Davis-Bacon wage rates · Washington

Grant County building construction wage rates

Federal prevailing wage rates for building construction in Grant County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
WA20260026
Modification
2
Published
May 18, 2026
Classifications
30
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.

WD WA20260026, Mod 2

Make a WH-347 with these rates
Published May 18, 2026 30 classifications Covers 1 county Types: Building Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in WA20260026 Mod 2, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BRICKLAYER BRWA0003-002
06/01/2021
$33.95 $19.33 $53.28
CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) CARP0059-022
06/01/2025
$44.21 $17.28 $61.49
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 4...CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE
PLAS0072-008
06/01/2025
$40.89 $18.64 $59.53
ELECTRICIAN ELEC0191-015
06/01/2020
$46.15 $26.10 $72.25
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL IRON0014-012
07/07/2025
$43.40 $32.77 $76.17
LABORER, MASON TENDER BRICK LABO0238-007
06/01/2025
$38.05 $16.75 $54.80
LABORER: A-2: GROUP 10 GRADE CHECKER LABO0238-025
06/01/2025
$43.21 $16.90 $60.11
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER LABO0238-025
06/01/2025
$40.13 $16.90 $57.03
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER LABO0238-025
06/01/2025
$40.46 $16.90 $57.36
METAL BUILDING ERECTOR SUWA2002-006
06/18/2009
$11.30 $3.58 $14.88
OPERATOR: BOBCAT/SKID STEER/SKID LOADER SUWA2002-006
06/18/2009
$27.94 $0.00 $27.94
PAINTER (BRUSH & SPRAY ONLY) PAIN0427-004
07/01/2025
$33.95 $15.65 $49.60
PAINTER: DRYWALL FINISHING/TAPING SUWA2002-006
06/18/2009
$25.17 $4.41 $29.58
PAINTER: ROLLER SUWA2002-006
06/18/2009
$22.06 $2.72 $24.78
PIPE INSULATOR/WRAPPER SUWA2002-006
06/18/2009
$24.21 $4.07 $28.28
PIPEFITTER PLUM0598-018
06/01/2025
$65.20 $34.91 $100.11
PLUMBER SUWA2002-006
06/18/2009
$35.00 $0.00 $35.00
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS ENGI0302-132
06/01/2025
$41.17 $23.40 $64.57
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT ENGI0302-132
06/01/2025
$41.56 $23.40 $64.96
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) ENGI0302-132
06/01/2025
$42.31 $23.40 $65.71
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) ENGI0302-132
06/01/2025
$42.51 $23.40 $65.91
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) ENGI0302-132
06/01/2025
$42.71 $23.40 $66.11
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T...POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC
ENGI0302-132
06/01/2025
$43.05 $23.40 $66.45
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) ENGI0302-132
06/01/2025
$43.39 $23.40 $66.79
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) ENGI0302-132
06/01/2025
$45.36 $23.40 $68.76
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) ROOF0189-001
07/01/2025
$35.75 $14.40 $50.15
SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) SHEE0055-012
06/01/2025
$45.83 $27.92 $73.75
SPRINKLER FITTER (FIRE SPRINKLERS) SFWA0699-005
04/01/2025
$44.30 $28.58 $72.88
TILE SETTER BRWA0003-009
06/01/2021
$29.86 $13.95 $43.81
TRUCK DRIVER, INCLUDES DUMP TRUCK SUWA2002-006
06/18/2009
$23.50 $6.87 $30.37

Questions about these rates

What is the Davis-Bacon rate for electricians on building work in Grant County?
On WD WA20260026 Mod 2, published May 18, 2026, the row "ELECTRICIAN" is $46.15 base plus $26.10 fringe, $72.25 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on building work in Grant County?
On WD WA20260026 Mod 2, published May 18, 2026, the row "PLUMBER" is $35.00 base plus $0.00 fringe, $35.00 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Grant County?
On WD WA20260026 Mod 2, published May 18, 2026, the row "CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK)" is $44.21 base plus $17.28 fringe, $61.49 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with WA20260026

Other counties: all Washington counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.