Davis-Bacon wage rates · Washington
Okanogan County building construction wage rates
Federal prevailing wage rates for building construction in Okanogan County, Washington, from the wage determination SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260035
- Modification
- 2
- Published
- May 18, 2026
- Classifications
- 39
- Other types here
- Residential, Heavy, Highway
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
WD WA20260035, Mod 2
Make a WH-347 with these ratesSome rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| BRICKLAYER | BRWA0003-002 06/01/2021 | $33.95 | $19.33 | $53.28 |
| CARPENTER (DRYWALL HANGING AND FORM WORK ONLY) | CARP0059-023 06/01/2025 | $44.21 | $17.28 | $61.49 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | SUWA2002-015 06/18/2009 | $23.81 | $2.91 | $26.72 |
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 4...CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | PLAS0072-008 06/01/2025 | $40.89 | $18.64 | $59.53 |
| ELECTRICIAN | ELEC0191-015 06/01/2020 | $46.15 | $26.10 | $72.25 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | IRON0014-012 07/07/2025 | $43.40 | $32.77 | $76.17 |
| LABORER, MASON TENDER BRICK | LABO0238-007 06/01/2025 | $38.05 | $16.75 | $54.80 |
| LABORER: A-2: GROUP 10 GRADE CHECKER | LABO0238-025 06/01/2025 | $43.21 | $16.90 | $60.11 |
| LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER | LABO0238-025 06/01/2025 | $40.13 | $16.90 | $57.03 |
| LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER | LABO0238-025 06/01/2025 | $40.46 | $16.90 | $57.36 |
| METAL BUILDING ERECTOR | SUWA2002-015 06/18/2009 | $11.30 | $3.58 | $14.88 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | SUWA2002-015 06/18/2009 | $27.94 | $0.00 | $27.94 |
| PAINTER (BRUSH & SPRAY ONLY) | PAIN0427-004 07/01/2025 | $33.95 | $15.65 | $49.60 |
| PAINTER: DRYWALL FINISHING/TAPING | SUWA2002-015 06/18/2009 | $25.17 | $4.41 | $29.58 |
| PAINTER: ROLLER | SUWA2002-015 06/18/2009 | $22.06 | $2.72 | $24.78 |
| PIPE INSULATOR/WRAPPER | SUWA2002-015 06/18/2009 | $24.21 | $4.07 | $28.28 |
| PIPEFITTER (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | PLUM0598-020 06/01/2025 | $65.20 | $34.91 | $100.11 |
| PIPEFITTER (OKANOGAN COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | PLUM0032-004 06/01/2025 | $75.21 | $33.88 | $109.09 |
| PLUMBER | SUWA2002-015 06/18/2009 | $35.00 | $0.00 | $35.00 |
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERH...POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $60.67 | $27.57 | $88.24 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $41.17 | $23.40 | $64.57 |
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC ...POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $61.56 | $27.57 | $89.13 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $62.47 | $27.57 | $90.04 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $63.35 | $27.57 | $90.92 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $59.88 | $27.57 | $87.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $41.56 | $23.40 | $64.96 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $42.31 | $23.40 | $65.71 |
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTA...POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $59.23 | $27.57 | $86.80 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $42.51 | $23.40 | $65.91 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | ENGI0302-022 06/01/2025 | $55.43 | $27.57 | $83.00 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $42.71 | $23.40 | $66.11 |
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T...POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $43.05 | $23.40 | $66.45 |
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) ...POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $43.39 | $23.40 | $66.79 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN) | ENGI0302-135 06/01/2025 | $45.36 | $23.40 | $68.76 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | ROOF0189-001 07/01/2025 | $35.75 | $14.40 | $50.15 |
| SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | SHEE0055-012 06/01/2025 | $45.83 | $27.92 | $73.75 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | SFWA0699-005 04/01/2025 | $44.30 | $28.58 | $72.88 |
| TILE SETTER | BRWA0003-009 06/01/2021 | $29.86 | $13.95 | $43.81 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | SUWA2002-015 06/18/2009 | $23.50 | $6.87 | $30.37 |
Questions about these rates
What is the Davis-Bacon rate for electricians on building work in Okanogan County?
What is the Davis-Bacon rate for plumbers on building work in Okanogan County?
What is the Davis-Bacon rate for carpenters on building work in Okanogan County?
Which wage determination applies to my project?
What counts as building construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260035
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.