STEAM CLEAN AND ACID ETCHING, SIGN WRITERS) SUWA2001-001
09/03/2001
$38.11 $16.27 $54.38
PLUMBER/PIPEFITTER SUWA2001-001
09/03/2001
$62.95 $33.76 $96.71
POWER EQUIPMENT OPERATOR: GROUP 1 Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel or electric power); Crusher Feeder (mechanical); Deck Hand; Drillers Tender; Fireman an...POWER EQUIPMENT OPERATOR: GROUP 1 Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel or electric power); Crusher Feeder (mechanical); Deck Hand; Drillers Tender; Fireman and Heater Tender; Grade Checker; Tender Mechanic, Welder H.D.; Hydro- seeder, Mulcher, Nozzleman; Oiler; Oiler and Cable Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade (farm type, Case, John Deere and similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Steam Cleaner; Welding Machine
SUWA2001-001
09/03/2001
$35.91 $22.45 $58.36
POWER EQUIPMENT OPERATOR: GROUP 2 A-Frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Be...POWER EQUIPMENT OPERATOR: GROUP 2 A-Frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog; Compresor (2000 CFM or over, 2 or more, gas, diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator, hoisting materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, Hydra-lift and similar; Gin Trucks (pipeline); Hoist, single drum; Loaders (bucket, elevators and conveyors); Longitudinal Float; Mixer (portable - concrete); Pavement Breaker, Hydra-hammer and similar; Power Broom; Spray Curing Machine (concrete); Spreader Box (self-propelled); Straddle Buggy (Ross and similar on construction job only); Tractor (Farm type R/T with attachments, except Backhoe); Tugger Operator
SUWA2001-001
09/03/2001
$36.28 $22.45 $58.73
POWER EQUIPMENT OPERATOR: GROUP 3 A-Frame Truck (2 or more drums); Assistant Regrigeration Plant and Chiller Operator (over 1000 ton); Backfillers (Cleveland and similar); Batch Plant and Wet Mix Oper...POWER EQUIPMENT OPERATOR: GROUP 3 A-Frame Truck (2 or more drums); Assistant Regrigeration Plant and Chiller Operator (over 1000 ton); Backfillers (Cleveland and similar); Batch Plant and Wet Mix Operator single unit (concrete); Belt-crete Conveyors with power pack or similar; Belt Laoder (Kocal or similar); Bend Machine; Bob Cat; Boring Machine (earth); Boring Machine (rock under 8 inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete) Chipper (without crane), Cleaning and Doping Machine (pipeline); Curb Extruder (Asphalt and Concrete); Deck Engineer; Elevating Belt-type Loader (Euclid, Barber Green and similar); Elevating Grader-type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel, electric); Gunite Combination Mixer and Compressor; Locomotive Engineer; Mixermobile; Posthole Auger or Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Surface Heater and Planer Machine; Tractor (to D-6 or equivalent) and Traxacavator; Traverse Finish Machine; Turnhead Operator
SUWA2001-001
09/03/2001
$36.99 $22.45 $59.44
POWER EQUIPMENT OPERATOR: GROUP 4 Blade Operator (motor patrol and attachments); Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman and similar); Drilling Equipment (8 inch bit and over) (...POWER EQUIPMENT OPERATOR: GROUP 4 Blade Operator (motor patrol and attachments); Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman and similar); Drilling Equipment (8 inch bit and over) (Robbins, reverse circulation and similar); Drills (Churn, Core, Calyx, or Diamond); Equipment Serviceman, Greaser and Oiler; Hoe Ram; Hoist (2 or more drums or Tower Hoist); Loaders (overhead and front-end, under 4 yards R/T);Paving (Dual Drum) Rubber Tire; Refrigeration Plant Engineers (under 1000 ton); Signalman (Whileys, Highline, Hammerheads or similar); Skidders (R/T with or without attachments); Screed Operator; Trenching Machines (under 7 ft depth capacity); Vacuum Drill (reverse circulation drill under 8 inch bit)
SUWA2001-001
09/03/2001
$37.34 $22.45 $59.79
POWER EQUIPMENT OPERATOR: GROUP 5 Automatic Subgrader (Ditches and Trimmers) (Autograde, ABC, R.A. Hansen and similar on grade wire); Backhoe (under 1 yd); Batch Plant (over 4 units); Batch and Wet Mi...POWER EQUIPMENT OPERATOR: GROUP 5 Automatic Subgrader (Ditches and Trimmers) (Autograde, ABC, R.A. Hansen and similar on grade wire); Backhoe (under 1 yd); Batch Plant (over 4 units); Batch and Wet Mix Operator (mutiple units, 2 and including 4); Boat Operator; Cableway Controller (dispatcher); Concrete Pump Boom Truck; Conveyor Aggregate Placement Equipment; Cranes (25 tons and under); Derricks and Stifflegs (under 65 tons); Drill Doctor; Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Piledriving Engineers; Rollerman (finishing pavement); Trenching Machines (7 ft depth and over). ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft.50 hr. additional to classification Over 200 ft.80 hr. additional to classificaiton
SUWA2001-001
09/03/2001
$37.64 $22.45 $60.09
POWER EQUIPMENT OPERATOR: GROUP 6 Asphalt Plant Operator (Backhoes (1 yd to 3 yds); Blade (finish and bluetop) Automatic, CMI, ABC and similar when used as automatic; Boom Cats (side); Cableway Operat...POWER EQUIPMENT OPERATOR: GROUP 6 Asphalt Plant Operator (Backhoes (1 yd to 3 yds); Blade (finish and bluetop) Automatic, CMI, ABC and similar when used as automatic; Boom Cats (side); Cableway Operators; Clamshell Operators (under 3 yds); Concrete Slip Form Paver; Cranes (over 25 tons, including 45 tons); Crusher, Grizzle and Screening Plant Operator; Draglines (under 3 yds); Elevating Belt (holland type); Gradall (1 yd to 3 yds); Loader Operator (front-end and overhead, 4 yards, including 8 yds); Mucking Machine; Quadtrack or similar equipment; Rubber-tired Scrapers; Shovels (under 3 yds); Tractors (D-6 and equivalent and over); Vactor Guzzler, Super Sucker; Concrete Cleaning/Decontamination Machine; Ultra High Pressure Waterjet Cutting Tool System (30,000 psi) ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft.50 hr. additional to classification Over 200 ft.80 hr. additional to classificaiton
SUWA2001-001
09/03/2001
$37.96 $22.45 $60.41
POWER EQUIPMENT OPERATOR: GROUP 7 Backhoes (3 yds and over); Cranes (All Cranesover 45 tons, including 100 tons) Climbing, Rail and Tower Cranes up to including 45 tons; Clamshell Operator (3 yds. and...POWER EQUIPMENT OPERATOR: GROUP 7 Backhoes (3 yds and over); Cranes (All Cranesover 45 tons, including 100 tons) Climbing, Rail and Tower Cranes up to including 45 tons; Clamshell Operator (3 yds. and over); Derricks and Stifflegs (65 tons and over); Draglines (3 yds and over); Lead Water Well Driller; Loader (360 degrees revolving Koehring Scooper or similar); Loaders (overhead and front-end, over 8 yds); Shovels (3 yds and over); Whirleys and Hammerheads, all; Vacuum Blasting Machine Operator; HD Mechanic/welder ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft.50 hr. additional to classification Over 200 ft.80 hr. additional to classificaiton. ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft.50 hr. additional to classification Over 200 ft.80 hr. additional to classificaiton
SUWA2001-001
09/03/2001
$39.11 $22.45 $61.56
POWER EQUIPMENT OPERATOR: GROUP 8 Cranes(all cranes over 100 tons); Climbing, Rail and Tower Cranes over 45 tons ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of s...POWER EQUIPMENT OPERATOR: GROUP 8 Cranes(all cranes over 100 tons); Climbing, Rail and Tower Cranes over 45 tons ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft.50 hr. additional to classification Over 200 ft.80 hr. additional to classificaiton. ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft.50 hr. additional to classification Over 200 ft.80 hr. additional to classificaiton
SUWA2001-001
09/03/2001
$41.22 $22.45 $63.67
ROOFER (INCLUDING WATERPROOFER AND KETTLEMAN) SUWA2001-001
09/03/2001
$34.72 $13.31 $48.03
SHEET METAL WORKER SUWA2001-001
09/03/2001
$47.76 $27.70 $75.46
SPRINKLER FITTER SUWA2001-001
09/03/2001
$41.33 $28.58 $69.91
TRUCK DRIVER: GROUP 1 Escort Driver or Pilot Car tender and swamper, Pickup Hauling Employees or Materials SUWA2001-001
09/03/2001
$33.83 $21.81 $55.64
TRUCK DRIVER: GROUP 2 Flat Bed Truck, single rear axle; Fork Lift, 3000 lbs and under; Leverperson Loading Trucks at Bunkers; Seeder and Mulcher; Stationary Fuel Operator; Team Driver; Tractor (small ...TRUCK DRIVER: GROUP 2 Flat Bed Truck, single rear axle; Fork Lift, 3000 lbs and under; Leverperson Loading Trucks at Bunkers; Seeder and Mulcher; Stationary Fuel Operator; Team Driver; Tractor (small rubber tired, pulling trailer or similar equipment); Trailer Mounted hydro Seeder and Mulcher; Water Tank Truck, up to 1800 gallons
SUWA2001-001
09/03/2001
$36.47 $21.81 $58.28
TRUCK DRIVER: GROUP 3 Bus Driver or Employee Haul Driver; Flat Bed Truck, dual rear axle; Power Boat hauling employees or material SUWA2001-001
09/03/2001
$36.58 $21.81 $58.39
TRUCK DRIVER: GROUP 4 Buggy Mobile and similar; Bulk Cement Tanks and Spreader; Power Operated Sweeper; Straddle Carrier (Ross, Hyster and similar); Water Tank Truck, 1801-4000 gallons SUWA2001-001
09/03/2001
$36.91 $21.81 $58.72
TRUCK DRIVER: GROUP 5 Auto Crane, 2000 lbs capacity; Dumptor (6 yds and under); Flat Bed Truck (with hydraulic system); Fork Lift (3001-16,000 lbs); Fuel Truck Driver, steam cleaner and washer; Rubber...TRUCK DRIVER: GROUP 5 Auto Crane, 2000 lbs capacity; Dumptor (6 yds and under); Flat Bed Truck (with hydraulic system); Fork Lift (3001-16,000 lbs); Fuel Truck Driver, steam cleaner and washer; Rubber-tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driver; Transite Mixers & mixers hauling concrete 3 yd to and including 6 yd.; Wrecker and Tow Trucks
SUWA2001-001
09/03/2001
$37.02 $21.81 $58.83
TRUCK DRIVER: GROUP 6 A-Frame; Service Greaser; Tireperson; Truck, side, end, and bottom & articulated end dump (up to and including 12 yds); Water Tank Truck, 4001 to 8000 gallons, Warehouseperson, t...TRUCK DRIVER: GROUP 6 A-Frame; Service Greaser; Tireperson; Truck, side, end, and bottom & articulated end dump (up to and including 12 yds); Water Tank Truck, 4001 to 8000 gallons, Warehouseperson, to include shipping and receiving
SUWA2001-001
09/03/2001
$37.22 $21.81 $59.03
TRUCK DRIVER: GROUP 7 Dumps, semi-end; Flagerty Spreader Box Driver; Flowboys; Fork lift, 16,000 lbs and over; Lowboy, 50 tons and under; Mechanic, Field; Oil Distributors Driver (road, bootperson, le...TRUCK DRIVER: GROUP 7 Dumps, semi-end; Flagerty Spreader Box Driver; Flowboys; Fork lift, 16,000 lbs and over; Lowboy, 50 tons and under; Mechanic, Field; Oil Distributors Driver (road, bootperson, leverperson); and Oil Tank Driver; Self-Loading Roll Off and Dumpster over 6 yds; Stringer Truck (cable operated trailer); Tractor with Steer Trailer; Transfer Truck & Trailer; Transit Mixers & Truck Hauling Concrete: over 6 yards to and including 20 yards; Truck & Pup; Trucks, side, end, bottom, & articulated end dump: over 12 yards to and including 100 yards; Truck Mounted Crane (with load-bearing surface, either mounted or pulled) up to 14 tons; Turnarocker, DWs & similar, with 2 or or more 4 wheel-power tractor with trailer, gallonage or yardage scale, whichever is greater; Vacuum truck (super sucker, guzzler, etc.); Water Tank Truck, 8,001 to 14,000; Semi-truck and Trailer, 50 tons and under Lowboy
SUWA2001-001
09/03/2001
$37.56 $21.81 $59.37
TRUCK DRIVER: GROUP 8 Lowboy, over 50 tons; Prime movers & stinger truck; Transit Mixers and truck hauling concrete, over 20 yards; Trucks, side, end bottom and articulated end dump, over 100 yards SUWA2001-001
09/03/2001
$37.88 $21.81 $59.69

2 of 3: WD WA20260138, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 42 classifications Covers 2 counties Types: Heavy Source: SAM.gov

Scope as published: Excludes D.O.E. Hanford Site

Davis-Bacon rates in WA20260138 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
CARPENTER CARP0059-012
06/01/2025
$44.21 $17.28 $61.49
CEMENT MASON/CONCRETE FINISHER PLAS0072-005
06/01/2025
$40.89 $18.64 $59.53
ELECTRICIAN ELEC0112-010
06/01/2025
$60.00 $27.78 $87.78
GRADE CHECKER SUWA2018-038
03/01/2024
$31.40 $14.10 $45.50
IRONWORKER IRON0014-010
07/07/2025
$43.40 $32.77 $76.17
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR SUWA2018-038
03/01/2024
$36.96 $8.56 $45.52
LABORER: COMMON OR GENERAL SUWA2018-038
03/01/2024
$29.27 $12.01 $41.28
LABORER: CONCRETE SAW CHAIN SUWA2018-038
03/01/2024
$36.24 $10.89 $47.13
LABORER: FENCE ERECTOR SUWA2018-038
03/01/2024
$30.21 $0.00 $30.21
LABORER: HOD CARRIER SUWA2018-038
03/01/2024
$35.06 $10.94 $46.00
LABORER: MASON TENDER - CEMENT/CONCRETE SUWA2018-038
03/01/2024
$27.51 $2.96 $30.47
LABORER: NOZZLE PERSON LABO0242-010
06/01/2025
$52.31 $17.01 $69.32
LABORER: PIPELAYER LABO0348-010
06/01/2025
$37.80 $16.90 $54.70
LINE CONSTRUCTION: (GROUND PERSON) ELEC0077-006
02/01/2023
$37.53 $17.74 $55.27
LINE CONSTRUCTION: EQUIPMENT OPERATOR ELEC0077-005
02/01/2024
$55.19 $20.94 $76.13
LINE CONSTRUCTION: LINE PERSON ELEC0077-002
02/01/2024
$64.17 $24.54 $88.71
OPERATOR: CRANE UAVGWA0019
03/01/2024
$54.41 $25.11 $79.52
OPERATOR: FORKLIFT SUWA2018-038
03/01/2024
$45.93 $19.20 $65.13
PAINTER PAIN0300-002
07/01/2025
$41.24 $14.70 $55.94
POWER EQUIPMENT OPERATOR: Group 1(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 1(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$41.17 $23.40 $64.57
POWER EQUIPMENT OPERATOR: Group 1(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 1(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$38.17 $23.40 $61.57
POWER EQUIPMENT OPERATOR: Group 2(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 2(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$41.56 $23.40 $64.96
POWER EQUIPMENT OPERATOR: Group 2(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 2(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$38.56 $23.40 $61.96
POWER EQUIPMENT OPERATOR: Group 3(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 3(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$42.31 $23.40 $65.71
POWER EQUIPMENT OPERATOR: Group 3(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 3(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$39.31 $23.40 $62.71
POWER EQUIPMENT OPERATOR: Group 4(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 4(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$42.51 $23.40 $65.91
POWER EQUIPMENT OPERATOR: Group 4(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 4(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$39.51 $23.40 $62.91
POWER EQUIPMENT OPERATOR: Group 5(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 5(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$42.71 $23.40 $66.11
POWER EQUIPMENT OPERATOR: Group 5(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 5(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$39.71 $23.40 $63.11
POWER EQUIPMENT OPERATOR: Group 6(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 6(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$43.05 $23.40 $66.45
POWER EQUIPMENT OPERATOR: Group 6(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 6(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$40.05 $23.40 $63.45
POWER EQUIPMENT OPERATOR: Group 7(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 7(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$43.39 $23.40 $66.79
POWER EQUIPMENT OPERATOR: Group 7(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 7(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$40.39 $23.40 $63.79
POWER EQUIPMENT OPERATOR: Group 8(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 8(COLUMBIA COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-141
06/01/2025
$45.36 $23.40 $68.76
POWER EQUIPMENT OPERATOR: Group 8(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 &am...POWER EQUIPMENT OPERATOR: Group 8(FRANKLIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards; Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards,
ENGI0302-140
06/01/2025
$42.36 $23.40 $65.76
TRAFFIC CONTROL: FLAGGER LABO0238-040
06/01/2025
$34.03 $16.90 $50.93
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER SUWA2018-038
03/01/2024
$30.61 $10.89 $41.50
TREE TRIMMER ELEC0077-003
02/01/2023
$42.57 $17.97 $60.54
TREE TRIMMER: GROUND PERSON ELEC0077-003
02/01/2023
$22.60 $16.37 $38.97
TRUCK DRIVER: ASPHALT MIX TEAM0313-001
06/01/2025
$55.43 $27.52 $82.95
TRUCK DRIVER: DUMP TRUCK SUWA2018-038
03/01/2024
$29.55 $15.38 $44.93
TRUCK DRIVER: WATER TRUCK SUWA2018-038
03/01/2024
$31.62 $16.84 $48.46

3 of 3: WD WA20260080, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 36 classifications Covers 39 counties Types: Heavy Source: SAM.gov

Scope as published: Dredging Construction Projects (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in WA20260080 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
DREDGING: ASSISTANT ENGINEER ZONE A ENGI0701-003
01/01/2024
$53.31 $16.70 $70.01
DREDGING: ASSISTANT ENGINEER ZONE B ENGI0701-003
01/01/2024
$56.31 $16.70 $73.01
DREDGING: ASSISTANT ENGINEER ZONE C ENGI0701-003
01/01/2024
$59.31 $16.70 $76.01
DREDGING: ASSISTANT MATE ZONE A ENGI0701-003
01/01/2024
$47.95 $16.70 $64.65
DREDGING: ASSISTANT MATE ZONE B ENGI0701-003
01/01/2024
$50.95 $16.70 $67.65
DREDGING: ASSISTANT MATE ZONE C ENGI0701-003
01/01/2024
$53.95 $16.70 $70.65
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A ENGI0701-003
01/01/2024
$56.47 $16.70 $73.17
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B ENGI0701-003
01/01/2024
$59.47 $16.70 $76.17
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C ENGI0701-003
01/01/2024
$62.47 $16.70 $79.17
DREDGING: LEVERMAN, HYDRAULIC ZONE A ENGI0701-003
01/01/2024
$56.47 $16.70 $73.17
DREDGING: LEVERMAN, HYDRAULIC ZONE B ENGI0701-003
01/01/2024
$59.47 $16.70 $76.17
DREDGING: LEVERMAN, HYDRAULIC ZONE C ENGI0701-003
01/01/2024
$62.47 $16.70 $79.17
DREDGING: TENDERMAN ZONE A ENGI0701-003
01/01/2024
$51.82 $16.70 $68.52
DREDGING: TENDERMAN ZONE B ENGI0701-003
01/01/2024
$54.82 $16.70 $71.52
DREDGING: TENDERMAN ZONE C ENGI0701-003
01/01/2024
$57.82 $16.70 $74.52
DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$35.93 $17.40 $53.33
DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF T...DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$36.93 $17.40 $54.33
DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HAR...DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$37.35 $17.40 $54.75
DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$38.39 $17.40 $55.79
DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANO...DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$36.93 $17.40 $54.33
DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WES...DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA
ENGI0302-030
06/01/2014
$37.35 $17.40 $54.75
HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$29.76 $20.65 $50.41
HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$30.08 $20.65 $50.73
HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$30.69 $20.65 $51.34
HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$30.85 $20.65 $51.50
HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$31.01 $20.65 $51.66
HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$31.29 $20.65 $51.94
HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES)
ENGI0302-128
06/01/2021
$31.56 $20.65 $52.21
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE ...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$60.63 $27.32 $87.95
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 T...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$60.63 $27.32 $87.95
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILE...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$62.32 $27.32 $89.64
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZON...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$62.32 $27.32 $89.64
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS ...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$64.11 $27.32 $91.43
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$64.11 $27.32 $91.43
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 ...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-013
06/01/2025
$59.96 $27.32 $87.28
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) -...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA
ENGI0612-002
06/01/2025
$59.96 $27.32 $87.28

Questions about these rates

What is the Davis-Bacon rate for electricians on heavy work in Franklin County?
On WD WA20260002 Mod 2, published May 20, 2026, the row "ELECTRICIAN: ELECTRICIANS" is $58.00 base plus $25.92 fringe, $83.92 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on heavy work in Franklin County?
On WD WA20260002 Mod 2, published May 20, 2026, the row "PLUMBER/PIPEFITTER" is $62.95 base plus $33.76 fringe, $96.71 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on heavy work in Franklin County?
On WD WA20260002 Mod 2, published May 20, 2026, the row "CARPENTER: TENDERS" is $51.73 base plus $16.56 fringe, $68.29 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as heavy construction?
Projects that are not building, residential or highway: for example dams, sewer and water lines, utilities and other civil work. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with WA20260002

Other counties: all Washington counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.