Davis-Bacon wage rates · Washington

Kitsap County building construction wage rates

Federal prevailing wage rates for building construction in Kitsap County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.

Data from SAM.gov, fetched October 7, 20261 wage determination
Wage determination
WA20260109
Modification
1
Published
May 18, 2026
Classifications
50
Other types here
Residential, Heavy, Highway

These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.

WD WA20260109, Mod 1

Make a WH-347 with these rates
Published May 18, 2026 50 classifications Covers 1 county Types: Building Source: SAM.gov
Davis-Bacon rates in WA20260109 Mod 1, published 05/18/2026. Total is base plus the hourly fringe printed in the WD; footnote benefits (paid holidays, vacation) are extra and listed below the table.
ClassificationRate IDBaseFringeTotal / hour
BRICKLAYER BRWA0001-015
06/01/2025
$55.34 $20.05 $75.39
CARPENTER (INCLUDES DRYWALL HANGER) CARP0206-007
06/01/2025
$63.98 $19.13 $83.11
CEMENT MASON/CONCRETE FINISHER PLAS0528-009
06/01/2024
$54.16 $21.27 $75.43
DRYWALL FINISHER/TAPER PAIN0364-001
07/01/2025
$53.59 $23.65 $77.24
ELECTRICIAN ELEC0046-003
08/04/2025
$75.96 $33.48 $109.44
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) ASBE0007-007
06/01/2025
$75.37 $18.82 $94.19
IRONWORKER IRON0086-006
07/07/2025
$57.94 $34.52 $92.46
LABORER, MASON TENDER BRICK LABO0252-017
06/01/2025
$50.38 $16.96 $67.34
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) SUWA2018-009
03/01/2024
$35.54 $10.89 $46.43
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR SUWA2018-009
03/01/2024
$42.25 $0.00 $42.25
LABORER: COMMON OR GENERAL SUWA2018-009
03/01/2024
$36.24 $10.89 $47.13
LABORER: CONCRETE SAW CHAIN LABO0252-015
06/01/2025
$51.52 $16.99 $68.51
LABORER: FIRE WATCH LABO0335-007
06/01/2025
$40.56 $15.60 $56.16
LABORER: FORM STRIPPING LABO0242-015
06/01/2025
$50.38 $16.96 $67.34
LABORER: GRADE CHECKER LABO0242-017
06/01/2025
$52.31 $17.01 $69.32
LABORER: JACKHAMMER LABO0242-018
06/01/2025
$51.52 $16.99 $68.51
LABORER: MASON TENDER - CEMENT/CONCRETE LABO0242-019
06/01/2025
$50.38 $16.96 $67.34
LABORER: NOZZLE PERSON LABO0242-020
06/01/2025
$52.31 $17.01 $69.32
LABORER: PIPELAYER SUWA2018-009
03/01/2024
$35.83 $10.89 $46.72
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) ENGI0302-101
06/01/2025
$60.14 $27.57 $87.71
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) ENGI0302-101
06/01/2025
$60.93 $27.57 $88.50
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) ENGI0302-101
06/01/2025
$59.49 $27.57 $87.06
OPERATOR: BLADE FINISH ENGI0302-098
06/01/2025
$60.14 $27.57 $87.71
OPERATOR: BOBCAT/SKID STEER/SKID LOADER SUWA2018-009
03/01/2024
$40.53 $9.56 $50.09
OPERATOR: BULLDOZER (D9 & UNDER) ENGI0302-098
06/01/2025
$59.49 $27.57 $87.06
OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) ENGI0302-101
06/01/2025
$60.93 $27.57 $88.50
OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) ENGI0302-101
06/01/2025
$61.83 $27.57 $89.40
OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) ENGI0302-101
06/01/2025
$60.14 $27.57 $87.71
OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) ENGI0302-101
06/01/2025
$60.93 $27.57 $88.50
OPERATOR: DRILL UAVGWA0002
03/01/2024
$56.42 $21.15 $77.57
OPERATOR: GRADER/BLADE ENGI0302-098
06/01/2025
$60.93 $27.57 $88.50
OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) ENGI0302-101
06/01/2025
$60.93 $27.57 $88.50
OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) ENGI0302-101
06/01/2025
$60.14 $27.57 $87.71
OPERATOR: MECHANIC SUWA2018-009
03/01/2024
$45.17 $19.20 $64.37
OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) ENGI0302-101
06/01/2025
$60.14 $27.57 $87.71
OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) ENGI0302-101
06/01/2025
$59.49 $27.57 $87.06
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) ENGI0302-098
06/01/2025
$60.93 $27.57 $88.50
OPERATOR: ROLLER (OTHER THAN PLANT MIX) ENGI0302-101
06/01/2025
$55.68 $27.57 $83.25
OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) ENGI0302-101
06/01/2025
$59.49 $27.57 $87.06
PAINTER PAIN0300-003
07/01/2025
$41.24 $14.70 $55.94
PIPEFITTER PLUM0026-015
06/01/2025
$60.72 $34.15 $94.87
PLASTERER PLAS0528-010
06/01/2024
$52.50 $20.67 $73.17
PLUMBER PLUM0026-018
06/01/2025
$60.72 $34.15 $94.87
ROOFER ROOF0153-006
02/01/2024
$48.01 $16.44 $64.45
SHEET METAL WORKER SHEE0066-014
06/01/2025
$69.86 $33.39 $103.25
SPRINKLER FITTER SFWA0699-004
07/01/2025
$68.89 $33.80 $102.69
TILE FINISHER BRWA0001-013
06/01/2025
$40.98 $18.17 $59.15
TILE SETTER BRWA0001-013
06/01/2025
$49.70 $18.62 $68.32
TRUCK DRIVER: CONCRETE TRUCK TEAM0174-009
06/01/2025
$55.43 $27.52 $82.95
TRUCK DRIVER: DUMP TRUCK SUWA2018-009
03/01/2024
$45.47 $7.05 $52.52

Questions about these rates

What is the Davis-Bacon rate for electricians on building work in Kitsap County?
On WD WA20260109 Mod 1, published May 18, 2026, the row "ELECTRICIAN" is $75.96 base plus $33.48 fringe, $109.44 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for plumbers on building work in Kitsap County?
On WD WA20260109 Mod 1, published May 18, 2026, the row "PLUMBER" is $60.72 base plus $34.15 fringe, $94.87 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
What is the Davis-Bacon rate for carpenters on building work in Kitsap County?
On WD WA20260109 Mod 1, published May 18, 2026, the row "CARPENTER (INCLUDES DRYWALL HANGER)" is $63.98 base plus $19.13 fringe, $83.11 an hour in total. Your contract's WD and modification govern, so check the WD number in your contract before you pay.
Which wage determination applies to my project?
The one in your contract. A WD is generally locked in when the contract is awarded (for sealed bids, a modification published at least 10 days before bid opening applies), and later modifications do not change it except in cases such as added out-of-scope work or option extensions. See 29 CFR 1.6(c).
What counts as building construction?
Sheltered enclosures with walk-in access for housing people, machinery, equipment or supplies, and all their installations. Includes apartment buildings of 5 stories and up. The contracting agency picks the construction type; it is written into your contract with the WD. Source: DOL All Agency Memorandum 130.
What if my worker's trade is not on the list?
Work that needs a classification the WD does not list is added after award through a conformance request, which goes through the contracting agency to the Department of Labor (29 CFR 5.5(a)(1)(iii)). Do not use a different classification because its rate looks close.

Using these rates on a WH-347

Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.

Make this week's WH-347 with WA20260109

Other counties: all Washington counties · WD lookup

Your first certified payroll is free.

Upload last week's payroll, get a checked WH-347 back today.

No card. Same full report, no watermark.