Davis-Bacon wage rates · Washington
King County building construction wage rates
Federal prevailing wage rates for building construction in King County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260108
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 64
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260108, Mod 1
Make a WH-347 with these rates| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0001-015 06/01/2025 | $55.34 | $20.05 | $75.39 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC & DRY HANGER) | CARP0206-001 06/01/2025 | $63.98 | $19.13 | $83.11 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0528-009 06/01/2024 | $54.16 | $21.27 | $75.43 |
| DRYWALL FINISHER/TAPER | PAIN0364-001 07/01/2025 | $53.59 | $23.65 | $77.24 |
| ELECTRICIAN | ELEC0046-003 08/04/2025 | $75.96 | $33.48 | $109.44 |
| FLOOR LAYER: SOFT FLOORS | PAIN1238-001 07/01/2025 | $42.01 | $20.20 | $62.21 |
| GLAZIER | PAIN0188-001 07/01/2025 | $61.14 | $23.76 | $84.90 |
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | ASBE0007-007 06/01/2025 | $75.37 | $18.82 | $94.19 |
| IRONWORKER | IRON0086-006 07/07/2025 | $57.94 | $34.52 | $92.46 |
| LABORER, MASON TENDER BRICK | LABO0252-017 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | LABO0242-011 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | LABO0242-012 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: COMMON OR GENERAL | LABO0242-013 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: CONCRETE SAW CHAIN | LABO0242-014 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: FIRE WATCH | LABO0335-007 06/01/2025 | $40.56 | $15.60 | $56.16 |
| LABORER: FORM STRIPPING | LABO0242-015 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: GRADE CHECKER | LABO0242-017 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: HOD CARRIER | LABO0242-016 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: JACKHAMMER | LABO0242-018 06/01/2025 | $51.52 | $16.99 | $68.51 |
| LABORER: LANDSCAPE | SUWA2018-008 03/01/2024 | $18.41 | $3.20 | $21.61 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | LABO0242-019 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: NOZZLE PERSON | LABO0242-020 06/01/2025 | $52.31 | $17.01 | $69.32 |
| LABORER: PIPELAYER | UAVGWA0005 03/01/2024 | $45.61 | $14.40 | $60.01 |
| MARBLE FINISHER | BRWA0001-022 06/01/2025 | $40.98 | $18.17 | $59.15 |
| MARBLE SETTER | BRWA0001-022 06/01/2025 | $49.70 | $18.62 | $68.32 |
| MASON - STONE | BRWA0001-022 06/01/2025 | $55.34 | $20.05 | $75.39 |
| MILLWRIGHT | CARP0096-001 06/01/2025 | $55.39 | $22.38 | $77.77 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | ENGI0302-055 06/01/2025 | $61.14 | $27.57 | $88.71 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | ENGI0302-055 06/01/2025 | $61.93 | $27.57 | $89.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | ENGI0302-055 06/01/2025 | $60.46 | $27.57 | $88.03 |
| OPERATOR: BLADE FINISH | ENGI0302-096 06/01/2025 | $61.14 | $27.57 | $88.71 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2018-008 03/01/2024 | $40.53 | $9.56 | $50.09 |
| OPERATOR: BULLDOZER (D9 & UNDER) | ENGI0302-096 06/01/2025 | $60.46 | $27.57 | $88.03 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | ENGI0302-055 06/01/2025 | $61.93 | $27.57 | $89.50 |
| OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | ENGI0302-055 06/01/2025 | $62.85 | $27.75 | $90.60 |
| OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | ENGI0302-055 06/01/2025 | $61.14 | $27.75 | $88.89 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | ENGI0302-055 06/01/2025 | $61.93 | $27.75 | $89.68 |
| OPERATOR: DRILL | UAVGWA0002 03/01/2024 | $56.42 | $21.15 | $77.57 |
| OPERATOR: GRADER/BLADE | ENGI0302-096 06/01/2025 | $61.93 | $27.57 | $89.50 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | ENGI0302-055 06/01/2025 | $61.14 | $27.57 | $88.71 |
| OPERATOR: MECHANIC | SUWA2018-008 03/01/2024 | $42.85 | $19.20 | $62.05 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | ENGI0302-055 06/01/2025 | $61.14 | $27.57 | $88.71 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | ENGI0302-055 06/01/2025 | $60.46 | $27.57 | $88.03 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | ENGI0302-096 06/01/2025 | $61.93 | $27.57 | $89.50 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | ENGI0302-055 06/01/2025 | $56.63 | $27.57 | $84.20 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | ENGI0302-055 06/01/2025 | $60.46 | $27.57 | $88.03 |
| OPERATOR: SCREED | ENGI0302-055 06/01/2025 | $61.14 | $25.57 | $86.71 |
| PAINTER | PAIN0300-003 07/01/2025 | $41.24 | $14.70 | $55.94 |
| PIPEFITTER | PLUM0032-003 06/01/2025 | $75.21 | $33.88 | $109.09 |
| PLASTERER | PLAS0528-010 06/01/2024 | $52.50 | $20.67 | $73.17 |
| PLUMBER | PLUM0032-005 06/01/2025 | $75.21 | $33.88 | $109.09 |
| ROOFER | ROOF0153-006 02/01/2024 | $48.01 | $16.44 | $64.45 |
| SCAFFOLD BUILDER | LABO0242-021 06/01/2025 | $50.38 | $16.96 | $67.34 |
| SHEET METAL WORKER | SHEE0066-014 06/01/2025 | $69.86 | $33.39 | $103.25 |
| SPRINKLER FITTER | SFWA0699-004 07/01/2025 | $68.89 | $33.80 | $102.69 |
| TERRAZZO FINISHER | BRWA0001-022 06/01/2025 | $40.98 | $18.17 | $59.15 |
| TERRAZZO WORKER/SETTER | BRWA0001-022 06/01/2025 | $51.70 | $18.62 | $70.32 |
| TILE FINISHER | BRWA0001-013 06/01/2025 | $40.98 | $18.17 | $59.15 |
| TILE SETTER | BRWA0001-013 06/01/2025 | $49.70 | $18.62 | $68.32 |
| TRAFFIC CONTROL: FLAGGER | LABO0242-022 06/01/2025 | $40.88 | $16.72 | $57.60 |
| TRUCK DRIVER: CONCRETE TRUCK | TEAM0174-009 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK (16 TO 30 YARD CAPACITY) | TEAM0174-010 06/01/2025 | $55.43 | $27.52 | $82.95 |
| TRUCK DRIVER: DUMP TRUCK (LESS THAN 16 YARD CAPACITY) | TEAM0174-010 06/01/2025 | $54.59 | $27.52 | $82.11 |
| TRUCK DRIVER: PICKUP TRUCK | TEAM0174-011 06/01/2025 | $51.78 | $27.52 | $79.30 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in King County?
What is the Davis-Bacon rate for plumbers on building work in King County?
What is the Davis-Bacon rate for carpenters on building work in King County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260108
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.