Davis-Bacon wage rates · Washington
Lewis County building construction wage rates
Federal prevailing wage rates for building construction in Lewis County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260032
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 26
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260032, Mod 1
Make a WH-347 with these ratesSome rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) | ASBE0007-005 06/01/2025 | $75.37 | $18.82 | $94.19 |
| BRICKLAYER | BRWA0001-015 06/01/2025 | $55.34 | $20.05 | $75.39 |
| CARPENTER (INCLUDING FORMWORK AND DRYWALL HANGING) | CARP0360-011 06/01/2025 | $63.98 | $19.13 | $83.11 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0528-004 06/01/2024 | $54.16 | $21.27 | $75.43 |
| ELECTRICIAN | ELEC0076-005 08/31/2025 | $65.14 | $26.56 | $91.70 |
| IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL) | IRON0086-003 07/07/2025 | $57.94 | $34.52 | $92.46 |
LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, ...LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-008 06/01/2025 | $50.38 | $16.96 | $67.34 |
LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABER...LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-008 06/01/2025 | $51.52 | $16.99 | $68.51 |
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVE...LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-008 06/01/2025 | $52.31 | $17.01 | $69.32 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2002-012 06/18/2009 | $27.94 | $0.00 | $27.94 |
| PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY) | PAIN0300-006 07/01/2025 | $41.24 | $14.70 | $55.94 |
| PAINTER: SPRAY | SUWA2002-012 06/18/2009 | $17.80 | $4.18 | $21.98 |
| PIPEFITTER | PLUM0026-010 06/01/2025 | $60.72 | $34.15 | $94.87 |
| PLUMBER | SUWA2002-012 06/18/2009 | $35.00 | $0.00 | $35.00 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 50 METRIC TONS; DOZER-...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 50 METRIC TONS; DOZER-D-10; LOADERS- 6 YARDS TO, BUT NOT INCLUDING, 8 YARDS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $60.32 | $27.32 | $87.64 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS; LOADE...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS; LOADERS-8 YARDS AND OVER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $61.22 | $27.32 | $88.54 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 90 METRIC TONS ZONE DIFFERENTIAL (ADD TO ZONE ...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 90 METRIC TONS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $62.12 | $27.32 | $89.44 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE ...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $62.99 | $27.32 | $90.31 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; MECHANIC; LOADER- UNDER 6 YARDS ZONE DIFFERENTIAL (ADD TO ZO...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; MECHANIC; LOADER- UNDER 6 YARDS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $59.56 | $27.32 | $86.88 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OUTSI...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OUTSIDE HOIST (ELEVATORS AND MANLIFTS); DOZER-D-9 AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $58.89 | $27.32 | $86.21 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OV...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-018 06/01/2025 | $55.13 | $27.32 | $82.45 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | ROOF0153-001 06/01/2024 | $47.98 | $16.47 | $64.45 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) | SHEE0066-017 06/01/2025 | $69.86 | $33.39 | $103.25 |
| SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) | PAIN1238-002 07/01/2025 | $42.01 | $20.20 | $62.21 |
| TILE SETTER | BRWA0001-007 06/01/2025 | $49.70 | $18.62 | $68.32 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | SUWA2002-012 06/18/2009 | $23.50 | $6.87 | $30.37 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Lewis County?
What is the Davis-Bacon rate for plumbers on building work in Lewis County?
What is the Davis-Bacon rate for carpenters on building work in Lewis County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260032
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.