Davis-Bacon wage rates · Washington
Grant County building construction wage rates
Federal prevailing wage rates for building construction in Grant County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260026
- Modification
- 2
- Published
- May 18, 2026
- Classifications
- 30
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260026, Mod 2
Make a WH-347 with these ratesSome rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0003-002 06/01/2021 | $33.95 | $19.33 | $53.28 |
| CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) | CARP0059-022 06/01/2025 | $44.21 | $17.28 | $61.49 |
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 4...CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | PLAS0072-008 06/01/2025 | $40.89 | $18.64 | $59.53 |
| ELECTRICIAN | ELEC0191-015 06/01/2020 | $46.15 | $26.10 | $72.25 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | IRON0014-012 07/07/2025 | $43.40 | $32.77 | $76.17 |
| LABORER, MASON TENDER BRICK | LABO0238-007 06/01/2025 | $38.05 | $16.75 | $54.80 |
| LABORER: A-2: GROUP 10 GRADE CHECKER | LABO0238-025 06/01/2025 | $43.21 | $16.90 | $60.11 |
| LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER | LABO0238-025 06/01/2025 | $40.13 | $16.90 | $57.03 |
| LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER | LABO0238-025 06/01/2025 | $40.46 | $16.90 | $57.36 |
| METAL BUILDING ERECTOR | SUWA2002-006 06/18/2009 | $11.30 | $3.58 | $14.88 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2002-006 06/18/2009 | $27.94 | $0.00 | $27.94 |
| PAINTER (BRUSH & SPRAY ONLY) | PAIN0427-004 07/01/2025 | $33.95 | $15.65 | $49.60 |
| PAINTER: DRYWALL FINISHING/TAPING | SUWA2002-006 06/18/2009 | $25.17 | $4.41 | $29.58 |
| PAINTER: ROLLER | SUWA2002-006 06/18/2009 | $22.06 | $2.72 | $24.78 |
| PIPE INSULATOR/WRAPPER | SUWA2002-006 06/18/2009 | $24.21 | $4.07 | $28.28 |
| PIPEFITTER | PLUM0598-018 06/01/2025 | $65.20 | $34.91 | $100.11 |
| PLUMBER | SUWA2002-006 06/18/2009 | $35.00 | $0.00 | $35.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | ENGI0302-132 06/01/2025 | $41.17 | $23.40 | $64.57 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | ENGI0302-132 06/01/2025 | $41.56 | $23.40 | $64.96 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | ENGI0302-132 06/01/2025 | $42.31 | $23.40 | $65.71 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | ENGI0302-132 06/01/2025 | $42.51 | $23.40 | $65.91 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) | ENGI0302-132 06/01/2025 | $42.71 | $23.40 | $66.11 |
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T...POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | ENGI0302-132 06/01/2025 | $43.05 | $23.40 | $66.45 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | ENGI0302-132 06/01/2025 | $43.39 | $23.40 | $66.79 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | ENGI0302-132 06/01/2025 | $45.36 | $23.40 | $68.76 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | ROOF0189-001 07/01/2025 | $35.75 | $14.40 | $50.15 |
| SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | SHEE0055-012 06/01/2025 | $45.83 | $27.92 | $73.75 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SFWA0699-005 04/01/2025 | $44.30 | $28.58 | $72.88 |
| TILE SETTER | BRWA0003-009 06/01/2021 | $29.86 | $13.95 | $43.81 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | SUWA2002-006 06/18/2009 | $23.50 | $6.87 | $30.37 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Grant County?
What is the Davis-Bacon rate for plumbers on building work in Grant County?
What is the Davis-Bacon rate for carpenters on building work in Grant County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260026
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.