Davis-Bacon wage rates · Washington

Island County building construction wage rates

Federal prevailing wage rates for building construction in Island County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
WA20260028
Modification
1
Published
May 18, 2026
Classifications
32
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.

WD WA20260028, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 32 classifications Covers 1 county Types: Building Source: SAM.gov

Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.

Davis-Bacon rates in WA20260028 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) ASBE0007-003
06/01/2025
$75.37 $18.82 $94.19
BRICKLAYER BRWA0001-015
06/01/2025
$55.34 $20.05 $75.39
CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) CARP0425-003
06/01/2025
$63.98 $19.13 $83.11
CEMENT MASON/CONCRETE FINISHER PLAS0528-004
06/01/2024
$54.16 $21.27 $75.43
DRYWALL FINISHER/TAPER PAIN0364-001
07/01/2025
$53.59 $23.65 $77.24
ELECTRICIAN (ISLAND, SAN JUAN, SKAGIT, SNOHOMISH AND WHATCOM COUNTIES) ELEC0191-013
06/01/2022
$53.20 $27.51 $80.71
GLAZIER PAIN0188-001
07/01/2025
$61.14 $23.76 $84.90
IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL) IRON0086-011
07/07/2025
$57.94 $34.52 $92.46
LABORER: COMMON OR GENERAL SUWA2002-008
06/18/2009
$17.75 $4.23 $21.98
LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABER...LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL
LABO0292-004
06/01/2025
$51.52 $16.99 $68.51
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVE...LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL
LABO0292-004
06/01/2025
$52.31 $17.01 $69.32
MILLWRIGHT CARP0096-001
06/01/2025
$55.39 $22.38 $77.77
OPERATOR: BOBCAT/SKID STEER/SKID LOADER SUWA2002-008
06/18/2009
$27.94 $0.00 $27.94
PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING) PAIN0300-004
07/01/2025
$41.24 $14.70 $55.94
PAINTER: SPRAY SUWA2002-008
06/18/2009
$17.80 $4.18 $21.98
PIPEFITTER PLUM0026-014
06/01/2025
$60.72 $34.15 $94.87
PLUMBER SUWA2002-008
06/18/2009
$35.00 $0.00 $35.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERH...POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10
ENGI0302-023
06/01/2025
$60.67 $27.57 $88.24
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC ...POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS
ENGI0302-023
06/01/2025
$61.56 $27.57 $89.13
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS ENGI0302-023
06/01/2025
$62.47 $27.57 $90.04
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) ENGI0302-023
06/01/2025
$63.35 $27.57 $90.92
POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC ENGI0302-023
06/01/2025
$59.88 $27.57 $87.45
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS ENGI0302-023
06/01/2025
$59.23 $27.57 $86.80
POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS ENGI0302-023
06/01/2025
$55.43 $27.57 $83.00
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) ROOF0054-010
06/01/2023
$44.50 $16.45 $60.95
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION SUWA2002-008
06/18/2009
$24.83 $0.00 $24.83
SHEETMETAL WORKER (HVAC DUCT WORK ONLY) SHEE0066-032
06/01/2025
$66.05 $29.41 $95.46
SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) PAIN1238-002
07/01/2025
$42.01 $20.20 $62.21
SPRINKLER FITTER (FIRE SPRINKLERS) SFWA0699-002
07/01/2025
$68.89 $33.80 $102.69
TILE FINISHER BRWA0001-013
06/01/2025
$40.98 $18.17 $59.15
TILE SETTER BRWA0001-013
06/01/2025
$49.70 $18.62 $68.32
TRUCK DRIVER: DUMP TRUCK SUWA2002-008
06/18/2009
$23.50 $6.87 $30.37

Questions about these rates

What is the Davis-Bacon rate for electricians on building work in Island County?
On WD WA20260028 Mod 1, published May 18, 2026, the row "ELECTRICIAN (ISLAND, SAN JUAN, SKAGIT, SNOHOMISH AND WHATCOM COUNTIES)" is $53.20 base plus $27.51 fringe, $80.71 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on building work in Island County?
On WD WA20260028 Mod 1, published May 18, 2026, the row "PLUMBER" is $35.00 base plus $0.00 fringe, $35.00 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Island County?
On WD WA20260028 Mod 1, published May 18, 2026, the row "CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK)" is $63.98 base plus $19.13 fringe, $83.11 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with WA20260028

Other counties: all Washington counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.