Davis-Bacon wage rates · Washington
Pacific County heavy construction wage rates
Federal prevailing wage rates for heavy construction in Pacific County, Washington, from the wage determinations SAM.gov lists for this county. Rates are shown exactly as published.
- Wage determination
- WA20260055
- Modification
- 1
- Published
- May 18, 2026
- Classifications
- 42
- Other types here
- Building, Residential, Highway
2 wage determinations cover heavy work in Pacific County. They differ by scope (for example landscaping, dredging or part of the county). Use the WD number written in your contract; the scope text under each one says what it covers.
These are federal Davis-Bacon rates for federally funded or assisted work. State and local public works can have their own prevailing wage rates under state law. See Washington prevailing wage for how the two fit together.
1 of 2: WD WA20260055, Mod 1
Make a WH-347 with these ratesSome rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
CARPENTER: INCLUDING FORMWORK (PACIFIC COUNTY PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN COUNTIES OR PAR...CARPENTER: INCLUDING FORMWORK (PACIFIC COUNTY PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN COUNTIES OR PARTS OF COUNTIES EAST OF THE 120TH MERIDIAN.) | CARP0360-014 06/01/2025 | $63.98 | $19.13 | $83.11 |
CARPENTER: INCLUDING FORMWORK (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO WILLAPA BAY TO THE PACIFIC OCEAN,...CARPENTER: INCLUDING FORMWORK (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO WILLAPA BAY TO THE PACIFIC OCEAN, AND THENCE NORTH THROUGH THE NATURAL WATERWAY TO THE PACIFIC OCEAN (THIS INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY)) | CARP0360-008 06/01/2025 | $54.69 | $16.81 | $71.50 |
| CEMENT MASON/CONCRETE FINISHER | PLAS0528-004 06/01/2024 | $54.16 | $21.27 | $75.43 |
| ELECTRICIAN | ELEC0076-005 08/31/2025 | $65.14 | $26.56 | $91.70 |
| FENCE ERECTOR | SUWA2009-046 08/07/2009 | $15.00 | $0.00 | $15.00 |
| IRONWORKER (REINFORCING & STRUCTURAL) | IRON0086-012 07/07/2025 | $57.94 | $34.52 | $92.46 |
| LABORER: COMMON OR GENERAL | SUWA2009-046 08/07/2009 | $22.93 | $5.60 | $28.53 |
LABORER: GROUP 2 FLAGGER (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):...LABORER: GROUP 2 FLAGGER (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-004 06/01/2025 | $40.88 | $16.72 | $57.60 |
| LABORER: GROUP 2 FLAGGER (PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY) | LABO0335-024 06/01/2025 | $40.56 | $15.60 | $56.16 |
| LABORER: GROUP 3 BRICK MASON TENDER/HOD CARRIER (PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY) | LABO0335-024 06/01/2025 | $44.06 | $15.60 | $59.66 |
LABORER: GROUP 3 CHIPPING GUNS (UNDER 30 LBS) (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIFFERENTIAL (...LABORER: GROUP 3 CHIPPING GUNS (UNDER 30 LBS) (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-004 06/01/2025 | $50.38 | $16.96 | $67.34 |
| LABORER: GROUP 4 CHIPPING GUNS; MASON TENDER-CEMENT/CONCRETE (PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY) | LABO0335-024 06/01/2025 | $44.90 | $15.60 | $60.50 |
LABORER: GROUP 4 PIPE LAYER; CHIPPING GUNS (OVER 30 LBS) (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIF...LABORER: GROUP 4 PIPE LAYER; CHIPPING GUNS (OVER 30 LBS) (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-004 06/01/2025 | $51.52 | $16.99 | $68.51 |
LABORER: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) ...LABORER: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER (PACIFIC (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY, ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | LABO0252-004 06/01/2025 | $52.31 | $17.05 | $69.36 |
| LABORER: GROUP 6 GRADE CHECKER; PIPELAYER (PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) COUNTY) | LABO0335-024 06/01/2025 | $46.08 | $15.60 | $61.68 |
| LABORER: LANDSCAPE | SUWA2009-046 08/07/2009 | $14.67 | $0.00 | $14.67 |
| MILLWRIGHT (PACIFIC COUNTY (NORTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN)) | CARP0096-003 06/01/2025 | $55.39 | $22.38 | $77.77 |
| MILLWRIGHT (PACIFIC COUNTY (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN)) | CARP0096-008 06/01/2025 | $59.35 | $22.38 | $81.73 |
| OPERATOR: BULLDOZER | SUWA2009-046 08/07/2009 | $27.22 | $7.63 | $34.85 |
| OPERATOR: LOADER | SUWA2009-046 08/07/2009 | $26.11 | $7.87 | $33.98 |
| OPERATOR: MECHANIC | SUWA2009-046 08/07/2009 | $25.53 | $7.70 | $33.23 |
| OPERATOR: ROLLER | SUWA2009-046 08/07/2009 | $25.25 | $8.20 | $33.45 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | PAIN0010-016 07/01/2025 | $39.94 | $16.68 | $56.62 |
| PIPEFITTER | SUWA2009-046 08/07/2009 | $33.77 | $8.82 | $42.59 |
POWER EQUIPMENT OPERATOR GROUP 3 BULLDOZER, OVER SEVENTY THOUSAND (70,000) LBS. UP TO AND INCLUDING ONE HUNDRED TWENTY THOUSAND (120,000) LBS.; CRANE, BOOM TRUCK FIFTY (50) TON AND OVER WITH LESS THAN...POWER EQUIPMENT OPERATOR GROUP 3 BULLDOZER, OVER SEVENTY THOUSAND (70,000) LBS. UP TO AND INCLUDING ONE HUNDRED TWENTY THOUSAND (120,000) LBS.; CRANE, BOOM TRUCK FIFTY (50) TON AND OVER WITH LESS THAN ONE HUNDRED FIFTY FOOT (150') BOOM; CRANE, FIFTY (50) TON THROUGH EIGHTY NINE (89) TON WITH ONE HUNDRED FIFTY FOOT (150') BOOM OR LESS (INCLUDING JIB INSERTS AND/OR ATTACHMENTS); CRANE, SHOVEL, DRAGLINE OR CLAMSHELL THREE (3) CU. YDS. BUT LESS THAN FIVE (5) CU. YDS.; EXCAVATOR OVER EIGHTY THOUSAND (80,000) LBS. THROUGH ONE HUNDRED THIRTY THOUSAND (130,000) LBS.; LOADER SIXTY THOUSAND (60,000) LBS. AND LESS THAN ONE HUNDRED TWENTY THOUSAND (120,000) LBS. PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $55.88 | $17.15 | $73.03 |
POWER EQUIPMENT OPERATOR: GROUP 1 CONCRETE BATCH PLAN AND OR WET MIX THREE (3) UNITS OR MORE; CRANE, FLOATING ONE HUNDRED AND FIFTY (150) TON BUT LESS THAN TWO HUNDRED AND FIFTY (250) TON; CRANE, TWO ...POWER EQUIPMENT OPERATOR: GROUP 1 CONCRETE BATCH PLAN AND OR WET MIX THREE (3) UNITS OR MORE; CRANE, FLOATING ONE HUNDRED AND FIFTY (150) TON BUT LESS THAN TWO HUNDRED AND FIFTY (250) TON; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON WITH TWO HUNDRED FOOT (200') BOOM OR LESS (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, NINETY (90) TON THROUGH ONE HUNDRED NINETY NINE (199) TON WITH OVER TWO HUNDRED (200') BOOM INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, TOWER CRANE WITH ONE HUNDRED SEVENTY FIVE FOOT (175') TOWER OR LESS AND WITH LESS THAN TWO HUNDRED FOOT (200') JIB; CRANE, WHIRLEY NINETY (90) TON AND OVER; HELICOPTER WHEN USED IN ERECTING WORK PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $58.94 | $17.15 | $76.09 |
POWER EQUIPMENT OPERATOR: GROUP 1A CRANE, FLOATING TWO HUNDRED FIFTY (250) TON AND OVER; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM ...POWER EQUIPMENT OPERATOR: GROUP 1A CRANE, FLOATING TWO HUNDRED FIFTY (250) TON AND OVER; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON; CRANE, TOWER CRANE WITH OVER ONE HUNDRED SEVENTY FIVE FOOT (175') TOWER OR OVER TWO HUNDRED FOOT (200') JIB; CRANE, TOWER CRANE ON RAIL SYSTEM OR 2ND TOWER OR MORE IN WORK RADIUS PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $61.10 | $17.15 | $78.25 |
POWER EQUIPMENT OPERATOR: GROUP 1B CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); FLOAT...POWER EQUIPMENT OPERATOR: GROUP 1B CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); FLOATING CRANE, THREE HUNDRED FIFTY (350) TON AND OVER; CRANE, FOUR HUNDRED (400) TON AND OVER PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $63.26 | $17.15 | $80.41 |
POWER EQUIPMENT OPERATOR: GROUP 2 ASPHALT PLANT (ANY TYPE); ASPHALT ROTO-MILL, PAVEMENT PROFILER EIGHT FOOT (8') LATERAL CUT AND OVER; AUTO GRADER OR "TRIMMER"; BLADE, ROBOTIC; BULLDOZER, ROBOTIC EQUI...POWER EQUIPMENT OPERATOR: GROUP 2 ASPHALT PLANT (ANY TYPE); ASPHALT ROTO-MILL, PAVEMENT PROFILER EIGHT FOOT (8') LATERAL CUT AND OVER; AUTO GRADER OR "TRIMMER"; BLADE, ROBOTIC; BULLDOZER, ROBOTIC EQUIPMENT (ANY TYPE); BULLDOZER, OVER ONE HUNDRED TWENTY THOUSAND (120,000) LBS. AND ABOVE; CONCRETE BATCH PLANT AND/OR WET MIX ONE (1) AND TWO (2) DRUM; CONCRETE DIAMOND HEAD PROFILER; CANAL TRIMMER; CONCRETE, AUTOMATIC SLIP FORM PAVER (ASSISTANT TO THE OPERATOR REQUIRED); CRANE, BOOM TRUCK FIFTY (50) TON AND WITH OVER ONE HUNDRED FIFTY FOOT (150') BOOM AND OVER; CRANE, FLOATING (DERRICK BARGE) THIRTY (30) TON BUT LESS THAN ONE HUNDRED FIFTY (150) TON; CRANE, CABLEWAY TWENTY-FIVE (25) TON AND OVER; CRANE, FLOATING CLAMSHELL THREE (3) CU. YDS. AND OVER; CRANE, NINETY (90) TON THROUGH ONE HUNDRED NINETY NINE (199) TON UP TO AND INCLUDING TWO HUNDRED FOOT (200') OF BOOM (INCLUDING JIB INSERTS AND/OR ATTACHMENTS); CRANE, FIFTY (50) TON THROUGH EIGHTY NINE (89) TON WITH OVER ONE HUNDRED FIFTY FOOT (150') BOOM (INCLUDING JIB INSERTS AND/OR ATTACHMENTS); CRANE, WHIRLEY UNDER NINETY (90) TON; CRUSHER PLANT; EXCAVATOR OVER ONE HUNDRED THIRTY THOUSAND (130,000) LBS.; LOADER ONE HUNDRED TWENTY THOUSAND (120,000) LBS. AND ABOVE; REMOTE CONTROLLED EARTH MOVING EQUIPMENT; SHOVEL, DRAGLINE, CLAMSHELL, FIVE (5) CU. YDS. AND OVER; UNDERWATER EQUIPMENT REMOTE OR OTHERWISE, WHEN USED IN CONSTRUCTION WORK; WHEEL EXCAVATOR ANY SIZE PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $57.03 | $17.15 | $74.18 |
POWER EQUIPMENT OPERATOR: GROUP 4 ASPHALT, SCREED; ASPHALT PAVER; ASPHALT ROTO-MILL, PAVEMENT PROFILER, UNDER EIGHT FOOT (8') LATERAL CUT; ASPHALT, MATERIAL TRANSFER VEHICLE OPERATOR; BACK FILLING MAC...POWER EQUIPMENT OPERATOR: GROUP 4 ASPHALT, SCREED; ASPHALT PAVER; ASPHALT ROTO-MILL, PAVEMENT PROFILER, UNDER EIGHT FOOT (8') LATERAL CUT; ASPHALT, MATERIAL TRANSFER VEHICLE OPERATOR; BACK FILLING MACHINE; BACKHOE, ROBOTIC, TRACK AND WHEEL TYPE UP TO AND INCLUDING TWENTY THOUSAND (20,000) LBS. WITH ANY ATTACHMENTS; BLADE (ANY TYPE); BOATMAN; BORING MACHINE; BULLDOZER OVER TWENTY THOUSAND (20,000) LBS. AND MORE THAN ONE HUNDRED (100) HORSE UP TO SEVENTY THOUSAND (70,000) LBS.; CABLE-PLOW (ANY TYPE); CABLEWAY UP TO TWENTY FIVE (25) TON; CAT DRILL (JOHN HENRY); CHIPPERS; COMPACTOR, MULTI-ENGINE; COMPACTOR, ROBOTIC; COMPACTOR WITH BLADE SELF-PROPELLED; CONCRETE, BREAKER; CONCRETE, GROUT PLANT; CONCRETE, MIXER MOBILE; CONCRETE, PAVING ROAD MIXER; CONCRETE, REINFORCED TANK BANDING MACHINE; CRANE, BOOM TRUCK TWENTY (20) TON AND UNDER FIFTY (50) TON; CRANE, BRIDGE LOCOMOTIVE, GANTRY AND OVERHEAD; CRANE, CARRY DECK; CRANE, CHICAGO BOOM AND SIMILAR TYPES; CRANE, DERRICK OPERATOR, UNDER ONE HUNDRED (100) TON; CRANE, FLOATING CLAMSHELL, DRAGLINE, ETC. OPERATOR, UNDER THREE (3) CU. YDS. OR LESS THAN THIRTY (30) TON; CRANE, UNDER FIFTY (50) TON; CRANE, QUICK TOWER UNDER ONE HUNDRED FOOT (100') IN HEIGHT AND LESS THAN ONE HUNDRED FIFTY FOOT (150') JIB (ON RAIL INCLUDED); DIESEL-ELECTRIC ENGINEER (PLANT OR FLOATING); DIRECTIONAL DRILL OVER TWENTY THOUSAND (20,000) LBS. PULLBACK; DRILL CAT OPERATOR; DRILL DOCTOR AND/OR BIT GRINDER; DRILLER, PERCUSSION, DIAMOND, CORE, CABLE, ROTARY AND SIMILAR TYPE; EXCAVATOR OPERATOR OVER TWENTY THOUSAND (20,000) LBS. THROUGH EIGHTY THOUSAND (80,000) LBS.; GENERATOR OPERATOR; GRADE-ALL; GUARDRAIL MACHINES, I.E. PUNCH, AUGER, ETC.; HAMMER OPERATOR (PILEDRIVER); HOIST, STIFF LEG, GUY DERRICK OR SIMILAR TYPE, FIFTY (50) TON AND OVER; HOIST, TWO (2) DRUMS OR MORE; HYDRO AXE (LOADER MOUNTED OR SIMILAR TYPE); JACK OPERATOR, ELEVATING BARGES, BARGE OPERATOR, SELF-UNLOADING; LOADER OPERATOR, FRONT END AND OVERHEAD, TWENTY FIVE THOUSAND (25,000) LBS. AND LESS THAN SIXTY THOUSAND (60,000) LBS.; LOG SKIDDERS; PILEDRIVER OPERATOR (NOT CRANE TYPE); PIPE, BENDING, CLEANING, DOPING AND WRAPPING MACHINES; RAIL, BALLAST TAMPER MULTI-PURPOSE; RUBBER-TIRED DOZERS AND PUSHERS; SCRAPER, ALL TYPES; SIDE-BOOM; SKIP LOADER, DRAG BOX; STRUMP GRINDER (LOADER MOUNTED OR SIMILAR TYPE); SURFACE HEATER AND PLANER; TRACTOR, RUBBER-TIRED, OVER FIFTY (50) HP FLYWHEEL; TRENCHING MACHINE THREE FOOT (3') DEPTH AND DEEPER; TUB GRINDER (USED FOR WOOD DEBRIS); TUNNEL BORING MACHINE MECHANIC; TUNNEL, MUCKING MACHINE; ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR; WATER PULLS, WATER WAGONS PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $52.55 | $17.15 | $69.70 |
POWER EQUIPMENT OPERATOR: GROUP 5 ASPHALT, EXTRUSION MACHINE; ASPHALT, ROLLER (ANY ASPHALT MIX); ASPHALT, ROTO-MILL PAVEMENT PROFILER GROUND MAN; BULLDOZER, TWENTY THOUSAND (20,000) LBS. OR LESS, OR O...POWER EQUIPMENT OPERATOR: GROUP 5 ASPHALT, EXTRUSION MACHINE; ASPHALT, ROLLER (ANY ASPHALT MIX); ASPHALT, ROTO-MILL PAVEMENT PROFILER GROUND MAN; BULLDOZER, TWENTY THOUSAND (20,000) LBS. OR LESS, OR ONE HUNDRED (100) HORSE OR LESS; CEMENT PUMP; CHIP SPREADING MACHINE; CHURN DRILL AND EARTH BORING MACHINE; COMPACTOR, SELF-PROPELLED WITHOUT BLADE; COMPRESSOR, (ANY POWER) ONE THOUSAND TWO HUNDRED FIFTY (1,250) CU. FT. AND OVER, TOTAL CAPACITY; CONCRETE, BATCH PLANT QUALITY CONTROL; CONCRETE, COMBINATION MIXER AND COMPRESSOR OPERATOR, GUNITE WORK; CONCRETE, CURB MACHINE, MECHANICAL BERM, CURB AND/OR CURB AND GUTTER; CONCRETE, FINISHING MACHINE; CONCRETE, GROUTING MACHINE; CONCRETE, INTERNAL FULL SLAB VIBRATOR OPERATOR; CONCRETE, JOINT MACHINE; CONCRETE, MIXER SINGLE DRUM, ANY CAPACITY; CONCRETE, PAVING MACHINE EIGHT FOOT (8') OR LESS; CONCRETE, PLANER; CONCRETE, PUMP; CONCRETE, PUMP TRUCK; CONCRETE, PUMPCRETE OPERATOR (ANY TYPE); CONCRETE, SLIP FORM PUMPS, POWER DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS; CONVEYORED MATERIAL HAULER; CRANE, BOOM TRUCK UNDER TWENTY (20) TONS; CRANE, BOOM TYPE LIFTING DEVICE, FIVE (5) TON CAPACITY OR LESS; DRILL, DIRECTIONAL TYPE LESS THAN TWENTY THOUSAND (20,000) LBS. PULLBACK; FORK LIFT, OVER TEN (10) TON OR ROBOTIC; HELICOPTER HOIST; HOIST OPERATOR, SINGLE DRUM; HYDRAULIC BACKHOE TRACK TYPE UP TO AND INCLUDING TWENTY THOUSAND (20,000) LBS.; HYDRAULIC BACKHOE WHEEL TYPE (ANY MAKE); LASER SCREED; LOADERS, RUBBER-TIRED TYPE, LESS THAN TWENTY FIVE THOUSAND (25,000) LBS.; PAVEMENT GRINDER AND/OR GROOVING MACHINE (RIDING TYPE); PIPE, CAST IN PLACE PIPE LAYING MACHINE; PULVA-MIXER OR SIMILAR TYPES; PUMP OPERATOR, MORE THAN FIVE (5) PUMPS (ANY SIZE); RAIL, BALLAST COMPACTOR, REGULATOR, OR TAMPER MACHINES; SERVICE OILER (GREASER); SWEEPER SELF-PROPELLED; TRACTOR, RUBBER-TIRED, FIFTY (50) HP FLYWHEEL AND UNDER; TRENCHING MACHINE OPERATOR, MAXIMUM DIGGING CAPACITY THREE FOOT (3') DEPTH; TUNNEL, LOCOMOTIVE, DINKEY; TUNNEL, POWER JUMBO SETTING SLIP FORMS, ETC. PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $51.31 | $17.15 | $68.46 |
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT, PUGMILL (ANY TYPE); ASPHALT, RAKER; ASPHALT, TRUCK MOUNTED ASPHALT SPREADER, WITH SCREED; AUGER OILER; BOATMAN; BOBCAT, SKID STEED (LESS THAN ONE (1) YARD); ...POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT, PUGMILL (ANY TYPE); ASPHALT, RAKER; ASPHALT, TRUCK MOUNTED ASPHALT SPREADER, WITH SCREED; AUGER OILER; BOATMAN; BOBCAT, SKID STEED (LESS THAN ONE (1) YARD); BROOM, SELF-PROPELLED; COMPRESSOR OPERATOR (ANY POWER) UNDER 1,250 CU. FT. TOTAL CAPACITY; CONCRETE CURING MACHINE (RIDING TYPE); CONCRETE SAW; CONVEYOR OPERATOR OR ASSISTANT; CRANE, TUGGER; CRUSHER FEEDERMAN; CRUSHER OILER; DECKHAND; DRILL, DIRECTIONAL LOCATOR; FORK LIFT; GRADE CHECKER; GUARDRAIL PUNCH OILER; HYDROGRAPHIC SEEDER MACHINE, STRAW, PULP OR SEED; HYDROSTATIC PUMP OPERATOR; MIXER BOX (CTB, DRY BATCH, ETC.); OILER; PLANT OILER; PUMP (ANY POWER); RAIL, BRAKEMAN, SWITCHMAN, MOTORMAN; RAIL, TAMPING MACHINE, MECHANICAL, SELF-PROPELLED; RIGGER; ROLLER GRADING (NOT ASPHALT); TRUCK, CRANE OILER-DRIVER PACIFIC COUNTY (REMAINDER OF COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTERSTATE 84 AND WEST OF MILE POST 30 ON STATE HIGHWAY 26 AND WEST OF MILE POST 30 ON HIGHWAY 22 AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY, WASHINGTON EXCEPT THAT PORTION OF COWLITZ COUNTY IN THE MT. ST. HELENS "BLAST ZONE" SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED IN THE AREA OUTSIDE THE IDENTIFIED BOUNDARY ABOVE, BUT LESS THAN 50 MILES FROM THE PORTLAND CITY HALL SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE PORTLAND CITY HALL, BUT OUTSIDE THE IDENTIFIED BORDER ABOVE, SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS. FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG ALL JOBS OR PROJECTS LOCATED WITHIN 30 MILES OF THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS | ENGI0701-012 01/01/2025 | $48.09 | $17.15 | $65.24 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 45 TONS THRU 99 TONS; DERRICKS ON BUILDING WO...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 45 TONS THRU 99 TONS; DERRICKS ON BUILDING WORK; EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 50 METRIC TONS (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $ 0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $60.32 | $27.32 | $87.64 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 100 TONS AND OVER; TOWER CRANE UP TO 175 FT ...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 100 TONS AND OVER; TOWER CRANE UP TO 175 FT IN HEIGHT BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $ 0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $61.22 | $27.32 | $88.54 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE: OV...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE: OVER 90 METRIC TONS (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $ 0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $62.12 | $27.32 | $89.44 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN ...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $ 0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $62.99 | $27.32 | $90.31 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; CRANE-OVERHEAD, BRIDGE TYPE-20 TONS THROUGH 44 TONS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; DRILLIN...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; CRANE-OVERHEAD, BRIDGE TYPE-20 TONS THROUGH 44 TONS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; DRILLING MACHINE; GRADER-FINISHING (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $ 0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $59.56 | $27.32 | $86.88 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; A-FRAME CRANE OVER 10 TONS; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHME...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; A-FRAME CRANE OVER 10 TONS; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OILER; GRADER-NONFINISHING; BOOM TRUCK OVER 10 TONS (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $ 0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $58.89 | $27.32 | $86.21 |
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS; BOOMTRUCK 10 TONS AND UNDER (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTE...POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS; BOOMTRUCK 10 TONS AND UNDER (PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY TO THE SEA) COUNTY) HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELIGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | ENGI0612-019 06/01/2025 | $55.13 | $27.32 | $82.45 |
| TRUCK DRIVER: 10 YARD TRUCK | SUWA2009-046 08/07/2009 | $24.61 | $8.34 | $32.95 |
| TRUCK DRIVER: DUMP TRUCK | SUWA2009-046 08/07/2009 | $20.50 | $6.56 | $27.06 |
| TRUCK DRIVER: WATER TRUCK | SUWA2009-046 08/07/2009 | $24.36 | $8.30 | $32.66 |
2 of 2: WD WA20260080, Mod 1
Make a WH-347 with these ratesScope as published: Dredging Construction Projects (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)
Some rows apply only to an area or zone named in the classification. The area text is printed exactly as published; check it against your project's location before you use a row.
| Classification | Rate ID | Base | Fringe | Total / hour |
|---|---|---|---|---|
| DREDGING: ASSISTANT ENGINEER ZONE A | ENGI0701-003 01/01/2024 | $53.31 | $16.70 | $70.01 |
| DREDGING: ASSISTANT ENGINEER ZONE B | ENGI0701-003 01/01/2024 | $56.31 | $16.70 | $73.01 |
| DREDGING: ASSISTANT ENGINEER ZONE C | ENGI0701-003 01/01/2024 | $59.31 | $16.70 | $76.01 |
| DREDGING: ASSISTANT MATE ZONE A | ENGI0701-003 01/01/2024 | $47.95 | $16.70 | $64.65 |
| DREDGING: ASSISTANT MATE ZONE B | ENGI0701-003 01/01/2024 | $50.95 | $16.70 | $67.65 |
| DREDGING: ASSISTANT MATE ZONE C | ENGI0701-003 01/01/2024 | $53.95 | $16.70 | $70.65 |
| DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A | ENGI0701-003 01/01/2024 | $56.47 | $16.70 | $73.17 |
| DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B | ENGI0701-003 01/01/2024 | $59.47 | $16.70 | $76.17 |
| DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C | ENGI0701-003 01/01/2024 | $62.47 | $16.70 | $79.17 |
| DREDGING: LEVERMAN, HYDRAULIC ZONE A | ENGI0701-003 01/01/2024 | $56.47 | $16.70 | $73.17 |
| DREDGING: LEVERMAN, HYDRAULIC ZONE B | ENGI0701-003 01/01/2024 | $59.47 | $16.70 | $76.17 |
| DREDGING: LEVERMAN, HYDRAULIC ZONE C | ENGI0701-003 01/01/2024 | $62.47 | $16.70 | $79.17 |
| DREDGING: TENDERMAN ZONE A | ENGI0701-003 01/01/2024 | $51.82 | $16.70 | $68.52 |
| DREDGING: TENDERMAN ZONE B | ENGI0701-003 01/01/2024 | $54.82 | $16.70 | $71.52 |
| DREDGING: TENDERMAN ZONE C | ENGI0701-003 01/01/2024 | $57.82 | $16.70 | $74.52 |
DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 1 ASSISTANT MATE (DECKHAND) (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $35.93 | $17.40 | $53.33 |
DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF T...DREDGING: ZONE 1: GROUP 2 OILER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $36.93 | $17.40 | $54.33 |
DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HAR...DREDGING: ZONE 1: GROUP 3 ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM OR BOOSTER PUMP); MATES AND BOATMEN (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $37.35 | $17.40 | $54.75 |
DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON,...DREDGING: ZONE 1: GROUP 4 CRANEMAN, ENGINEER WELDER (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $38.39 | $17.40 | $55.79 |
DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANO...DREDGING: ZONE 1: GROUP 5 LEVERMAN, HYDRAULIC (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $36.93 | $17.40 | $54.33 |
DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WES...DREDGING: ZONE 1: GROUP 6 MAINTENANCE (CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES) ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA | ENGI0302-030 06/01/2014 | $37.35 | $17.40 | $54.75 |
HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 1: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $29.76 | $20.65 | $50.41 |
HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 2: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $30.08 | $20.65 | $50.73 |
HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 3: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $30.69 | $20.65 | $51.34 |
HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 4: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $30.85 | $20.65 | $51.50 |
HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 5: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $31.01 | $20.65 | $51.66 |
HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 6: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $31.29 | $20.65 | $51.94 |
HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE...HYDRAULIC DREDGE: GROUP 7: (ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES WORK PERFORMED ON HYDRAULIC DREDGES) | ENGI0302-128 06/01/2021 | $31.56 | $20.65 | $52.21 |
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE ...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $60.63 | $27.32 | $87.95 |
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 T...POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER (ELECTRIC, DIESEL, STEAM, OR BOOSTER PUMP); MATES & BOATMEN (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $60.63 | $27.32 | $87.95 |
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILE...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $62.32 | $27.32 | $89.64 |
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZON...POWER EQUIPMENT OPERATOR: ENGINNER WELDER (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $62.32 | $27.32 | $89.64 |
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS ...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $64.11 | $27.32 | $91.43 |
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO...POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $64.11 | $27.32 | $91.43 |
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 ...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (LEWIS, PACIFIC(NORTH OF A LINE EXTENDING FROM THE NORTHWEST CORNER OF WAHKIAKUM COUNTY TO THE PACIFIC OCEAN), AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-013 06/01/2025 | $59.96 | $27.32 | $87.28 |
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) -...POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE (DECKHAND) (PIERCE COUNTY) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 (26-45 RADIUS MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 (OVER 45 RADIUS MILES) - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA | ENGI0612-002 06/01/2025 | $59.96 | $27.32 | $87.28 |
Questions about these rates
What is the Davis-Bacon rate for electricians on heavy work in Pacific County?
What is the Davis-Bacon rate for plumbers on heavy work in Pacific County?
What is the Davis-Bacon rate for carpenters on heavy work in Pacific County?
Which wage determination applies to my project?
What counts as heavy construction?
What if my worker's trade is not on the list?
Using these rates on a WH-347
Each worker's line on the WH-347 needs the classification as it appears in the WD, a straight-time rate at least the base rate, and the fringe met in cash, through a bona fide plan, or both (see fringe benefits, with the math). Put the WD number and modification in the header.
Make this week's WH-347 with WA20260055
Other counties: all Washington counties · WD lookup
Your first certified payroll is free.
Upload last week's payroll, get a checked WH-347 back today.
No card. Same full report, no watermark.